[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-241458-105":53,"doc-detail-241458-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","quality-control-plan-water-saving-devices-and-toilets-fixtures","Quality Control Plan - Water Saving Devices and Toilets Fixtures","","Quality Control Plan template defining minimum quality control roles and activities for supplying, delivering, and installing water saving devices and toilet fixtures for WIT projects in Amman & Zarqa. It guides suppliers on meeting contract quality standards through early and ongoing quality processes, scheduled reviews of deliverables, properly skilled personnel, and document control. It specifies project information handling, testing and site inspection requirements, and non-conformance actions. Additional tests may be required by Mercy Corps according to Jordan Standards and JSMO.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/quality-control-plan-water-saving-devices-and-toilets-fixtures/241458/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/quality-control-plan-water-saving-devices-and-toilets-fixtures/241458.png","ImageObject",442,249,{"name":88,"@type":89},"Caleb Sterling","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-11","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":73},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of this Quality Control Plan template?","Question",{"text":108,"@type":109},"It helps suppliers follow required quality standards during the project by submitting tender documentation, implementing quality processes early and throughout the work, and documenting review activities.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What records and document control requirements apply after Mercy Corps approval?",{"text":113,"@type":109},"After approval, the plan must be available to concerned employees, each document must show preparation date with page numbering, and revisions must be dated and recorded in a revisions table.",{"name":115,"@type":106,"acceptedAnswer":116},"How are essential specifications and testing requirements enforced on site?",{"text":117,"@type":109},"Mechanical specs must meet specified Jordan standards (including JSMO references), site inspections must cover pressure/leakage and observation/counting across first, second, and final fix stages, and additional tests may be required by Mercy Corps and conducted at no extra cost.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},241458,1791717279,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":15,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":73,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":9},962084925290,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","QUALITY CONTROL PLAN  \n\n| PR/MAR \\#: 3675 | Tender \\#: MC-23-2021 |\n| --- | --- |\n| PR/MAR Description: Supply, Deliver and Install Water Saving Devices and Toilets Fixtures in Different Entities in Amman & Zarqa |  |\n\n• The following Quality Control Plan describes the roles and activities associated with executing the minimum quality control requirements listed herein.  \nPurpose  \nThe purpose of this Quality Control Plan template is to assist the suppliers in following the required standards of quality during the Project, through the submission of tender documentation, implementation/installation of quality processes early and throughout and after the implementation/installation. The Suppliers will achieve this by providing adequate time in the schedule for thorough reviews of the deliverables, using appropriately skilled personnel, and documenting review processes.  \nAfter obtaining Mercy Corps approval, the Quality Control Plan shall be available to all concerned employees. Each document in the plan shall indicate its preparation date and all pages shall be numbered. If a document is revised, the date of revision shall be indicated on the document and recorded in a table of revisions.  \nProject Information  \nThis Quality Control Plan is written to meet the requirements for the supply and installation of water saving devices and toilets fixtures for WIT projects. The Quality Control Plan has been developed to ensure compliance with the requirements set forth in the contract for this Project  \nThe submitted plan must take into consideration project specifications, special conditions and Jordanian standards as mentioned in the Jordanian General specification (the green book) .  \nIt is the Supplier responsibility to provide Mercy Corps with all required evidence which proof that all provided technologies and works were performed as required in the contract documents. Mercy Corps has the right to ask for additional specific tests and procedures whenever required in accordance with Jordan Standards and Metrology Organization (JSMO) and the supplier shall carry out all these tests without any additional cost.  \nEssential Specifications and Testing Requirements  \nAll items  \nMercy Corps team must ensure that the approved suppliers quality control plan including testing, applies properly on site such as:  \n1. Mechanical specs: All materials and fixtures as per specification and Jordan Standards and Metrology Organization (JSMO) JS 2061 2014  \n2. Site inspection for mechanical fixtures (first fix, second fix and final fix):  \na. Pressure and water leakage  \nb. Observation and counting  \n3. Any other quality control needed tests as per standards and procedures.  \n4. MC representatives will perform two site visits for each facility to randomly check that fixtures are installed.  \nNon-Conformance  \nIn case of non-conformance, the sample/item will be rejected and the supplier will be required to supply another approved sample/item.","cbCaidYnuFSc0E98","https://ap.wps.com/l/cbCaidYnuFSc0E98","pdf",44648,"English","# Purpose\n# Project Information\n# Essential Specifications and Testing Requirements\n## Mechanical specifications and JSMO standards\n## Site inspection (first fix, second fix, final fix)\n## Additional required quality control tests\n# Non-Conformance","[{\"question\":\"What is the purpose of this Quality Control Plan template?\",\"answer\":\"It helps suppliers follow required quality standards during the project by submitting tender documentation, implementing quality processes early and throughout the work, and documenting review activities.\"},{\"question\":\"What records and document control requirements apply after Mercy Corps approval?\",\"answer\":\"After approval, the plan must be available to concerned employees, each document must show preparation date with page numbering, and revisions must be dated and recorded in a revisions table.\"},{\"question\":\"How are essential specifications and testing requirements enforced on site?\",\"answer\":\"Mechanical specs must meet specified Jordan standards (including JSMO references), site inspections must cover pressure/leakage and observation/counting across first, second, and final fix stages, and additional tests may be required by Mercy Corps and conducted at no extra cost.\"}]","Quality Control Plan - Water Saving Devices and Toilets Fixtures | PDF",1789175644]