[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-241457-105":53,"doc-detail-241457-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","quality-control-plan-air-conditioners-for-dfid-project","Quality Control Plan - Air Conditioners for DFID Project","","Quality Control Plan establishes roles and activities for executing minimum quality control requirements during DFID infrastructure projects focused on air conditioner delivery and study implementation. The plan supports early and continuous quality processing by scheduling thorough reviews, using appropriately skilled personnel, and documenting review records after Mercy Corps approval. It includes project identification, compliance intent, essential specifications and testing checkpoints (visual, acoustic, and certification-based), and clear actions for non-conformance, including sample rejection and supplier replacement with approved items.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/quality-control-plan-air-conditioners-for-dfid-project/241457/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/quality-control-plan-air-conditioners-for-dfid-project/241457.png","ImageObject",442,249,{"name":88,"@type":89},"Felix Montgomery","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-15","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",10,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the purpose of this Quality Control Plan?","Question",{"text":109,"@type":110},"It helps consultants maintain standard quality throughout the project by implementing quality processes early and throughout the study, including thorough deliverable reviews, skilled personnel, and documented review procedures.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What information and documentation requirements are specified in the plan?",{"text":114,"@type":110},"After Mercy Corps approval, the plan is shared with concerned employees. Each document must show its preparation date, all pages must be numbered, and revisions must record the revision date in a revisions table.",{"name":116,"@type":107,"acceptedAnswer":117},"What happens in case of non-conformance?",{"text":118,"@type":110},"The sample/item will be rejected, and the supplier must provide another approved sample/item to replace the non-conforming one.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},241457,1791742716,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":73,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":9},549768064778,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","QUALITY CONTROL PLAN  \n\n| PR/MAR \\#: AMM 3087 | Tender \\#: MC-32-2020 |\n| --- | --- |\n| PR/MAR Description: 91146-AC’s for Y5 Infrastructure projects – DFID |  |\n\n􀁸 The following Quality Control Plan describes the roles and activities associated with executing the minimum quality control requirements listed herein.  \nPurpose  \nThe purpose of this Quality Control Plan template is to assist Consultants in following the standard of quality during the Project through implementation of quality processes early and throughout the study. The Consultants will achieve this by providing adequate time in the schedule for thorough reviews of the deliverables, using appropriately skilled personnel, and documenting review processes.  \nAfter obtaining Mercy Corps approval, the Quality Control Plan shall be available to all concerned employees. Each document in the plan shall indicate its preparation date and all pages shall be numbered. If a document is revised, the date of revision shall be indicated on the document and recorded in a table of revisions.  \nProject Information  \nThis Quality Control Plan is written to meet the requirements of the Air Conditioners for DFID projects. The Quality Control Plan has been developed to ensure compliance with the requirements set forth in the contract for this Project.  \nEssential Specifications and Testing Requirements  \nAll items  \n\n| Parameter | Margi\u003Cbr>n of\u003Cbr>Error | Inspection checkpoints | Testing\u003Cbr>Method\u003Cbr>(Lab Test,\u003Cbr>Visual,\u003Cbr>Certificate...) | Performed / Reviewed by: |\n| --- | --- | --- | --- | --- |\n| Capacity | 0 | According to the specifications | Visual | Mercy Corps Program representative and ministry representative |\n| Air Outlet and Inlet | 0 | Should be clean of dirt and dust | Visual | Mercy Corps Program representative and ministry representative |\n| AC fans & Motors | 0 | Balanced and free of excessive Vibration / Noise | Acoustic | Mercy Corps Program representative and ministry representative |\n| Stability | 0 | Compatible with wall and ceiling system | Visual | Mercy Corps Program representative and ministry representative |\n| Valve Optional positions | 0 | ( open Vs close) should be clearly indicated | Visual | Mercy Corps Program representative and ministry representative |\n| Packaging | 0 | The Ac’s should be wrapped and sealed in a good way to prevent Breaking and scratches. | Visual | Mercy Corps Program representative and ministry representative |\n| Installation | 0 | It should be with Clearance for inspection | Visual | Mercy Corps Program representative and ministry representative |\n\nNon-Conformance  \nIn case of non-conformance, the sample/item will be rejected and the supplier will be required to supply another approved sample/item.","cbCaifIFtIGl1VKg","https://ap.wps.com/l/cbCaifIFtIGl1VKg","pdf",427737,"English","# Purpose\n# Project Information\n# Essential Specifications and Testing Requirements\n## Inspection checkpoints\n## Testing methods\n# Non-Conformance","[{\"question\":\"What is the purpose of this Quality Control Plan?\",\"answer\":\"It helps consultants maintain standard quality throughout the project by implementing quality processes early and throughout the study, including thorough deliverable reviews, skilled personnel, and documented review procedures.\"},{\"question\":\"What information and documentation requirements are specified in the plan?\",\"answer\":\"After Mercy Corps approval, the plan is shared with concerned employees. Each document must show its preparation date, all pages must be numbered, and revisions must record the revision date in a revisions table.\"},{\"question\":\"What happens in case of non-conformance?\",\"answer\":\"The sample/item will be rejected, and the supplier must provide another approved sample/item to replace the non-conforming one.\"}]","Quality Control Plan - Air Conditioners for DFID Project | PDF",1789175642]