[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-356876-105":53,"doc-detail-356876-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","qs-ap-5202","QS-AP-52.0.2","","Document text summarizes revision changes across multiple question clauses (e.g., Q736, Q741, Q716, Q717, Q718, Q720, Q728, Q734, Q737) covering streamlined COTS/MIL specifications, production and manufacturing equipment availability, and multiple flowdown or approval requirements. It includes detailed clause requirements for consigned material reporting (Q701) and subcontractor flowdown for industry standard revisions (Q702), plus Quality Management System registration and review obligations (Q703) and compliance requirements (Q704).",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/qs-ap-5202/356876/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/qs-ap-5202/356876.png","ImageObject",442,249,{"name":88,"@type":89},"Rizky","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-22","2026-09-23",true,{"@type":98,"interactionType":99,"userInteractionCount":47},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What does the document cover in the revision change summaries?","Question",{"text":108,"@type":109},"It lists targeted updates across multiple clause numbers, including specification streamlining, approval or notification clarifications, equipment availability, and several new or renumbered clauses.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What is required under Q701 Consigned Material Reporting?",{"text":113,"@type":109},"The clause requires accounting of consigned materials consumed during manufacture but not included in the delivered product, reported in the Certificate of Conformance by part number and quantity consumed.",{"name":115,"@type":106,"acceptedAnswer":116},"What flowdown obligations are stated under Q702 for industry standard revisions?",{"text":117,"@type":109},"Revisions or replacements to referenced government/industry standards are treated as process changes requiring GD-OTS written approval before implementation, and the clause must be flowed to subcontractors for items purchased under the purchase order.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},356876,1791372825,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":47,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":20},962085564807,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","Summary of changes from R10 to R11:  \n• Q736: COTS/MIL spec. streamlining  \n• Q741: COTS/MIL spec. streamlining  \nSummary of changes from R9 to R10:  \n• Q716 Alt 1: Added definition of steady rate production when using Z1 .4 switching rules  \n• Q716 Alt 2: Added definition of steady rate production when using Z1 .4 switching rules  \n• Q717: Clarified that only rejected lots require FSAR/CAP approval prior to presenting for acceptance  \n• Q718: Specified that all production and manufacturing related equipment must be available  \n• Q720: Added FY20-24 Government Prime Contract Number  \n• Q720,III,4: Completed sentence  \n• Q728: Removed obsolete contract reference from ATT0012; Added ‘Validation Not Required’level  \n• Q734: Add hard copy ADC for BLATs  \n• Q737: Updated to include SDRL No. S737  \nSummary of key changes from FY14-18  \n• Q709: Submittal date adjusted to match prime contract requirement.  \n• Q710: Added a flowdown requirement for GCAR notification.  \n• Q714: Added a flowdown requirement for disclosure of NCM.  \n• Q716 Alt 2: Sampling level reduced from ASQ Z1 .4 Level 2 to Level 1 for Minor characteristics, where applicable (i.e. where the TDP requires sampling IAW Z1 .4) .  \n• Q717: Added a flowdown requirement for LAT. Changed notification time.  \n• Q718: Suppliers required to prepare & submit ITE reports.  \n• Q720: Added default sample sizes.  \n• Q727: Added optional template  \n• Q728: Adjusted FAT/TFAT report submittal time requirements. Addressed maintenance of baseline documentation affected by process change.  \n• Q728-1: New clause for pre-validation activity (i.e. dry runs) .  \n• Q730: Added allowance GD-OTS approved supplier format.  \n• Q731: Update Verify web address  \n• Q732: Clarified direction must come via purchase order  \n• Q733: Updated wording regarding delivery of GD-OTS approval  \n• Q742: Added a flowdown requirement for Corrosion Prevention and Control.  \n• Q750: Replaced Supplier Key Performance Data reporting requirement with Supplier Production Readiness Verification (SPRV) .  \n• Q753: Renumbered as Q728-1.  \n• Q753: New clause for determining test data conformance  \n• Q754: New clause for conformance, safety, and ethics awareness  \n• Q755: New clause for counterfeit part prevention  \nQ701 Consigned Material Reporting (Rev 06/03/20)  \nThis clause requires the following SDRL deliverable(s): S701-See Exhibit A for details.  \nYou are provided materials by GD-OTS that are used in the products you manufacture for GD-OTS. An accounting of these materials that are consumed during the manufacture of a lot of product but not included in product in the shipment ([e.g. parts](e.g. parts) consumed during destructive testing, Lot Acceptance Testing, or scrapped in process as part of a scrapped assembly or sub assembly) must be accounted for. Include, on your Certificate of Conformance (CoC) for each lot, an inventory accounting by part number of the quantity of consigned parts consumed during the manufacture of the lot that are not included in the delivered product.  \nQ702 Industry Standard Revisions **Flowdown to Subcontractors Required** (Rev 06/12/20)  \nRevisions or replacements to Government/Industry Standards referenced in the Technical Data Package (TDP) or referenced within these Standards, including those for raw materials, shall be considered process changes. (Examples of Government Standards are documents controlled by the Government and typically begin with MIL-STD, MIL-DTL, MIL-PRF, etc. Industry Standards are those controlled by organizations such as ASTM, ANSI, SAE, etc. ) Should there be a need to move to a new revision after completion of the Baseline Qualification, Seller shall request and must receive written GD-OTS approval prior to implementing any revision or replacement to a referenced Government/Industry Standard in order to determine the revised standard’s impact on product. Seller's request for such a change shall be formally submitted to the GD-OTS Subcontract Manager using the GD-","cbCaiiwBtBTmzLFC","https://ap.wps.com/l/cbCaiiwBtBTmzLFC","pdf",404211,39,"English","# Summary of key changes from R10 to R11\n# Summary of changes from R9 to R10\n# Summary of key changes from FY14-18\n# Q701 Consigned Material Reporting\n# Q702 Industry Standard Revisions - Flowdown to Subcontractors Required\n# Q703 ISO 9001 or AS9100 Registration\n# Q704 ISO 9001 or AS9100 Compliance","[{\"question\":\"What does the document cover in the revision change summaries?\",\"answer\":\"It lists targeted updates across multiple clause numbers, including specification streamlining, approval or notification clarifications, equipment availability, and several new or renumbered clauses.\"},{\"question\":\"What is required under Q701 Consigned Material Reporting?\",\"answer\":\"The clause requires accounting of consigned materials consumed during manufacture but not included in the delivered product, reported in the Certificate of Conformance by part number and quantity consumed.\"},{\"question\":\"What flowdown obligations are stated under Q702 for industry standard revisions?\",\"answer\":\"Revisions or replacements to referenced government/industry standards are treated as process changes requiring GD-OTS written approval before implementation, and the clause must be flowed to subcontractors for items purchased under the purchase order.\"}]","QS-AP-52.0.2 | PDF",1790127868]