[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243887-105":53,"doc-detail-243887-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","psi-10-schedule-management-prostep-ivipvda-recommendation","PSI 10 - Schedule Management - PROSTEP iViP/VDA Recommendation","","The PROSTEP iViP/VDA recommendation defines requirements for a tool-assisted schedule management solution for the automotive industry. It presents a standardized criterion catalog at a detailed concept level (VDA 4959) and explains how to apply it. The document covers general and specialist concept requirements, including schedule structure, cross-schedule links, usability, reporting, IT concepts such as interfaces, performance, and security, plus support and supplier obligations. It also provides schedule management use cases.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/psi-10-schedule-management-prostep-ivipvda-recommendation/243887/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/psi-10-schedule-management-prostep-ivipvda-recommendation/243887.png","ImageObject",442,249,{"name":88,"@type":89},"Violet","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-20","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",7,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the purpose of the PROSTEP iViP/VDA schedule management recommendation?","Question",{"text":109,"@type":110},"It provides recommendations and a standardized criterion catalog for implementing schedule management tools in the automotive industry.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What types of requirements are covered by the criterion catalog?",{"text":114,"@type":110},"It covers general requirements, specialist concept requirements for schedule content and structure, IT concept requirements for tools and interfaces, and other requirements such as support and supplier obligations.",{"name":116,"@type":107,"acceptedAnswer":117},"Which schedule management use cases are included?",{"text":118,"@type":110},"The document lists use cases such as creating and linking schedules, managing and formatting schedules, exporting and assessing schedules, handling multi-project views, changing schedules, running optional simulations, and archiving project schedules.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},243887,1791746412,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":35},4398048950312,"https://ap-avatar.wpscdn.com/avatar/400002538284de19e3c?_k=1778320343897328908","Recommendation for schedule management  \nRequirements relating to a schedule management tool for the automotive industry  \nStandardized criterion catalog at detailed concept level VDA 4959  \nPSI 10  \nA joint Publication of  \nProSTEP iViP and Verband der Automobilindustrie (VDA)  \nI I  \nPROSTEP IVIP/VDA RECOMMENDATION  \nDisclaimer  \nVDA/ProSTEP iViP Recommendations (VDA/PSI Recommendations) are recommendations that are available for general use. Anyone using these recommendations is responsible for ensuring that they are used correctly.  \nThis VDA/PSI Recommendation gives due consideration to the prevailing state-of-the-art at the time of publication. Anyone using VDA/PSI Recommendations must assume responsibility for his or her actions and acts at her/his own risk. The ProSTEP iViP Association, the VDA and the parties involved in drawing up the VDA/PSI Recommendation assume no liability whatsoever. We request that anyone encountering an error or the possibility of an incorrect interpretation when using the VDA/PSI Recommendation should contact the ProSTEP iViP Association ([psiissues@prostep.com](psiissues@prostep.com)) immediately so that any errors can be rectified.  \nCopyright  \nI. All rights to this VDA/PSI Recommendation, in particular the copyright rights of use, and sale such as the right to duplicate, distribute or publish the recommendation, remain exclusively with the ProSTEP iViP Association and the VDA as well as their members.  \nII. This VDA/PSI Recommendation may be duplicated and distributed unchanged, for instance for use in the context of creating software or services.  \nIII. It is not permitted to change or edit this VDA/PSI Recommendation.  \nIV. A suitable notice indicating the copyright owner and the restrictions on use must always appear.  \nSCHEDULE MANAGEMENT / AUGUST 2015  \nPROSTEP IVIP/VDA RECOMMENDATION  \nTable of Content   \nList of abbreviations V  \nIntroduction to using the current recommendation VI 1. Schedule management 2 1.1. The significance and development of schedule management 2 1.2. Schedule management in the automotive industry 2 1.2.1. Phases and the use of milestones 2 1.2.2. Functional networking along the tool chain 3 1.2.3. Organizational networking throughout the supply chain 5 1.2.4. Networking within the project from SoP through to component level 6 1.2.5. Mapping the product structure to the development network 8  \n1.3. Schedule management tools 9 2. How to use the criterion catalog 13 2.1. Evaluation of the initial situation in simulation management processes 13 2.2. Benchmarking solution suppliers 14 2.3. Product specification for solution suppliers 15 3. Criterion catalog: Requirements placed on a tool-assisted schedule management solution 16  for networked project partners  3.1. General requirements 17 3.1.1. System philosophy and system properties 17 3.1.2. Master data 18  \n3.2. Specialist concept: Requirements in terms of the content of the schedule management solution 18 3.2.1. Compliance with standards, creation of and adherence to standards 18 3.2.2. Operations, operation lists, internal links within the schedule and scheduling 19 3.2.3. Structure and display of the schedule, cross-schedule links 21 3.2.4. Schedule control and cross-schedule operation 23 3.2.5. Usability, handling and menu guidance 24 3.2.6. Data outputs, reports and print functions 25  \n3.3. IT concept: Tool and interface requirements 27 3.3.1. System/tool philosophy and system architecture 27 3.3.2. Load and performance requirements 28 3.3.3. Method and data interfaces 28 3.3.4. Deletion of data, data security and system security 30  \n3.4. Other requirements 31 3.4.1. Support, maintenance and further development of the tool 31 3.4.2. Requirements placed on the tool supplier 33  \n4. Schedule Management Use Cases 34 4.1 Create schedule 34 4.2 Link schedules 35 4.3 Manage project 35 4.4 Format schedule 36 4.5 Export schedule 36 4.6 Assess project schedule 37 4.7 Create multi-project views 37 4.8 Change proje","cbCaikU9NtrWMwJj","https://ap.wps.com/l/cbCaikU9NtrWMwJj","pdf",2790329,49,"English","# Introduction to using the current recommendation\n# Schedule management\n## The significance and development of schedule management\n## Schedule management in the automotive industry\n### Phases and the use of milestones\n### Functional networking along the tool chain\n### Organizational networking throughout the supply chain\n### Networking within the project from SoP through to component level\n### Mapping the product structure to the development network\n## Schedule management tools\n# How to use the criterion catalog\n## Evaluation of the initial situation in simulation management processes\n## Benchmarking solution suppliers\n## Product specification for solution suppliers\n# Criterion catalog: Requirements placed on a tool-assisted schedule management solution\n## General requirements\n## Specialist concept\n## IT concept\n## Other requirements\n# Schedule Management Use Cases\n## Create schedule\n## Link schedules\n## Manage project\n## Format schedule\n## Export schedule\n## Assess project schedule\n## Create multi-project views\n## Change project schedule\n## Create scenario / Simulation (optional)\n## Archive project schedule\n# Relevant regulatory and industry standards\n# References and additional material","[{\"question\":\"What is the purpose of the PROSTEP iViP/VDA schedule management recommendation?\",\"answer\":\"It provides recommendations and a standardized criterion catalog for implementing schedule management tools in the automotive industry.\"},{\"question\":\"What types of requirements are covered by the criterion catalog?\",\"answer\":\"It covers general requirements, specialist concept requirements for schedule content and structure, IT concept requirements for tools and interfaces, and other requirements such as support and supplier obligations.\"},{\"question\":\"Which schedule management use cases are included?\",\"answer\":\"The document lists use cases such as creating and linking schedules, managing and formatting schedules, exporting and assessing schedules, handling multi-project views, changing schedules, running optional simulations, and archiving project schedules.\"}]","PSI 10 - Schedule Management - PROSTEP iViP/VDA Recommendation | PDF",1789209712]