[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-178191-105":53,"doc-detail-178191-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","project-specific-certification-plan-revision-ir-template","Project Specific Certification Plan - Revision IR - Template","","Project Specific Certification Plan (PSCP) defines and documents the requirements and tasks needed for a proposed FAA certification project, including scope, project information, safety assessment, schedule, and certification basis. It specifies certification activities and how compliance will be shown through means of compliance, documentation deliverables, and a compliance checklist. It also outlines conformity inspection, continued operational safety, delegation and communication expectations, issue resolution guidance, and special project considerations, supported by appendices for acronyms and reference documents.",{"@graph":63,"@context":123},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/project-specific-certification-plan-revision-ir-template/178191/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/project-specific-certification-plan-revision-ir-template/178191.png","ImageObject",442,249,{"name":88,"@type":89},"Đào","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-24","2026-09-02",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",13,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115,119],{"name":106,"@type":107,"acceptedAnswer":108},"What is the purpose of a Project Specific Certification Plan (PSCP)?","Question",{"text":109,"@type":110},"The PSCP defines and documents the requirements and tasks needed for a proposed FAA certification project, including scope and certification activities.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How does the PSCP describe compliance and evidence?",{"text":114,"@type":110},"It specifies means of compliance (MOCs), documentation deliverables, and a compliance checklist to show and verify compliance with the certification basis.",{"name":116,"@type":107,"acceptedAnswer":117},"Who manages and maintains the PSCP, and how is concurrence handled?",{"text":118,"@type":110},"The PSCP is managed jointly by the FAA managing office branch and the applicant, with FAA concurrence documented using standard correspondence practices.",{"name":120,"@type":107,"acceptedAnswer":121},"What topics are covered for coordination and issue handling?",{"text":122,"@type":110},"The PSCP includes delegation and communication expectations, designees and authorized positions, and an issues resolution process with guidelines for resolving issues and preventing undue pressure or burden.","https://schema.org",{"og:url":78,"og:type":125,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":127,"canonical":78},"index,follow",{"doc_id":129,"site_id":56},178191,1788330775,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":88,"user_avatar":134,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":140,"language":141,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":61,"update_tm":130,"read_time":145},1374402968488,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Project Specific Certification Plan\n[Project Title]\n[Insert Applicant Document Number], Revision [IR]\nBetween\n[Insert the Name of the Applicant/Company]\nAnd\n[Insert name of ACO Branch] ACO Branch\n[Insert Address of ACO Branch]\n[FAA Project Number]\nFor FAA Project Number (leave blank until number assigned by the FAA), include the Applicant Project Number (If applicable) \u000f\nList of Revisions:\n\u000fDesignee Signatures\n\u000f\n\u0003Table of Contents\n\u0013 TOC \\o \"1-3\" \\h \\z \\u \u0014\u0013 HYPERLINK \\l \"_Toc69561297\" \u0014List of Revisions:\t\u0013 PAGEREF _Toc69561297 \\h \u00142\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561298\" \u0014Designee Signatures\t\u0013 PAGEREF _Toc69561298 \\h \u00143\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561299\" \u0014Table of Contents\t\u0013 PAGEREF _Toc69561299 \\h \u00144\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561300\" \u00141.0 GENERAL INFORMATION/PROJECT SCOPE\t\u0013 PAGEREF _Toc69561300 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561301\" \u00141.1 Project Information Summary:\t\u0013 PAGEREF _Toc69561301 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561302\" \u00142.0 PROJECT DESCRIPTION\t\u0013 PAGEREF _Toc69561302 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561303\" \u00142.1 New Aircraft, Engine and/or Propeller Certification\t\u0013 PAGEREF _Toc69561303 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561304\" \u00142.2 Changes to an Aircraft, Engine and/or Propeller Certification\t\u0013 PAGEREF _Toc69561304 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561305\" \u00142.3 FAA Aircraft Evaluation Division (AED) Involvement:\t\u0013 PAGEREF _Toc69561305 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561306\" \u00143.0 SAFETY ASSESSMENT\t\u0013 PAGEREF _Toc69561306 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561307\" \u00144.0 PROJECT SCHEDULE\t\u0013 PAGEREF _Toc69561307 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561308\" \u00144.1 Project Milestones\t\u0013 PAGEREF _Toc69561308 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561309\" \u00145.0 CERTIFICATION BASIS\t\u0013 PAGEREF _Toc69561309 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561310\" \u00145.1 Certification Basis and Change Product Rule Justification\t\u0013 PAGEREF _Toc69561310 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561311\" \u00145.2 Special Conditions\t\u0013 PAGEREF _Toc69561311 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561312\" \u00145.3 Equivalent Level of Safety Findings\t\u0013 PAGEREF _Toc69561312 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561313\" \u00145.4 Issue Papers\t\u0013 PAGEREF _Toc69561313 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561314\" \u00145.5 Exemptions\t\u0013 PAGEREF _Toc69561314 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561315\" \u00145.6 Airworthiness Directives\t\u0013 PAGEREF _Toc69561315 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561316\" \u00145.7 Part 26 Compliance Requirements\t\u0013 PAGEREF _Toc69561316 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561317\" \u00146.0 SHOWING and FINDING COMPLIANCE\t\u0013 PAGEREF _Toc69561317 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561318\" \u00146.1 Means of Compliance (MOCs)\t\u0013 PAGEREF _Toc69561318 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561319\" \u00146.1.1 Engineering Certification Test (T)\t\u0013 PAGEREF _Toc69561319 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561320\" \u00146.1.2 Flight Tests (FT) and Ground Tests (GT)\t\u0013 PAGEREF _Toc69561320 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561321\" \u00146.1.3 Analysis (AN)\t\u0013 PAGEREF _Toc69561321 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561322\" \u00146.1.4 Design Review (DR)\t\u0013 PAGEREF _Toc69561322 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561323\" \u00146.1.5 Compliance Inspection (CI)\t\u0013 PAGEREF _Toc69561323 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561324\" \u00146.2 Documentation\t\u0013 PAGEREF _Toc69561324 \\h \u001410\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561325\" \u0014Table 1 – Document Deliverables\t\u0013 PAGEREF _Toc69561325 \\h \u001410\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561326\" \u00146.3 Compliance Checklist\t\u0013 PAGEREF _Toc69561326 \\h \u001411\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561327\" \u0014Table 2 – Compliance Checklist\t\u0013 PAGEREF _Toc69561327 \\h \u001411\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561328\" \u00147.0 CONFORMITY INSPECTION\t\u0013 PAGEREF _Toc69561328 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561329\" \u00148.0 CONTINUED OPERATIONAL SAFETY (COS)\t\u0013 PAGEREF _Toc69561329 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561330\" \u00149.0 DELEGATION and COMMUNICATION\t\u0013 PAGEREF _Toc69561330 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561331\" \u00149.1 Designees (Engineering, Manufacturing, and Maintenance)\t\u0013 PAGEREF _Toc69561331 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561332\" \u0014Table 3 – Designees Authorized for this Project\t\u0013 PAGEREF _Toc69561332 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc69561333\" \u00149.2 Communication and Coordination Expectations\t\u0013 PAGEREF _Toc69561333 \\h \u001412\u0015\u0015\n\u0013 H","cbCaia79I3FpsnMD","https://ap.wps.com/l/cbCaia79I3FpsnMD","docx",88413,20,"English","# List of Revisions\n# Designee Signatures\n# Table of Contents\n# 1.0 General Information/Project Scope\n## 1.1 Project Information Summary\n# 2.0 Project Description\n## 2.1 New Aircraft, Engine and/or Propeller Certification\n## 2.2 Changes to an Aircraft, Engine and/or Propeller Certification\n## 2.3 FAA Aircraft Evaluation Division (AED) Involvement\n# 3.0 Safety Assessment\n# 4.0 Project Schedule\n## 4.1 Project Milestones\n# 5.0 Certification Basis\n## 5.1 Certification Basis and Change Product Rule Justification\n## 5.2 Special Conditions\n## 5.3 Equivalent Level of Safety Findings\n## 5.4 Issue Papers\n## 5.5 Exemptions\n## 5.6 Airworthiness Directives\n## 5.7 Part 26 Compliance Requirements\n# 6.0 Showing and Finding Compliance\n## 6.1 Means of Compliance (MOCs)\n## 6.2 Documentation\n## 6.3 Compliance Checklist\n# 7.0 Conformity Inspection\n# 8.0 Continued Operational Safety (COS)\n# 9.0 Delegation and Communication\n## 9.1 Designees (Engineering, Manufacturing, and Maintenance)\n## 9.2 Communication and Coordination Expectations\n## 9.3 Issues Resolution Process\n## 9.5 Undue Burden\n# 10.0 Special Project Considerations\n## 10.1 Foreign Notification and Validation\n# 11.0 Summary of PSCP Deviations\n# 12.0 Lessons Learned\n# Appendix A – Acronyms\n# Appendix B – Commonly Used Reference Documents\n# Appendix C – Example Functional Hazard Analysis (FHA)","[{\"question\":\"What is the purpose of a Project Specific Certification Plan (PSCP)?\",\"answer\":\"The PSCP defines and documents the requirements and tasks needed for a proposed FAA certification project, including scope and certification activities.\"},{\"question\":\"How does the PSCP describe compliance and evidence?\",\"answer\":\"It specifies means of compliance (MOCs), documentation deliverables, and a compliance checklist to show and verify compliance with the certification basis.\"},{\"question\":\"Who manages and maintains the PSCP, and how is concurrence handled?\",\"answer\":\"The PSCP is managed jointly by the FAA managing office branch and the applicant, with FAA concurrence documented using standard correspondence practices.\"},{\"question\":\"What topics are covered for coordination and issue handling?\",\"answer\":\"The PSCP includes delegation and communication expectations, designees and authorized positions, and an issues resolution process with guidelines for resolving issues and preventing undue pressure or burden.\"}]","Project Specific Certification Plan - Revision IR - Template | DOCX",7]