[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-173919-105":53,"doc-detail-173919-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","project-name-project-number-bid-proposal-form","PROJECT NAME, PROJECT NUMBER (#) - Bid Proposal Form","","Bid proposal form for California State University covering a construction project at the state’s direction. Includes identification of the project name and number, the offer to furnish labor, materials, tools, equipment, facilities, transportation, and required permits, and the total base bid stated as a lump sum in figures. Defines base bid allowances, additive and deductive alternatives for award calculations, and requirements for unit-pricing revisions for drilled caisson foundations, including DVBE participation and submission rules.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/project-name-project-number-bid-proposal-form/173919/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/project-name-project-number-bid-proposal-form/173919.png","ImageObject",442,249,{"name":88,"@type":89},"Jake","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-19","2026-09-02",true,{"@type":98,"interactionType":99,"userInteractionCount":15},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"How must the base bid amount and alternative amounts be presented?","Question",{"text":108,"@type":109},"The base bid and all alternatives must be stated in figures only. Any alterations or changes must be clearly indicated and initialed by the bidder.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What determines the award under the stated basis of award?",{"text":113,"@type":109},"The award goes to the responsible bidder submitting the lowest total of the base contract and the selected additive or deductive alternatives, as limited by the Trustees’ construction budget.",{"name":115,"@type":106,"acceptedAnswer":116},"How are drilled caisson foundation prices handled if depths differ?",{"text":117,"@type":109},"The drilled caisson foundation lump sum is subject to revision based on the unit price values provided if required caisson depths differ from the depths in the plans and specifications.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},173919,1790178200,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":15,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":9},962084928904,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","PROJECT NAME, PROJECT NUMBER (#)\nCALIFORNIA STATE UNIVERSITY,\nAddress\nCity, CA  Zip\nTo the Trustees of the California State University, on behalf of the State of California (hereinafter called the Trustees):\nThe undersigned bidder hereby offers, in the amount stated below, to furnish all labor, materials, tools, equipment, apparatus, facilities, transportation and permits for the construction of the (project name) at California State University, \t\t, if this offer is accepted by the Trustees.\nTOTAL AMOUNT OF BASE BID:  \t$\tLUMP SUM\n(use figures only)\nBidder shall include Allowances and Lump Sum Amount for Drilled Caisson Foundations in Base Bid Lump Sum Price.\nThe Base Bid amount is to be stated in figures only and is the total amount bid for the entire contract work including all applicable taxes.  Any alteration, erasure, or change must be clearly indicated and initialed by the bidder.  The bidder agrees that if there are any discrepancies or questions in the figures, the Trustees will use the lower figure despite the bidder’s intent.  The Trustees’ Construction Budget is \u000b$\t(based on CPDC 2-7   .\nACKNOWLEDGE EACH ADDENDUM RECEIVED\nALLOWANCES:\n1.\tDescribe \t$XX,XXX\t Lump Sum\n2.\tDescribe\t\t$XX,XXX \t Lump Sum\nBidder has included all of the above allowances in the above Base Bid Lump Sum Price.\nALTERNATIVES – BASIS OF AWARD\nThe lowest bid shall be the lowest total of the bid prices on the base contract (Base Bid) and those additive or deductive alternatives that, when taken in order and added to, or subtracted from the Base Bid, are less than or equal to the Trustees’ Construction Budget stated above. If Trustees award a contract, it will go to the responsible bidder who submitted the lowest bid as determined by this basis of award. The Trustees are not precluded from adding to or deducting from the contract any of the additive or deductive alternatives after they have determined the lowest responsible bidder.\nADDITIVE ALTERNATIVES\nThe following additive alternatives are an integral part of this proposal, and to be responsive, the bidder shall quote for the Base Bid, and also for the following listed additive alternatives.\nAdditive Alternative No. 1:\nDescribe:\t$\tLump Sum\n(use figures only)\nAdditive Alternative No. 2:\nDescribe \t$\tLump Sum\n(use figures only)\nDEDUCTIVE ALTERNATIVES\nThe following deductive alternatives are an integral part of this proposal, and to be responsive, the bidder shall quote for the Base Bid, and also for the following listed deductive alternatives.\nDeductive Alternative No. 1:\nDescribe\t$\tLump Sum\n(use figures only)\nDeductive Alternate No. 2\nDescribe\t$\tLump Sum\n(use figures only)\nBidder shall state the above amounts in figures only, and these are the total amounts bid for all of the alternatives including all applicable taxes.  Any alterations, erasures, or changes must be clearly indicated and initialed by the bidder.  The bidder agrees that if there are any discrepancies or questions in the figures, the Trustees will use the lower figure despite the bidder’s intent.\nThe Bidder shall hold the lump sum prices for all alternatives for 60 calendar days after the start date of the Notice to Proceed. The Trustees reserve their right, within 60 calendar days after the start date of the Notice to Proceed, to add into or deduct from the awarded contract amount by change order, any or all alternatives that were not previously awarded at the listed lump sum amounts, without any delay or impact to the project and with no mark-up or mark-down.\n(Note: The following is an example of work to be separately priced, and included in the Base Bid. Then unit prices for the work are requested in case the quantities are changed during construction.)\nDrilled Caisson Foundation\nThis lump sum amount is subject to revision by the unit price values submitted below if the required depths of the caissons are more or less than the depths indicated in the plans and specifications.\nTotal value of completed drilled caisson foundations \u000bsyste","cbCaimMmxm0OjdHq","https://ap.wps.com/l/cbCaimMmxm0OjdHq","docx",23506,"English","# Base Bid Total Amount\n## Allowances\n# Alternatives and Award Basis\n## Additive Alternatives\n## Deductive Alternatives\n# Drilled Caisson Foundation Pricing\n## Unit Prices of Drilled Caissons\n# Submission Requirements","[{\"question\":\"How must the base bid amount and alternative amounts be presented?\",\"answer\":\"The base bid and all alternatives must be stated in figures only. Any alterations or changes must be clearly indicated and initialed by the bidder.\"},{\"question\":\"What determines the award under the stated basis of award?\",\"answer\":\"The award goes to the responsible bidder submitting the lowest total of the base contract and the selected additive or deductive alternatives, as limited by the Trustees’ construction budget.\"},{\"question\":\"How are drilled caisson foundation prices handled if depths differ?\",\"answer\":\"The drilled caisson foundation lump sum is subject to revision based on the unit price values provided if required caisson depths differ from the depths in the plans and specifications.\"}]","PROJECT NAME, PROJECT NUMBER (#) - Bid Proposal Form | DOCX",1788308650]