[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-187365-en":3,"doc-seo-187365-105":30,"detail-sidebar-cat-1-en-105":92},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},187365,2336474466412,"\tJames","https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d",1,11,"Presentations","Project List 1","Project cost and scope listing for transportation infrastructure initiatives in Imperial County. Each entry identifies the county, system, FTIP ID, route number, and a brief description of planned improvements, including roadway widening and resurfacing, pavement and overlay projects, sidewalk and ADA access additions, signal interconnection, and bridge or interchange rehabilitation. Funding amounts are provided in thousands of dollars, alongside notes on toll-credit matching and program or planning activities, supporting route-level budgeting and tracking.","| County | System | FTIP ID | Route \\# | Description | Project Cost\u003Cbr>($1,000's) |\n| --- | --- | --- | --- | --- | --- |\n| IMPERIAL | LOCAL HIGHWAY | IMP090701 | 0 | DEVELOP BICYCLE PATHSAND PUBLIC PARK SPACE ADJACENT TO THE NEW RIVER, CALEXICO (HPP TEA-LU PROJECT \\#3092) | $4,000 |\n| IMPERIAL | LOCAL HIGHWAY | IMP091001 | 0 | WIDEN AND IMPROVE CESAR CHAVEZ BLVD. TO 5 LANES (3+2) FROM 2ND STREET TO SR 98. OTHER IMPROVEMENTS INCLUDE: SURFACE REHAB, TURN LANES, TRAFFIC SIGNAL, LIGHTING, AND SIDEWALKS | $9,896 |\n| IMPERIAL | LOCAL HIGHWAY | IMP141201 | 0 | VARIOUS UNPAVED ROADS OVERLAY PROJECT | $1,204 |\n| IMPERIAL | LOCAL HIGHWAY | IMP160401 | 0 | GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES-PAVEMENT RESURFACING AND/OR REHABILITATION | $12,900 |\n| IMPERIAL | LOCAL HIGHWAY | IMP160402 | 0 | ROADWAY AND PEDESTRIAN IMPROVEMENTS ON NORTH BROWN FROM EAST ALAMO STREET TO DELTA STREET | $1,233 |\n| IMPERIAL | LOCAL HIGHWAY | IMP160403 | 0 | THE UNDERGROUNDING OFA RAW WATER LATERAL AND THE CONSTRUCTION OF CURB, GUTTER, SIDEWALK, AND FULL WIDTH PAVEMENTS ON 9TH STREET FROM PALM AVENUE TO OLIVE AVENUE | $633 |\n| IMPERIAL | LOCAL HIGHWAY | IMP160404 | 0 | SIXTH STREET PAVEMENT IMPROVEMENTS BETWEEN HOLT AVENUE AND MELON AVENUE | $682 |\n| IMPERIAL | LOCAL HIGHWAY | IMP160405 | 0 | DOGWOOD ROAD PAVEMENT IMPROVEMENTS BETWEEN EL CENTRO CITY LIMITS TO IMPERIAL CITY LIMITS | $2,335 |\n| IMPERIAL | LOCAL HIGHWAY | IMP160407 | 0 | PAVING OF DIRT ROAD WILDCAT DRIVE FROM S. WESTERN AVENUE TO S. FIRST STREET | $1,008 |\n| IMPERIAL | LOCAL HIGHWAY | IMP160408 | 0 | PAVING OF DIRT ROAD DE LAS FLORES STREET BETWEEN EADY AVENUE AND KLOKE AVENUE TO INCLUDE THE INSTALLATION OF CURB, GUTTER AND SIDEWALKS | $466 |\n| IMPERIAL | LOCAL HIGHWAY | IMP160409 | 0 | INTERCONNECT EXISTING SIGNAL LIGHTS ALONG DOGWOOD AVENUE AND DANENBERG AVENUE TO THE EL CENTRO'S MASTER COMPUTER TO PERMIT FOR SYNCHRONIZATION | $351 |\n| IMPERIAL | LOCAL HIGHWAY | IMP160411 | 0 | PAVING OF DIRT ROADS H STREET AND 8TH STREET. STREET SEGMENTS ARE ON H STREET FROM 7TH STREET TO 8TH STREET; AND 8TH STREET FROM H STREET TO I STREET. | $429 |\n| IMPERIAL | LOCAL HIGHWAY | IMP160901 |  | IMPERIAL AVENUE EXTENSION SOUTH-NEW ROADWAY FROM I-8 TO MCCABE ROAD. PHASE 1 INCLUDES 4 NEW LANES ON IMPERIAL AVENUE FROM I-8 TO WAKE AVENUE; AND 2 NEW LANES ON WAKE AVENUE FROM IMPERIAL AVENUE TO CYPRESS DRIVE. | $6,937 |\n| IMPERIAL | LOCAL HIGHWAY | IMP161002 | 0 | HEBER AVENUE FROM HIGHWAY 86 TO CORRELL ROAD AND SOUTH OF HIGHWAY 86 TO FAWCETT ROAD, PAVING, DRAINAGE ADA. USING TOLL CREDITS AS MATCH FOR EARREPU FUNDS. | $1,017 |\n| IMPERIAL | LOCAL HIGHWAY | IMP161003 | 0 | CONSERVATION EASEMENT, ACCESS IMPROVEMENTS AND PARKING FACILITIES AT THE DESERT MUSEUM, IMPERIAL COUNTY. USING TOLL CREDITS AS MATCH FOR EARREPU FUNDS. | $720 |\n| IMPERIAL | LOCAL HIGHWAY | IMP161004 | 0 | ASPHALT REHABILITATION ALONG RIO VISTA AVENUE BETWEEN ALLEN STREET AND CATTLE CALL DRIVE, IN THE CITY OF BRAWLEY, IMPERIAL COUNTY. | $109 |\n| IMPERIAL | LOCAL HIGHWAY | IMP161005 | 0 | PARKING LOT PAVING AND ADA ACCESS IMPROVEMENTS ON CA-78 IN THE CITY OF BRAWLEY, IMPERIAL COUNTY. USING TOLL CREDITS AS MATCH FOR EARREPU FUNDS. | $720 |\n| IMPERIAL | LOCAL HIGHWAY | IMP161010 | 0 | ESTABLISHMENT OF SR2S PROGRAM AND BICYCLE ROUTE IMPROVEMENTS. | $524 |\n| IMPERIAL | LOCAL HIGHWAY | IMP161011 | 0 | PEDESTRIAN MASTER PLAN. | $100 |\n\n| County | System | FTIP ID | Route \\# | Description | Project Cost\u003Cbr>($1,000's) |\n| --- | --- | --- | --- | --- | --- |\n| IMPERIAL | LOCAL HIGHWAY | IMP170101 | 0 | THE PROJECT CONSIST IN PROVIDING IMPROVEMENTS SUCH AS SIDEWALKS, DRIVEWAYS, IN-FILL PAVING TO ACCOMMODATE A BIKE LANE ALONG RIO VISTA STREET FROM SAN DIEGO AVENUE TO HOLT AVENUE IN THE COMMUNITY OF SEELEY. | $1,119 |\n| IMPERIAL | LOCAL HIGHWAY | IMP170102 | 0 | THE PROJECT CONSIST IN PROVIDING IMPROVEMENTS SUCH AS SIDEWALKS, DRIVEWAYS, IN-FILL PAVING ","cbCaikQIQB2ghpEN","https://ap.wps.com/l/cbCaikQIQB2ghpEN","pdf",4570561,478,"English","en",105,"# Project Entries\n## County and System\n## FTIP ID, Route and Descriptions\n## Project Cost Summary","[{\"question\":\"What information is provided for each listed project entry?\",\"answer\":\"Each entry includes the county, system, FTIP ID, route number, a written description of the work, and the project cost shown in $1,000’s.\"},{\"question\":\"What types of roadway improvements appear in the list?\",\"answer\":\"The descriptions include widening and lane additions, pavement resurfacing or overlay, rehabilitation, sidewalk/driveway and ADA access improvements, and traffic signal related work.\"},{\"question\":\"Are funding amounts specified for the projects?\",\"answer\":\"Yes. Project Cost values are included for each entry and are expressed in thousands of dollars ($1,000’s).\"}]","Project List 1 | PDF",1788382610,167,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":87,"head_meta":89,"extra_data":91,"updated_unix":28},"project-list-1","",{"@graph":36,"@context":86},[37,54,69],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/template/","Template",2,{"item":49,"name":13,"@type":43,"position":50},"https://docshare.wps.com/template/presentations/",3,{"item":52,"name":14,"@type":43,"position":53},"https://docshare.wps.com/template/project-list-1/187365/",4,{"url":52,"name":14,"@type":55,"author":56,"headline":14,"publisher":58,"fileFormat":61,"inLanguage":23,"description":15,"dateModified":62,"datePublished":63,"encodingFormat":61,"isAccessibleForFree":64,"interactionStatistic":65},"DigitalDocument",{"name":9,"@type":57},"Person",{"url":41,"name":59,"@type":60},"DocShare","Organization","application/pdf","2026-09-06","2026-09-02",true,{"@type":66,"interactionType":67,"userInteractionCount":47},"InteractionCounter",{"@type":68},"ViewAction",{"@type":70,"mainEntity":71},"FAQPage",[72,78,82],{"name":73,"@type":74,"acceptedAnswer":75},"What information is provided for each listed project entry?","Question",{"text":76,"@type":77},"Each entry includes the county, system, FTIP ID, route number, a written description of the work, and the project cost shown in $1,000’s.","Answer",{"name":79,"@type":74,"acceptedAnswer":80},"What types of roadway improvements appear in the list?",{"text":81,"@type":77},"The descriptions include widening and lane additions, pavement resurfacing or overlay, rehabilitation, sidewalk/driveway and ADA access improvements, and traffic signal related work.",{"name":83,"@type":74,"acceptedAnswer":84},"Are funding amounts specified for the projects?",{"text":85,"@type":77},"Yes. Project Cost values are included for each entry and are expressed in thousands of dollars ($1,000’s).","https://schema.org",{"og:url":52,"og:type":88,"og:title":14,"og:site_name":59,"og:description":15},"article",{"robots":90,"canonical":52},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":93},[94,97,102,107,112,117,122,127,132],{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":95,"slug":96},90,"presentations",{"id":98,"doc_module":11,"doc_module_name":46,"category_name":99,"show_sort_weight":100,"slug":101},12,"Resumes",80,"resumes",{"id":103,"doc_module":11,"doc_module_name":46,"category_name":104,"show_sort_weight":105,"slug":106},14,"Invoices",70,"invoices",{"id":108,"doc_module":11,"doc_module_name":46,"category_name":109,"show_sort_weight":110,"slug":111},15,"Posters",60,"posters",{"id":113,"doc_module":11,"doc_module_name":46,"category_name":114,"show_sort_weight":115,"slug":116},16,"Social Media",50,"social-media",{"id":118,"doc_module":11,"doc_module_name":46,"category_name":119,"show_sort_weight":120,"slug":121},17,"Forms",40,"forms",{"id":123,"doc_module":11,"doc_module_name":46,"category_name":124,"show_sort_weight":125,"slug":126},18,"Letters",30,"letters",{"id":128,"doc_module":11,"doc_module_name":46,"category_name":129,"show_sort_weight":130,"slug":131},21,"Paper Templates",5,"papers-templates",{"id":133,"doc_module":11,"doc_module_name":46,"category_name":134,"show_sort_weight":4,"slug":135},158,"General","general-158"]