[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-356061-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-356061-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","project-execution-plans-guide","Project Execution Plans - Guide","","Project Execution Plans provides acceptable, non-mandatory approaches for implementing project execution plan requirements under DOE Order 413.3B. The guide is intended for all Department of Energy elements and explains how to develop plans from introduction through plan content, including tailoring, acquisition approach, and performance baseline. It further covers management structure, baseline change control, integrated management, communication, reporting, reviews, risk management, environment, health, safety, and security, and monitoring and controlling practices including configuration, records, and quality assurance.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/project-execution-plans-guide/356061/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/project-execution-plans-guide/356061.png","ImageObject",442,249,{"name":42,"@type":43},"Rizky","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-29","2026-09-23",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",11,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the purpose of the Project Execution Plans guide?","Question",{"text":63,"@type":64},"It provides acceptable, but not mandatory, approaches for complying with DOE project execution plan requirements under DOE Order 413.3B.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Who is the guide intended for?",{"text":68,"@type":64},"It is intended for all Department of Energy (DOE) elements implementing the project execution plan requirements.",{"name":70,"@type":61,"acceptedAnswer":71},"What major plan content topics are covered?",{"text":72,"@type":64},"The guide includes plan development, cover and signature pages, revisions, acronyms, project background and justification, management and staffing, standards identification and tailoring, acquisition approach, and performance baseline elements.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},356061,1791714656,{"code":4,"msg":82,"data":83},"success",[84,87,92,97,102,107,112,117,122],{"id":55,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":85,"slug":86},90,"presentations",{"id":88,"doc_module":22,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},12,"Resumes",80,"resumes",{"id":93,"doc_module":22,"doc_module_name":25,"category_name":94,"show_sort_weight":95,"slug":96},14,"Invoices",70,"invoices",{"id":98,"doc_module":22,"doc_module_name":25,"category_name":99,"show_sort_weight":100,"slug":101},15,"Posters",60,"posters",{"id":103,"doc_module":22,"doc_module_name":25,"category_name":104,"show_sort_weight":105,"slug":106},16,"Social Media",50,"social-media",{"id":108,"doc_module":22,"doc_module_name":25,"category_name":109,"show_sort_weight":110,"slug":111},17,"Forms",40,"forms",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},18,"Letters",30,"letters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},21,"Paper Templates",5,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":82,"data":127},{"doc_id":79,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":55,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":141},962085564807,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","NOT MEASUREMENT  \nSENSITIVE  \nDOE G 413.3-15A 9-14-2018  \nProject Execution Plans  \n[This Guide describes acceptable, but not mandatory means for complying with requirements. Guides are not requirements documents and are not to be construed as requirements in any audit or appraisal for compliance with associated rule or directives.]  \nU.S. Department of Energy Office of Project Management  \nAVAILABLE ONLINE AT: INITIATED BY:  \n[www.directives.doe.gov](www.directives.doe.gov) Office of Project Management  \nFOREWORD  \nThis Department of Energy guide is for use by all Department of Energy (DOE) elements and provides acceptable, but not mandatory, approaches for implementing the project execution plan requirements in DOE Order 413.3B. DOE Guides, part of the DOE Directives System, provide non-mandatory means for complying with requirements in DOE Directives or Technical Standards but do not introduce requirements. Send citations of errors, omissions, ambiguities, and contradictions [found in this guide to](found in this guide to PMpolicy@hq.doe.gov)[ ](found in this guide to PMpolicy@hq.doe.gov)[PMpolicy@hq.doe.gov](found in this guide to PMpolicy@hq.doe.gov).  \nDOE G 413.3-15A iii  \n9-14-2018  \nCONTENTS  \nFOREWORD ................................................................................................................................... i  \nCONTENTS................................................................................................................................... iii  \n1.0 INTRODUCTION ............................................................................................................... 1  \n2.0 PLAN DEVELOPMENT.....................................................................................................1  \n3.0 SUGGESTED PLAN CONTENT .......................................................................................2  \n3.1 Cover Page and Signature Page ...............................................................................2  \n3.2 Revisions Page .........................................................................................................2  \n3.3 Table of Contents .....................................................................................................2  \n3.4 Acronyms List..........................................................................................................2  \n3.5 Introduction ..............................................................................................................3  \n Project Background......................................................................................3  \n Mission Need Justification ...........................................................................3  \n Alternatives Analysis and Selection ............................................................3  \n Project Description.......................................................................................3  \n3.6 Management Structure and Integrated Project Team...............................................4  \n3.7 Funding Profile ........................................................................................................4  \n3.8 Staffing.....................................................................................................................4  \n3.9 Identification of Standards .......................................................................................4  \n3.10 Tailoring Strategy ....................................................................................................4  \n3.11 Acquisition Approach ..............................................................................................6  \n3.12 Performance Baseline ..............................................................................................6  \n Scope Baseline .............................................................................................7  \n Schedule Baseline ..........................................................","cbCaioWMqyFnkEBi","https://ap.wps.com/l/cbCaioWMqyFnkEBi","pdf",460956,29,"English","# FOREWORD\n# 1.0 INTRODUCTION\n# 2.0 PLAN DEVELOPMENT\n# 3.0 SUGGESTED PLAN CONTENT\n## 3.1 Cover Page and Signature Page\n## 3.2 Revisions Page\n## 3.3 Table of Contents\n## 3.4 Acronyms List\n## 3.5 Introduction\n## 3.6 Management Structure and Integrated Project Team\n## 3.7 Funding Profile\n## 3.8 Staffing\n## 3.9 Identification of Standards\n## 3.10 Tailoring Strategy\n## 3.11 Acquisition Approach\n## 3.12 Performance Baseline\n## 3.13 Baseline Change Control\n## 3.14 Integration Management\n## 3.15 Communication Management\n## 3.16 Project Reporting\n## 3.17 Project Reviews\n## 3.18 Risk Management\n## 3.19 Environment, Health, Safety, and Security (EHSS)\n## 3.20 Monitoring and Controlling","[{\"question\":\"What is the purpose of the Project Execution Plans guide?\",\"answer\":\"It provides acceptable, but not mandatory, approaches for complying with DOE project execution plan requirements under DOE Order 413.3B.\"},{\"question\":\"Who is the guide intended for?\",\"answer\":\"It is intended for all Department of Energy (DOE) elements implementing the project execution plan requirements.\"},{\"question\":\"What major plan content topics are covered?\",\"answer\":\"The guide includes plan development, cover and signature pages, revisions, acronyms, project background and justification, management and staffing, standards identification and tailoring, acquisition approach, and performance baseline elements.\"}]","Project Execution Plans - Guide | PDF",1790123134,10]