[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-175580-105":53,"doc-detail-175580-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","programme-proposal-4th-funding-round-2021-instructions-and-submission-requirements","Programme proposal - 4th Funding Round 2021 - Instructions and submission requirements","","Programme proposal guidance for the 4th Funding Round 2021 sets the development process from the agreed log frame through validation by the UNPRPD Technical Secretariat and detailed consultation and clearance with UNCT, government and Organisations of Persons with Disabilities. It specifies strict word limits, accessibility requirements for Word and PDF, and the Resident Coordinator’s role in oversight. The document outlines quality assurance submission timelines before Management Committee approval and fund transfer signatures, and lists mandatory annexes including budget template, workplan, cover page and acronyms.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/programme-proposal-4th-funding-round-2021-instructions-and-submission-requirements/175580/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/programme-proposal-4th-funding-round-2021-instructions-and-submission-requirements/175580.png","ImageObject",442,249,{"name":88,"@type":89},"Jake","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-20","2026-09-02",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",10,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the required starting point for developing the programme proposal?","Question",{"text":109,"@type":110},"The proposal must be developed based on the log frame developed and agreed with partners, and validated by the UNPRPD Technical Secretariat within the situational analysis process.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"Which approvals and consultations are required before final submission?",{"text":114,"@type":110},"The UN system leads the draft, and the proposal must be consulted in detail and validated with UNCT, government and OPDs. The RC provides oversight, stays involved, and gives clearance on the last version.",{"name":116,"@type":107,"acceptedAnswer":117},"When is the full-fledged proposal submitted for quality assurance, and how long can the process take?",{"text":118,"@type":110},"Before or at the end date of the inception phase, the proposal is submitted as a draft for quality assurance to the Technical Secretariat. After clearance, it goes to the Management Committee for final approval, and the process may take up to 4 weeks.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},175580,1791302117,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":142},962084928904,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","Programme proposal – 4th Funding Round 2021\nInstructions – please read carefully\nThe programme proposal will have to be developed based on the log frame developed and agreed with partners and validated by the UNPRPD Technical Secretariat within the situational analysis process (annex 2 of the situational analysis). Please do not start developing the proposal before output formulation has been cleared by the Technical Secretariat,\nThe UN system is expected to lead on the draft of the programme proposal. Please note the proposal will have to be consulted in detail and validated with UNCT, government and OPDs. Kindly ensure words limits are respected and that the documents are fully accessible. You can find more information on how you can ensure your documents are accessible in WORD \u0013 HYPERLINK \"https://support.microsoft.com/en-us/office/make-your-word-documents-accessible-to-people-with-disabilities-d9bf3683-87ac-47ea-b91a-78dcacb3c66d\" \u0014here\u0015 and in PDF \u0013 HYPERLINK \"https://www.adobe.com/accessibility/pdf/pdf-accessibility-overview.html\" \u0014here\u0015.\nPlease note the RC has the programmatic oversight of the programme, therefore the RC is expected to be involved and updated on the development of the proposal and give clearance on the last version of the proposal.\nBefore or at the end date of the inception phase the full-fledged proposal needs to be submitted as a draft for quality assurance to the Technical Secretariat to \u0013 HYPERLINK \"mailto:natalia.mattioli@undp.org\" \\h \u0014natalia.mattioli@undp.org\u0015 and unprpd.fund.calls@undp.org, once the Technical Secretariat clears the proposal it will be submitted to the Management Committee of the UNPRPD MPTF for final approval. Please note this process may take up to 4 weeks.\nKindly follow attentively word limit and instructions in every section.\nOnce the UNPRPD Management Committee approves the proposal we will proceed with the transfer of funds. Please note the RC and the Implementing Agencies will need to sign the documents related to the transfer request.\nFor support, please reach out to \u0013 HYPERLINK \"mailto:natalia.mattioli@undp.org\" \u0014natalia.mattioli@undp.org\u0015 cc unprpd.fund.calls@undp.org.\nDocuments to be submitted\nProgramme proposal (please make sure you include the country name in the name of the document for Instance UNPRPD R4 programme Proposal Zimbabwe.doc)\nBudget template\nWorkplan\nCover page\nAcronyms and Abbreviations\nAGLA \tOffice of the Attorney General and Ministry of Legal Affairs\nCDTT\tCombined Disability of Trinidad and Tobago\nCODO\tConsortium of Disability Organisations\nCRPD\tConvention of the Rights of Persons with Disabilities\nCSO\tCentral Statistical Office\nDAU\tDisability Affairs Unit\nDEAF\tDeaf Empowerment and Advancement Foundation\nDPI \tTrinidad and Tobago Chapter for Disabled Peoples International\nEOA\tEqual Opportunity Act\nEOC\tEqual Opportunity Commission\nNGO\tNon-Governmental Organization\nOPDs\tOrganisations of Persons with Disabilities\nPAHO\tPan American Health Organisation\nPWDs\tPersons/People with Disabilities\nRCO\tResident Coordinator Office\nSPO\tService Providing Organisation\nT&T\tTrinidad and Tobago\nTTBWA\tTrinidad and Tobago Blind Welfare Association\nUN\tUnited Nations\nUNFPA\tUnited Nations Population Fund\nBackground and rationale\nPWDs in Trinidad and Tobago continue to face issues of inequality, a general lack of access to services and poor socio-economic outcomes. This is largely due to weak legislations and enforcement, lack of public awareness of the capabilities of PWDs, limited sensitization of PWDs on their rights as citizens, limited knowledge and competencies among key service providing organisations, and limited access to rehabilitation services at the community level.  The presence of an umbrella organisation not fully endorsed by OPDs also lends to an un-coordinated and fragmented disability sector. Additionally, the methodology used for national surveys limits availability of accurate disaggregated disability data.\nThe 2011 T&T Population and Housing Census revealed ","cbCaiskw9CSWjfHx","https://ap.wps.com/l/cbCaiskw9CSWjfHx","docx",255097,67,"English","# Programme proposal - process and approvals\n## Scope, log frame, and validation steps\n## Consultation, oversight, and word limit/accessibility requirements\n## Quality assurance submission and funding transfer workflow\n# Documents to be submitted","[{\"question\":\"What is the required starting point for developing the programme proposal?\",\"answer\":\"The proposal must be developed based on the log frame developed and agreed with partners, and validated by the UNPRPD Technical Secretariat within the situational analysis process.\"},{\"question\":\"Which approvals and consultations are required before final submission?\",\"answer\":\"The UN system leads the draft, and the proposal must be consulted in detail and validated with UNCT, government and OPDs. The RC provides oversight, stays involved, and gives clearance on the last version.\"},{\"question\":\"When is the full-fledged proposal submitted for quality assurance, and how long can the process take?\",\"answer\":\"Before or at the end date of the inception phase, the proposal is submitted as a draft for quality assurance to the Technical Secretariat. After clearance, it goes to the Management Committee for final approval, and the process may take up to 4 weeks.\"}]","Programme proposal - 4th Funding Round 2021 - Instructions and submission requirements | DOCX",1788320940,23]