[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-244416-105":53,"doc-detail-244416-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","production-calendar-guidelines-appendix-c","Production Calendar Guidelines - Appendix C","","Production Calendar Guidelines outlines semester-based production deadlines and responsibilities, including producer-specific tasks and cross-team coordination. It specifies key submission points for CPA applications, weapons/combat request forms, rehearsal and design deliverables, as well as weekly production meetings and contact sheet sharing. The schedule covers pre-residency production work, a three-week residency with load-in, LX focus, rehearsal blocks, tech, dress rehearsals, invited dress, performances, and strike, followed by post-residency steps like returning rentals, issuing reimbursements, and reconciling accounts.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/production-calendar-guidelines-appendix-c/244416/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/production-calendar-guidelines-appendix-c/244416.png","ImageObject",442,249,{"name":88,"@type":89},"\tWilliam","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-19","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",13,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What actions are required at the beginning of the semester?","Question",{"text":109,"@type":110},"The calendar calls for a meeting with Rose and Nathan to discuss the CPA Application, completion of a Weapons/Combat Request form if needed, obtaining a contact sheet, sending a rehearsal report template to SM, and setting time for weekly production meetings. It also includes sharing the contact sheet and calendar.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What are the key production meeting and design due dates?",{"text":114,"@type":110},"It lists a first production meeting for a practice design presentation, then milestones for final set design, preliminary LX plot submission, preliminary Snd/Proj design deadline, and final LX plot due dates. It also includes sending cast/crew ID information and tagging all warehouse props.",{"name":116,"@type":107,"acceptedAnswer":117},"How does the residency schedule progress and what happens afterward?",{"text":118,"@type":110},"Week 1 focuses on LX load-in and early load-in blocks, Week 2 adds LX focus, spacing rehearsal, Q2Q, and tech. Week 3 emphasizes dress rehearsals and invited dress, followed by performances and a Saturday strike. After residency, rentals are returned, reimbursements are issued, and accounts are reconciled.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},244416,1791720636,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":4},5909887254083,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Production Calendar Deadlines  \n(Producer-specific duties in italics)  \nBeginning of semester:  \nMeet with Rose & Nathan to discuss CPA Application  \nFill out Weapons/Combat Request form if needed 6w Get contact sheet from SM  \nSend rehearsal report template to SM  \nSet time for weekly production meetings 5w Prelim set/costume design due  \nShare contact sheet and calendar  \nFirst PROD MTG: practice design presentation 4w 491 design presentation  \nPROD MTG  \n3w Final set design due to Rose  \nPROD MTG  \n2w Prelim LX plot due to Rose  \nSchedule load-in meeting with Rose & designers Designer run-through  \nPROD MTG  \n1w Final LX plot due to Rose  \nPrelim Snd/Proj design deadline  \nSend Cast/crew ID info to May  \nAll warehouse props tagged  \nPROD MTG Residency:  \nWeek 1  \nSunday: LX load-in (10am-6pm)  \nMon-Fri: Load-in (afternoons)  \nSaturday: Set load-in (10am-6pm) SND/PROJ deadline  \nPROD MTG Week 2  \nSunday:LX focus (10am-6pm)  \nSpacing rehearsal (6-10pm)  \nMon-Wed: Q2Q (6-11:30pm)  \nThurs-Sat: Tech (6-10pm) Week 3  \nSun-Tues: Dress rehearsals(6-10pm)  \nWed: Invited Dress 8pm  \nThurs-Sat: Performances  \nSaturday: Strike (10pm-1am)  \nPost-Residency:  \nReturn all rentals  \nIssue reimbursements  \nReconcile all accounts","cbCairSjeI8By19Y","https://ap.wps.com/l/cbCairSjeI8By19Y","pdf",107636,"English","# Production Calendar Deadlines\n## Beginning of semester\n## Production meetings and design deliverables\n## Residency schedule (Week 1-3)\n## Post-residency tasks","[{\"question\":\"What actions are required at the beginning of the semester?\",\"answer\":\"The calendar calls for a meeting with Rose and Nathan to discuss the CPA Application, completion of a Weapons/Combat Request form if needed, obtaining a contact sheet, sending a rehearsal report template to SM, and setting time for weekly production meetings. It also includes sharing the contact sheet and calendar.\"},{\"question\":\"What are the key production meeting and design due dates?\",\"answer\":\"It lists a first production meeting for a practice design presentation, then milestones for final set design, preliminary LX plot submission, preliminary Snd/Proj design deadline, and final LX plot due dates. It also includes sending cast/crew ID information and tagging all warehouse props.\"},{\"question\":\"How does the residency schedule progress and what happens afterward?\",\"answer\":\"Week 1 focuses on LX load-in and early load-in blocks, Week 2 adds LX focus, spacing rehearsal, Q2Q, and tech. Week 3 emphasizes dress rehearsals and invited dress, followed by performances and a Saturday strike. After residency, rentals are returned, reimbursements are issued, and accounts are reconciled.\"}]","Production Calendar Guidelines - Appendix C | PDF",1789217134]