[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-302768-105":53,"doc-detail-302768-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","procurement-and-contracting-requirements-section-index-contract-forms-and-technical-specifications","PROCUREMENT AND CONTRACTING REQUIREMENTS - SECTION INDEX - Contract Forms and Technical Specifications","","DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS provides bid and contracting documentation structure, including certification, project team listings, table of contents, technical specifications and drawings lists, notice to bidders, substitution and non-collusion affidavits, and a complete set of contract forms and exhibits. The document further organizes general requirements, construction schedules, coordination, submittals, quality control, and closeout procedures. It continues with a detailed project scope outline for multiple building divisions and systems (existing conditions, concrete, metals, wood/plastics, thermal protection, openings, finishes, specialties, furnishings, fire suppression, and plumbing).",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/procurement-and-contracting-requirements-section-index-contract-forms-and-technical-specifications/302768/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/procurement-and-contracting-requirements-section-index-contract-forms-and-technical-specifications/302768.png","ImageObject",442,249,{"name":88,"@type":89},"Guten tag","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-09-27","2026-09-19",true,{"@type":98,"interactionType":99,"userInteractionCount":79},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What materials are included in the contract forms and exhibits section?","Question",{"text":108,"@type":109},"The contract forms include an agreement, standard form between contractor and subcontractor, and multiple exhibits such as ST-105, MSDS cover sheet, insurance certificate forms, payment and waiver checklists, and contractor affidavits.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"Which areas are covered under general requirements in Division 01?",{"text":113,"@type":109},"Division 01 organizes work summaries, construction schedule, allowances and unit prices, alternates and modification procedures, coordination and project work rules, cutting and patching, references, project meetings, submittals, diversity utilization, quality control, facilities and controls, and construction closeout.",{"name":115,"@type":106,"acceptedAnswer":116},"How are fire suppression and plumbing requirements organized?",{"text":117,"@type":109},"The document lists dedicated sections under Division 21 for basic fire suppression, pipe sleeves and seals, identification escutcheons, and wet-pipe sprinkler systems. Division 22 provides an indexed set of plumbing sections covering multiple installation and system components.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},302768,1789796738,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":79,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":125,"read_time":76},687212321768,"https://ap-avatar.wpscdn.com/avatar/a0010bdbe886d2fe77?x-image-process=image/resize,m_fixed,w_180,h_180&k=1789897067658708522","DIVISION 00—PROCUREMENT AND CONTRACTING REQUIREMENTS  \nINTRODUCTORY INFORMATION  \n00001 CERTIFICATION PAGE  \n00002 PROJECT TEAM MEMBERS  \n00003 TABLE OF CONTENTS  \n00004 LIST OF TECHNICAL SPECIFICATIONS  \n00005 LIST OF DRAWINGS  \nBIDDING REQUIREMENTS  \n00020 NOTICE TO BIDDERS  \nSUBCONTRACTOR / MATERIAL SUPPLIER / MANUFACTURER LIST (SAMPLE INCLUDED)  \nINDIANA SALES TAX EXEMPTION FORM  \n00121 SUBSTITUTION REQUEST FORM  \n00300 BIDDERS REMINDER LIST  \nBID FORM  \n00400 SUPPLEMENTS TO BID FORM  \nAFFIDAVIT OF BUSINESS DIVERSITY UTILIZATION PLAN  \nNON-COLLUSION AFFIDAVIT  \nCONTRACT FORMS  \n00501 AGREEMENT  \nSTANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND  \nSUBCONTRACTOR (AIA DOCUMENT A401–2007)  \nEXHIBIT A: FORM ST-105  \nEXHIBIT B: MSDS COVER SHEET  \nEXHIBIT C: ACORD 25 (2009/09) CERTIFICATE OF LIABILITY INSURANCE FORM  \nCONTRACT FORMS (Continued)  \nEXHIBIT D: HAGERMAN, INC. ARTICLES XA, XB, XC, XD  \n(SUPPLEMENTS TO AIA DOCUMENT A401–2007)  \nEXHIBIT E: PAY APPLICATION CHECK LIST  \nEXHIBIT E. 1: APPLICATION AND CERTIFICATE OF PAYMENT  \n(AIA G702 AND G703)  \nEXHIBIT E.2: PARTIAL WAIVER SUBCONTRACTOR  \nEXHIBIT E.3: PARTIAL WAIVER SUB-SUBCONTRACTOR  \nEXHIBIT E.4: CONSENT OF SURETY TO REDUCTION IN OR PARTIAL RELEASE OF RETAINAGE (AIA G707A)  \nEXHIBIT E.5: CONSENT OF SURETY TO FINAL PAYMENT (AIAG707)  \nEXHIBIT E.6: CONTRACTOR’S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS (AIA G706)  \nEXHIBIT E.7: CONTRACTOR’S AFFIDAVIT OF RELEASE OF LIENS (AIA G706A)  \nEXHIBIT E. 8: FINAL WAIVER SUBCONTRACTOR  \nEXHIBIT E.9: FINAL WAIVER SUB-SUBCONTRACTOR  \nEXHIBIT F: THG SUBCONTRACTOR SAFETY ORIENTATION  \nCHECKLIST  \nEXHIBIT G: THG SUBCONTRACTOR SAFETY MANUAL  \nCONDITIONS OF THE CONTRACT  \n00700 GENERAL CONDITIONS  \nGENERAL CONDITIONS (AIA DOCUMENT A201–2007)  \nIU HEALTH MANDATORY CONTRACTOR ORIENTATION REQUIREMENTS FOR HEALTH CARE PROJECTS, DATED FEBRUARY 14, 2012  \nDIVISION 01 – GENERAL REQUIREMENTS  \n01010 SUMMARY OF WORK  \nRENOVATION AREA DETAILS (WORK HOURS/ACCESS/RESPONSIBILITIES) AIR HANDLER AHU-04N-01 SUBMITTAL DATA  \n01015 SCHEDULE  \nPRELIMINARY CONSTRUCTION SCHEDULE  \n01020 ALLOWANCES  \nDIVISION 01 – GENERAL REQUIREMENTS (CONTINUED)  \n01025 PAYMENT  \n01028 UNIT PRICES  \n01030 ALTERNATES  \n01035 MODIFICATION PROCEDURES  \n01040 COORDINATION  \n01041 PROJECT WORK RULES  \n01045 CUTTING AND PATCHING  \n01090 REFERENCES  \n01200 PROJECT MEETINGS  \n01300 SUBMITTALS  \n01350 DIVERSITY UTILIZATION  \n01400 QUALITY CONTROL  \n01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS  \n01560 CONSTRUCTION CLEANING  \n01610 MATERIAL AND EQUIPMENT DELIVERY, STORAGE, AND HANDLING 01630 PRODUCT OPTIONS AND SUBSTITUTIONS  \n01650 STARTING OF SYSTEMS  \n01700 CONTRACT CLOSEOUT  \nEND OF SECTION  \nIU HEALTH  \nBall Memorial Hospital  \nMuncie, Indiana  \nEndoscopy/Histology/MEP Infrastructure BSA LifeStructures \\#02790049  \nDIVISION 02-EXISTING CONDITIONS  \n02 01 00 MAINTENANCE OF EXISTING CONDITIONS  \n02 41 19 SELECTIVE STRUCTURE DEMOLITION  \nDIVISION 03-CONCRETE  \n03 10 0 CONCRETE FORMWORK  \n03 20 0 CONCRETE REINFORCEMENT  \n03 30 0 CAST-IN-PLACE CONCRETE  \n03 54 16 CEMENTITIOUS UNDERLAYMENT  \nDIVISION 5-METALS  \n05 10 0 STRUCTURAL STEEL  \n05 31 0 STEEL ROOF DECK  \n05 50 00 METAL FABRICATIONS  \nDIVISION 06-WOOD, PLASTICS, AND COMPOSITES  \n06 05 73 WOOD TREATMENT  \n06 10 00 ROUGH CARPENTRY  \n06 40 00 ARCHITECTURAL WOODWORK  \n06 61 16 SOLID SURFACING FABRICATIONS  \nDIVISION 07-THERMAL AND MOISTURE PROTECTION  \n07  \n07  \n07  \n07  \n07  \n07  \n07  \n07  \n07  \n07  \n07  \n07  \n01  \n21  \n22  \n26  \n42  \n53  \n62  \n72  \n81  \n84  \n92  \n95  \n50.1900000063  \n23.120000  \n16  \n00  \n00  \n13  \nPREPARATION FOR RE-ROOFING THERMAL INSULATION  \nROOF AND DECK INSULATION  \nVAPOR BARRIER/RETARDER FABRICATED WALL PANEL ASSEMBLIES EPDM ROOFING – FULLY-ADHERED SHEET METAL FLASHING AND TRIM ROOF ACCESSORIES  \nCEMENTITIOUS FIREPROOFING FIRESTOPPING  \nJOINT SEALANTS  \nEXPANSION JOINT COVER ASSEMBLIES  \nDIVISION 08-OPENINGS  \n08 12 13 HOLLOW METAL FRAMES  \n08 13 13 HOLLOW METAL DOORS  \n08 14 23.16 PLASTIC-LAMINATE-FAC","cbCaieIIN35Sp5B4","https://ap.wps.com/l/cbCaieIIN35Sp5B4","pdf",29555,8,"English","# DIVISION 00—PROCUREMENT AND CONTRACTING REQUIREMENTS\n## Introductory information\n## Bidding requirements\n## Contract forms\n# DIVISION 01 – GENERAL REQUIREMENTS\n## Summary of work\n## Schedule\n## Allowances and payment\n## Coordination, submittals, and quality control\n# DIVISIONS 02–10, 12\n## Existing conditions\n## Concrete, metals, wood/plastics/composites\n## Thermal and moisture protection\n## Openings, finishes, specialties, furnishings\n# DIVISIONS 21–22\n## Fire suppression\n## Plumbing","[{\"question\":\"What materials are included in the contract forms and exhibits section?\",\"answer\":\"The contract forms include an agreement, standard form between contractor and subcontractor, and multiple exhibits such as ST-105, MSDS cover sheet, insurance certificate forms, payment and waiver checklists, and contractor affidavits.\"},{\"question\":\"Which areas are covered under general requirements in Division 01?\",\"answer\":\"Division 01 organizes work summaries, construction schedule, allowances and unit prices, alternates and modification procedures, coordination and project work rules, cutting and patching, references, project meetings, submittals, diversity utilization, quality control, facilities and controls, and construction closeout.\"},{\"question\":\"How are fire suppression and plumbing requirements organized?\",\"answer\":\"The document lists dedicated sections under Division 21 for basic fire suppression, pipe sleeves and seals, identification escutcheons, and wet-pipe sprinkler systems. Division 22 provides an indexed set of plumbing sections covering multiple installation and system components.\"}]","PROCUREMENT AND CONTRACTING REQUIREMENTS - SECTION INDEX - Contract Forms and Technical Specifications | PDF"]