[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-353986-105":53,"doc-detail-353986-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","pro-mit-bim-execution-plan-bim-execution-plan","PRO-MIT-Bim-Execution-Plan - BIM Execution Plan","","Detailed MIT BIM Project Execution Plan describing how Building Information Modeling is implemented across the project lifecycle. Defines BIM uses such as design authoring, cost estimating, and design coordination, including a pilot use at MIT with client participation. Specifies six interlinked BIM files, software environments (Revit Architecture 2010 and Navisworks), project information, schedules, key contacts, BIM goals, collaboration procedures, information exchange worksheets, quality control, required data, and technological and model structure requirements.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/pro-mit-bim-execution-plan-bim-execution-plan/353986/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/pro-mit-bim-execution-plan-bim-execution-plan/353986.png","ImageObject",442,249,{"name":88,"@type":89},"วิน","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-29","2026-09-22",true,{"@type":98,"interactionType":99,"userInteractionCount":8},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of this BIM Project Execution Plan for the MIT project?","Question",{"text":108,"@type":109},"The plan defines BIM uses on the project and provides a detailed process design for executing BIM throughout the project lifecycle, including client participation as a pilot use at MIT.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"Which BIM files and software tools are planned for the project?",{"text":113,"@type":109},"The design team will create six interlinked BIM files: an existing conditions/architectural model by ARCH, M/E/P-related models by ENG, and a coordination model by CONS. Revit Architecture 2010 is used for design models and Navisworks for the coordination model.",{"name":115,"@type":106,"acceptedAnswer":116},"What are the key BIM goals and how are they prioritized?",{"text":117,"@type":109},"Goals are organized by priority, including a high-priority objective to streamline MEP/FP coordination for clash-free BIM, with medium goals focused on enriching model spaces and objects with data suitable for CAFM and COBie-compliant conversion.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},353986,1791736717,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":8,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":8},2336475104736,"https://ap-avatar.wpscdn.com/avatar/22000c4c5e0e5b17e70?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786591360781797222","OPTIONAL IMAGE OR RENDERING OF BUILDING OR SITE  \nMIT Project Name  \nMIT Project Number  \nDEVELOPED IN COLLABORATION WITH  \nConstruction Company Architect  \nAND  \nEngineer  \nTABLE OF CONTENTS  \n1.  BIM EXECUTION PLAN OVERVIEW 6  \n2.  PROJECT INFORMATION 7  \n3.  KEY PROJECT CONTACTS 8  \n4.  PROJECT GOALS/BIM USES 9  \n4.1 MAJOR BIM GOALS/OBJECTIVES 9  \n4.2 BIM USES 9  \n4.3 BIM USES ANALYSIS WORKSHEET 9  \n5.  ORGANIZATIONAL ROLES/STAFFING 10  \n6.  MODEL TRANSITION PROCESS DIAGRAM 12  \n6.1 OVERVIEW DIAGRAM 12  \n7.  BIM INFORMATION EXCHANGES 13  \n7.1 LIST OF INFORMATION EXCHANGE WORKSHEETS 13  \n7.2 MODEL DEFINITION WORKSHEET 13  \n8.  BIM AND FACILITY DATA REQUIREMENTS 14  \n9.  COLLABORATION PROCEDURES 15  \n9.1 COLLABORATION STRATEGY 15  \n9.2 MEETING PROCEDURES 15  \n9.3 MODEL DELIVERY SCHEDULE OF INFORMATION EXCHANGE FOR SUBMISSION AND APPROVAL 15  \n9.4 INTERACTIVE WORKSPACE 16  \n9.5 ELECTRONIC COMMUNICATION PROCEDURES 16  \n10.  QUALITY CONTROL 17  \n10.1 OVERALL STRATEGY FOR QUALITY CONTROL / QUALITY CONTROL CHECKS 17  \n10.2 MODEL ACCURACY AND TOLERANCES 188  \n11. TECHNOLOGICAL INFRASTRUCTURE NEEDS 19  \n11.1 SOFTWARE 19  \n11.2 COMPUTERS / HARDWARE 19  \n11.3 MODELING CONTENT AND REFERENCE INFORMATION 19  \n12.  MODEL STRUCTURE 20  \n12.1 FILE NAMING STRUCTURE 20  \n12.2 MODEL STRUCTURE 20  \n12.3 EXCLUSIONS 21  \n12.4 REVIT OBJECT CATEGORIES 24  \n12.5 MEASUREMENT AND COORDINATE SYSTEMS 25  \n12.6 BIM AND CAD STANDARDS 25  \n13.  PROJECT DELIVERABLES 26  \n14.  DELIVERY STRATEGY/CONTRACT 27  \n14.1 DELIVERY AND CONTRACTING STRATEGY FOR THE PROJECT 27  \n14.2 TEAM SELECTION PROCEDURE 27  \n14.3 BIM CONTRACTING PROCEDURE 27  \nA.  BIM GOAL AND USE WORKSHEET A-1  \nB.  MODEL TRANSITION PROCESS DIAGRAM B-1  \nC.  INFORMATION EXCHANGE WORKSHEET C-1  \nE.  MODEL DEFINITION WORKSHEET D-1  \n1. BIM EXECUTION PLAN OVERVIEW  \nTo successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle.  \nThis is also a pilot use of BIM at MIT where the client is engaged in the BIM process alongside the design and construction teams.  \nThere will be six interlinked BIM files by the design team: an Existing Conditions/Architectural Design Model by ARCH; Mechanical, Plumbing, Electrical, Communications, and Access Control models by ENG.; and then a Coordination Model by CONS. The design models will be in Revit Architecture 2010. The Coordination Model will be in Navisworks.  \n2. PROJECT INFORMATION  \n1. Project Owner: MIT  \n2. Project Name: MIT W1 Renovation Project  \n3. Project Location and Address: 305 Memorial Drive, Cambridge, MA 02138, USA  \n4. Contract Type/Delivery Method:  \n5. Project Description: Massachusetts Institute of Technology Building W-1 construction services for $00 million, 185,000 sf design/build renovation and restoration of seven-story, historic (1900s) residence hall, including common areas, dining room, kitchen, and lobby; scope of work will include reconfiguration of dormitory rooms, ADA compliance upgrades, and all new life-safety and M/E/P systems; site is in a high-profile location on Massachusetts Avenue, requiring extensive logistical coordination; project is targeting LEED® Silver Certification  \n6. Project Numbers  \n\n| PROJECT INFORMATION | NUMBER |\n| --- | --- |\n| MIT Project Number | 07063 |\n| CONSTRUCTION Project Number | 090193 |\n| ARCHITECTURAL Project Number |  |\n| ENGINEERING Project Number | 2958.04 |\n|  |  |\n\n7. Project Schedule/Phase/Milestones  \n\n| PROJECT PHASE / MILESTONE | ESTIMATED START DATE | ESTIMATED\u003Cbr>COMPLETION DATE | PROJECT STAKEHOLDERS INVOLVED |\n| --- | --- | --- | --- |\n| Existing conditions documentation | 2/10/2008 | 12/1/2010 | Owner, A/E, sub-consultants, CM |\n| CD level model with major A/MEP coordinatio","cbCaioYcNwJmKzCD","https://ap.wps.com/l/cbCaioYcNwJmKzCD","pdf",563225,32,"English","# BIM EXECUTION PLAN OVERVIEW\n# PROJECT INFORMATION\n# KEY PROJECT CONTACTS\n# PROJECT GOALS/BIM USES\n## MAJOR BIM GOALS/OBJECTIVES\n## BIM USES\n# ORGANIZATIONAL ROLES/STAFFING\n# MODEL TRANSITION PROCESS DIAGRAM\n## OVERVIEW DIAGRAM\n# BIM INFORMATION EXCHANGES\n## LIST OF INFORMATION EXCHANGE WORKSHEETS\n## MODEL DEFINITION WORKSHEET\n# BIM AND FACILITY DATA REQUIREMENTS\n# COLLABORATION PROCEDURES\n## COLLABORATION STRATEGY\n## MEETING PROCEDURES\n## MODEL DELIVERY SCHEDULE OF INFORMATION EXCHANGE FOR SUBMISSION AND APPROVAL\n## INTERACTIVE WORKSPACE\n## ELECTRONIC COMMUNICATION PROCEDURES\n# QUALITY CONTROL\n## OVERALL STRATEGY FOR QUALITY CONTROL / QUALITY CONTROL CHECKS\n## MODEL ACCURACY AND TOLERANCES\n# TECHNOLOGICAL INFRASTRUCTURE NEEDS\n## SOFTWARE\n## COMPUTERS / HARDWARE\n## MODELING CONTENT AND REFERENCE INFORMATION\n# MODEL STRUCTURE\n## FILE NAMING STRUCTURE\n## MODEL STRUCTURE\n## EXCLUSIONS\n## REVIT OBJECT CATEGORIES\n## MEASUREMENT AND COORDINATE SYSTEMS\n## BIM AND CAD STANDARDS\n# PROJECT DELIVERABLES\n# DELIVERY STRATEGY/CONTRACT","[{\"question\":\"What is the purpose of this BIM Project Execution Plan for the MIT project?\",\"answer\":\"The plan defines BIM uses on the project and provides a detailed process design for executing BIM throughout the project lifecycle, including client participation as a pilot use at MIT.\"},{\"question\":\"Which BIM files and software tools are planned for the project?\",\"answer\":\"The design team will create six interlinked BIM files: an existing conditions/architectural model by ARCH, M/E/P-related models by ENG, and a coordination model by CONS. Revit Architecture 2010 is used for design models and Navisworks for the coordination model.\"},{\"question\":\"What are the key BIM goals and how are they prioritized?\",\"answer\":\"Goals are organized by priority, including a high-priority objective to streamline MEP/FP coordination for clash-free BIM, with medium goals focused on enriching model spaces and objects with data suitable for CAFM and COBie-compliant conversion.\"}]","PRO-MIT-Bim-Execution-Plan - BIM Execution Plan | PDF",1790108355]