[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-165252-en":3,"doc-seo-165252-105":30,"detail-sidebar-cat-1-en-105":90},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},165252,137451211410,"\tCallum ","https://ap-avatar.wpscdn.com/avatar/2000bb0a9246f588df?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786362646172706240",1,17,"Forms","Price Proposal Forms & Instructions - attachment 1","Price Proposal Forms & Instructions for a Design-Build Entity firm explains how to complete and submit a Price Proposal package in response to an RFP for design-build services. The Price Proposal consists of five required forms submitted separately from the Technical Proposal: Proposer Information, Addenda Acknowledgement, Fee Proposal Form, Professional Billing Rate Sheet, and Certification. Instructions define pricing for Design Work and Construction Work, including design development, working drawings, construction administration, and general conditions mark-ups, with fully loaded fees including overhead and profit.","ATTACHMENT 1\nTO RFP FOR DESIGN BUILD ENTITY FIRM\n\u000f\nPRICE PROPOSAL\nFORMS & INSTRUCTIONS\nGENERAL INSTRUCTIONS FOR PRICE PROPOSAL\nThese instructions explain how to complete each component of the Price Proposal. The Price Proposal is composed of five (5) forms that must be submitted together: (i) Proposer Information; (ii) Addenda Acknowledgement; (iii) Fee Proposal Form; (iv) Professional Billing Rate Sheet; and (v) Certification. This completed Price Proposal shall be submitted separately and not with the Technical Proposal. All Work referenced herein shall be priced to fulfill all obligations for Design Work and Construction Work as set forth in the Contract Documents. Design Build Entity shall read these instructions and review all Contract Documents, including, without limitation, the General Conditions (Exhibit A to the Agreement), Stipulated Sum Preparation Form (Attachment 2), Design Deliverable Requirements (Exhibit D to the Agreement), Design Build General Conditions Matrix (Exhibit E to the Agreement), and the Criteria Documents (RFP, Attachment 9) prior to preparing its Price Proposal.\nINSTRUCTIONS FOR PROPOSER INFORMATION FORM\nComplete Proposer Information Form (Exhibit A).\nINSTRUCTIONS FOR ADDENDA ACKNOWLEDGEMENT FORM\nComplete Addenda Acknowledgement Form (Exhibit B).\nINSTRUCTIONS FOR FEE PROPOSAL FORM\nComplete Fee Proposal Form (Exhibit C) as indicated below.\nDesign Work.\nThe fee for Design Work shall be based on the aggregate of the costs for: (i) Design Development Work and (ii) Working Drawings Work. These items shall be priced as a lump sum that shall be fixed as of the Effective Date of the Agreement. The Design Work shall include the following items:\nDesign Development Work Costs. The fee for Design Development Work shall include:\nDesign Development - Design Fees. Line A1 in the Fee Proposal Form shall include all fees for Design Development professional services, including designers, engineers, consultants, design build and/or design assist subcontractors, and any other consultants needed to perform or support Design Work. The fees shall include all costs for development of the design for all elements required for a complete and functional project, except those items specifically identified as being designed by others in the Contract Documents, to a design development level. Completion of the Design Development Drawings includes applicable review and approval by all Authorities Having Jurisdiction, the Judicial Council, and Peer Reviewers (if applicable). The minimum requirements for Design Development Documents are outlined in Design Deliverable Requirements (Exhibit D to the Agreement). The design fees must be fully loaded and include mark-up for overhead and profit.\nDesign Development - Management Fees. Line A2 in the Fee Proposal Form shall include all Design Build Entity fees for design management during Design Development; Design Build Entity (and consultant) fees for Preconstruction Services, including estimating, scheduling, constructability, life cycle cost analysis, and other services necessary to manage the Design Development Work. The fees must be fully loaded and include mark-up for overhead and profit.\nWorking Drawings Work Costs. The fee for Working Drawings Work shall include:\nDesign Fees. Line A3 of the Fee Proposal Form shall include all fees for Working Drawings Work professional services, including designers, engineers, consultants, design build and/or design assist subcontractors, and any other consultants needed to perform or support Design Work. The fees shall include all costs for completion of the Working Drawings for all elements required for a complete and functional project, except those items specifically identified as being designed by others in the Contract Documents. Completion of the Working Drawings includes review and approval by all Authorities Having Jurisdiction, the Judicial Council, and Peer Reviewers (if applicable). The minimum requirements for Working Drawings Docume","cbCaidFfD48Y4oD8","https://ap.wps.com/l/cbCaidFfD48Y4oD8","docx",242431,11,"English","en",105,"# General Instructions for Price Proposal\n## Proposer Information Form\n## Addenda Acknowledgement Form\n## Fee Proposal Form\n### Design Work\n#### Design Development Work Costs\n#### Working Drawings Work Costs\n### Construction Work\n#### Construction Administration\n#### General Conditions (Staffing)\n## Professional Billing Rate Sheet\n## Certification","[{\"question\":\"What forms must be submitted together as part of the Price Proposal?\",\"answer\":\"The Price Proposal must include five forms submitted together: Proposer Information, Addenda Acknowledgement, Fee Proposal Form, Professional Billing Rate Sheet, and Certification.\"},{\"question\":\"How should the fee for Design Work be structured?\",\"answer\":\"The Design Work fee is based on the aggregate of Design Development Work and Working Drawings Work, priced as a lump sum fixed as of the Effective Date of the Agreement, with fully loaded fees including overhead and profit.\"},{\"question\":\"What does the Construction Administration line item cover?\",\"answer\":\"Construction Administration includes professional services needed to support Construction Administration, such as RFI responses, submittal review, resolution of constructability issues, coordination with the Judicial Council and Authorities Having Jurisdiction, site visits, observations, and meeting attendance as required.\"}]","Price Proposal Forms & Instructions - attachment 1 | DOCX",1788168433,4,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":85,"head_meta":87,"extra_data":89,"updated_unix":28},"price-proposal-forms-instructions-attachment-1","",{"@graph":36,"@context":84},[37,53,67],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/template/","Template",2,{"item":49,"name":13,"@type":43,"position":50},"https://docshare.wps.com/template/forms/",3,{"item":52,"name":14,"@type":43,"position":29},"https://docshare.wps.com/template/price-proposal-forms-instructions-attachment-1/165252/",{"url":52,"name":14,"@type":54,"author":55,"headline":14,"publisher":57,"fileFormat":60,"inLanguage":23,"description":15,"dateModified":61,"datePublished":61,"encodingFormat":60,"isAccessibleForFree":62,"interactionStatistic":63},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":41,"name":58,"@type":59},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-08-31",true,{"@type":64,"interactionType":65,"userInteractionCount":4},"InteractionCounter",{"@type":66},"ViewAction",{"@type":68,"mainEntity":69},"FAQPage",[70,76,80],{"name":71,"@type":72,"acceptedAnswer":73},"What forms must be submitted together as part of the Price Proposal?","Question",{"text":74,"@type":75},"The Price Proposal must include five forms submitted together: Proposer Information, Addenda Acknowledgement, Fee Proposal Form, Professional Billing Rate Sheet, and Certification.","Answer",{"name":77,"@type":72,"acceptedAnswer":78},"How should the fee for Design Work be structured?",{"text":79,"@type":75},"The Design Work fee is based on the aggregate of Design Development Work and Working Drawings Work, priced as a lump sum fixed as of the Effective Date of the Agreement, with fully loaded fees including overhead and profit.",{"name":81,"@type":72,"acceptedAnswer":82},"What does the Construction Administration line item cover?",{"text":83,"@type":75},"Construction Administration includes professional services needed to support Construction Administration, such as RFI responses, submittal review, resolution of constructability issues, coordination with the Judicial Council and Authorities Having Jurisdiction, site visits, observations, and meeting attendance as required.","https://schema.org",{"og:url":52,"og:type":86,"og:title":14,"og:site_name":58,"og:description":15},"article",{"robots":88,"canonical":52},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":91},[92,96,101,106,111,116,119,124,129],{"id":21,"doc_module":11,"doc_module_name":46,"category_name":93,"show_sort_weight":94,"slug":95},"Presentations",90,"presentations",{"id":97,"doc_module":11,"doc_module_name":46,"category_name":98,"show_sort_weight":99,"slug":100},12,"Resumes",80,"resumes",{"id":102,"doc_module":11,"doc_module_name":46,"category_name":103,"show_sort_weight":104,"slug":105},14,"Invoices",70,"invoices",{"id":107,"doc_module":11,"doc_module_name":46,"category_name":108,"show_sort_weight":109,"slug":110},15,"Posters",60,"posters",{"id":112,"doc_module":11,"doc_module_name":46,"category_name":113,"show_sort_weight":114,"slug":115},16,"Social Media",50,"social-media",{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":117,"slug":118},40,"forms",{"id":120,"doc_module":11,"doc_module_name":46,"category_name":121,"show_sort_weight":122,"slug":123},18,"Letters",30,"letters",{"id":125,"doc_module":11,"doc_module_name":46,"category_name":126,"show_sort_weight":127,"slug":128},21,"Paper Templates",5,"papers-templates",{"id":130,"doc_module":11,"doc_module_name":46,"category_name":131,"show_sort_weight":4,"slug":132},158,"General","general-158"]