[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-355268-105":53,"doc-detail-355268-en":118},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":111,"head_meta":113,"extra_data":115,"updated_unix":117},105,"en","pre-task-planning-checklist-worksheet-safety","Pre-Task Planning Checklist Worksheet - Safety","","Pre-Task Planning Checklist Worksheet supports non-standard or non-documented work by requiring completion before work begins. It guides teams to mitigate potential safety hazards through structured yes/no checks and prompts for control measures to be described in Part F. The checklist covers safety controls (barricading, live systems, lockout/tagout, fall protection, equipment such as ladders and PIT/forklifts, chemicals, confined space, noise, and interlocks), ergonomics risk factors, and potential impacts on safety and facility systems, enabling compliance and auditing where applicable.",{"@graph":63,"@context":110},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/pre-task-planning-checklist-worksheet-safety/355268/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/pre-task-planning-checklist-worksheet-safety/355268.png","ImageObject",442,249,{"name":88,"@type":89},"Blitz","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-23","2026-09-22",true,{"@type":98,"interactionType":99,"userInteractionCount":8},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104],{"name":105,"@type":106,"acceptedAnswer":107},"What ergonomics and impact areas does the checklist address?","Question",{"text":108,"@type":109},"Ergonomics focuses on lifting limits, repetitive or forceful exertions, awkward postures and clearance, and supporting objects during securing or removal. Potential impacts covers risks to fire detection and life safety systems, hazardous gas/chemical delivery systems, climbing/working above equipment, equipment movement, fluid draining, and interruption of personnel traffic paths.","Answer","https://schema.org",{"og:url":78,"og:type":112,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":114,"canonical":78},"index,follow",{"doc_id":116,"site_id":56},355268,1791549279,{"code":4,"msg":5,"data":119},{"doc_id":116,"user_id":120,"nickname":88,"user_avatar":121,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":122,"file_id":123,"file_url":124,"file_type":125,"file_size":126,"view_count":8,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":73,"language":127,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":128,"faqs":129,"seo_title":130,"seo_description":61,"update_tm":131,"read_time":9},24464137899374,"https://us-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","INSTRUCTIONS: This worksheet is to be used prior to undertaking non-standard / non-documented work. Complete before engaging in non-standard / non-documented work. Use Part F to develop safe written procedure(s) .  \n\n| Intel Owner: | Tool ID / Description: | Effective Date: |\n| --- | --- | --- |\n| Supplier Contact: | Brief Description of Work: |  |\n\nAny personal information collected from an escorted guest worker will be subject to the Intel External Privacy Notice ([https://www.intel.com/content/www/us/en/privacy/intel-privacy-notice.html](https://www.intel.com/content/www/us/en/privacy/intel-privacy-notice.html)).  \nThe Intel Global Contingent Worker Privacy Notice  \n([https://employeecontent.intel.com/content/corp/Global_Employee_and_Global_Contingent_Worker_Privacy.html\\#h](https://employeecontent.intel.com/content/corp/Global_Employee_and_Global_Contingent_Worker_Privacy.html#h)eader2)  \nwill apply, on a prospective basis, when and if the guest worker becomes a contingent worker. Without limiting any of the foregoing, to ensure compliance with this checklist, Intel may audit the guest worker’s completion of all or some of the tasks below.  \nPre-Task Planning Checklist  \nPurpose: To mitigate all potential safety hazards before engaging in any non-documented / non-standard work.  \n\n| A. SAFETY: Please describe control measures in Section “F” for any Safety item checked “Yes” | YES | NO |\n| --- | --- | --- |\n| 1. Are barricading and/or signage required to protect personnel, facilities or equipment?  \u003Cbr>2. Will work involve live systems or energized equipment? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .\u003Cbr>3. Is lockout/tagout of hazardous energies required?  \u003Cbr>4. Will work involve exposure to falls of 4 feet or greater for non-construction work or 6 feet or greater for\u003Cbr>construction work?  \u003Cbr>5. Are ladders, MEWP, scaffolds or work platforms needed to perform the task safely?  \u003Cbr>6. Will the task involve use of powered industrial truck (PIT)/forklift  \u003Cbr>a. If load is being horizontally moved; is load secured or alternate securing plan been created?  \u003Cbr>7. Will the task involve the use of chemicals or have the potential for chemical exposure?  \u003Cbr>a. Does the work require disposal of chemicals?  \u003Cbr>b. Will the work generate odors (odor notification posted and security notified)?  \u003Cbr>c. Does task require special PPE? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .\u003Cbr>8. Does this task require the demolition of electrical/chemical systems or equipment?  \u003Cbr>9. Does this task require entry into a confined space?\u003Cbr>10. Does this task involve use of inert gas or other potential to create oxygen deficiency?\u003Cbr>11. Does this work involve removing raised floor tiles and/or working under the raised floor?  \u003Cbr>12. Will work involve working with sharp tools or materials (e.g., sharp edges, knives, Unistrut, etc. )  \u003Cbr>13. Will work involve elevated noise levels?  \u003Cbr>11. Will work involve defeating equipment safety interlocks (use Interlock Defeat signage & return to normal configuration)? |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n\n\n| B. ERGONOMICS: Please describe control measures in section “F” for any ergonomics items checked “YES” | YES | NO |\n| --- | --- | --- |\n| 1. Do material handling / lifting tasks exceed weight limits for safe one person handling? Verify weight of objects to be lifted or moved. Typically, objects over 25 pounds require two people and objects over 50 pounds require use of a mechanical assist (e.g. lifts, carts, hoists) .\u003Cbr>2. Are forceful or repetitive hand exertions required? Where possible use tools to increase leverage and/or automate (e.g. breaking a vacuum seal, loosing tight bolt","cbCainWodyTNNIAQ","https://ap.wps.com/l/cbCainWodyTNNIAQ","pdf",641402,"English","# Pre-Task Planning Checklist\n## Safety\n## Ergonomics\n## Potential Impacts\n## Permits","[{\"question\":\"What ergonomics and impact areas does the checklist address?\",\"answer\":\"Ergonomics focuses on lifting limits, repetitive or forceful exertions, awkward postures and clearance, and supporting objects during securing or removal. Potential impacts covers risks to fire detection and life safety systems, hazardous gas/chemical delivery systems, climbing/working above equipment, equipment movement, fluid draining, and interruption of personnel traffic paths.\"}]","Pre-Task Planning Checklist Worksheet - Safety | PDF",1790117275]