[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243379-105":53,"doc-detail-243379-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","pr8701-specification-for-asset-information-version-history","Pr8701 - Specification for Asset Information - Version History","","The document defines Unitywater requirements for delivering asset information documentation at project completion, covering construction, commissioning, and subsequent operations and maintenance. It establishes that asset information consists of a suite of design, construction, commissioning, operating, and maintenance records provided in a specified format. It also outlines document governance through sponsor, owner, and contact roles and records a detailed version history describing revisions, approvals, and administrative amendments across multiple document versions.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":51,"@type":70,"position":76},"https://docshare.wps.com/template/general/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/pr8701-specification-for-asset-information-version-history/243379/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/pr8701-specification-for-asset-information-version-history/243379.png","ImageObject",442,249,{"name":88,"@type":89},"Mabel","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-09-24","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":76},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of the Specification for Asset Information?","Question",{"text":108,"@type":109},"It defines Unitywater’s requirements for asset information documentation to be provided upon completion of construction and commissioning for projects delivered on Unitywater’s behalf.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What does “asset information” include under this Specification?",{"text":113,"@type":109},"Asset information includes a suite of design, construction, commissioning, operating, and maintenance documentation related to an asset or assets, provided in a specified format.",{"name":115,"@type":106,"acceptedAnswer":116},"How is the document maintained and updated?",{"text":117,"@type":109},"A version history records revisions, reviewers, approvals, dates, and revision types, including periodic reviews and minor administrative amendments to references and terminology.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},243379,1789203428,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":50,"category_name":51,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":76,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":15,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":125,"read_time":79},7971474920318,"https://ap-avatar.wpscdn.com/avatar/74000ee537e6b0ca360?x-image-process=image/resize,m_fixed,w_180,h_180&k=1788430171632181674","Pr8701-Specification for Asset Information  \nDocument Details  \n\n| Document Sponsor | Infrastructure Standards and Product Approvals Committee |\n| --- | --- |\n| Document Owner | Head of Asset Management , SIS |\n| Document Contact | Infrastructure Standards and Assurance Team |\n| References | Refer to Appendix B of this document |\n\nVersion History  \n\n| Revision | Reviewed by | Approved by | Date approved | Revision type |\n| --- | --- | --- | --- | --- |\n| 5.0 | Ben van Wegen, Manager Capital Delivery | Ben van Wegen,\u003Cbr>Manager Capital Delivery | 25/11/2019 | Periodic Review, inclusion of version history table |\n| 6.0 | Laura Bryson, Policy & Documents Advisor | Laura Bryson, Policy & Documents Advisor | 21/02/2020 | Minor admin amendment to update reference title for Pr8843 and remove obsolete Pr9080 (as superseded by SEQ Asset Information Specification) . |\n| 7.0 | Laura Bryson, Policy & Documents Advisor | Laura Bryson, Policy & Documents Advisor | 18/05/2020 | Minor admin amendment to update reference title for Pr10360 |\n| 8.0 | Andrew Currie, Project Support Services Manager | Andrew Currie, Project Support Services Manager on behalf of Manager Capital Delivery | 08/02/2021 | Reviewed as part of Capital Works Reform program. Updates to references section, replacing F10435-Project Deliverables Checklist with F10844-Operational Readiness Checklist and template admin update. |\n| 9.0 | Kate Welsh, Infrastructure Standards Engineer | Ben van Wegen,\u003Cbr>Manager Capital Delivery | 11/04/2022 | Minor update to add details and reference the SEQ code and certification stamps. |\n| 10.0 | Alan White, Infrastructure Standards Engineer Civil Yvette Skinner, Infrastructure Standards Manager | Ivan Beirne, Head of Asset Management | 15/08/2022 | Updating RPEQ Certification stamps. Change of document owner. |\n| 11.0 | Jenifer Munro, Document Control Officer | N/A | N/A | 20/09/2023 Minor admin amend align with template format |\n| 12.0 | Yvette Skinner, Infrastructure Standards Manager | Ivan Beirne, Head of Asset Management | 22/04/2025 | Updating Certification stamps in Appendix C to align with SEQ Code Asset Information Specification and allow electronic submission |\n| 13.0 | L. Bryson, Policy & Documents Advisor | N/A | N/A | Minor amend to update position / Branch titles as per current SIS org structure. Update STP to WWTP terminology. |\n\nContents  \n1. Introduction ..................................................................................................................... 4  \n2. Scope.............................................................................................................................. 4  \n2.1 Responsibilities ...................................................................................................... 4  \n2.2 Applicable Sections................................................................................................ 4  \n3. Design Documentation .................................................................................................... 5  \n3.1 Design Report ........................................................................................................ 5  \n3.2 Design Report Attachments ................................................................................... 5  \n3.3 Design Report Calculations .................................................................................... 5  \n3.4 Design Drawings .................................................................................................... 5  \n3.5 Digital Engineering (2D or 3D Models) ................................................................... 5  \n4. As Built Documentation ................................................................................................... 6  \n4.1 Drawings ................................................................................................................ 6  \n4.2 Digital Engineering Models..................................................................","cbCaibJv0ff0YXhp","https://ap.wps.com/l/cbCaibJv0ff0YXhp","pdf",412199,"English","# 1. Introduction\n# 2. Scope\n## 2.1 Responsibilities\n## 2.2 Applicable Sections\n# 3. Design Documentation\n## 3.1 Design Report\n## 3.2 Design Report Attachments\n## 3.3 Design Report Calculations\n## 3.4 Design Drawings\n## 3.5 Digital Engineering (2D or 3D Models)\n# 4. As Built Documentation\n## 4.1 Drawings\n## 4.2 Digital Engineering Models\n## 4.3 Active and Decommissioned Assets\n## 4.4 Manuals\n## 4.5 Commissioning\n## 4.6 Warranties\n## 4.7 Media\n## 4.8 Certificates of Registration\n## 4.9 Control Systems\n## 4.10 Operational Contingency\n# 5. Appendices\n## Appendix A – Definitions/Acronyms\n## Appendix B – References\n## Appendix C – Certification Stamps","[{\"question\":\"What is the purpose of the Specification for Asset Information?\",\"answer\":\"It defines Unitywater’s requirements for asset information documentation to be provided upon completion of construction and commissioning for projects delivered on Unitywater’s behalf.\"},{\"question\":\"What does “asset information” include under this Specification?\",\"answer\":\"Asset information includes a suite of design, construction, commissioning, operating, and maintenance documentation related to an asset or assets, provided in a specified format.\"},{\"question\":\"How is the document maintained and updated?\",\"answer\":\"A version history records revisions, reviewers, approvals, dates, and revision types, including periodic reviews and minor administrative amendments to references and terminology.\"}]","Pr8701 - Specification for Asset Information - Version History | PDF"]