[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-164987-en":3,"doc-seo-164987-105":30,"detail-sidebar-cat-1-en-105":92},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},164987,962085571259,"Putri","https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0",1,21,"Paper Templates","Pneumatic Tube System - Part 1 General","This section defines engineering, furnishing, and installation requirements for a complete pneumatic tube system as shown on contract drawings, including applicable contract provisions from Division 01 and related specification sections. It specifies system sizing criteria, required stations and components, carrier provisions, and the system’s expandability to support future hospital growth. It also establishes contractor and installer qualifications, including certification, experience thresholds, welding and electrical licensing, and product consistency requirements, plus safety testing conditions.","SECTION 14 92 00\u000bPneumatic Tube System\nPART 1 GENERAL\n1.1 DESCRIPTION\nA.\tThis section specifies the engineering, furnishing and installation of the complete Pneumatic Tube System as described herein and as indicated on the Contract drawings.\nB.\tDrawings and general provisions of contract, including General, Supplemental, Special conditions, and Division 01 Specification Sections, apply to this section.\nC.\tThe Pneumatic Tubes size must be six (6) inches, (system size is the outside diameter of the tubing). Air Tubes must be four (4) inches.\nThe system must include (add number) of stations. The system must include (add number) blowers. The system must include (add number) diverters and tubing to link all stations. The system must be expandable by adding stations, diverters, blowers, and tubing to accommodate future growth of the hospital.\nD.\tProvide (add number) carriers per station as required by the VA.\n1.2 RELATED WORK\nA.\tSection 01 33 23, SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FAR 52.236\u001e21) and, SPECIAL NOTES (VAAR 852.236-91), in GENERAL CONDITIONS.\nB.\tSection 07 84 00, FIRESTOPPING: Sealing around penetrations to maintain the integrity of fire-rated construction.\nC.\tSECTION 09 06 00, SCHEDULE FOR FINISHES: As a master format for construction projects, to identify interior and exterior material finishes for type, texture, patterns, color, and placement.\nD.\tSection 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS: Requirements for seismic restraint of non-structural components.\nE.\tSection 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General electrical requirements that are common to more than one section.\nF.\tSection 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW): Low Voltage power and lighting wiring.\nG.\tSection 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to provide a low impedance path for possible ground fault currents.\nH.\tSection 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS: Conduits for cables and wiring.\nI.\tSection 26 05 73, OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY: Requirements for installing the over-current protective devices to ensure proper equipment and personnel protection.\nJ.\tSection 26 22 00, LOW-VOLTAGE TRANSFORMERS: Low voltage transformers.\nK.\tSection 26 24 16, PANELBOARDS: Low voltage panelboards.\nL.\tSection 26 43 13, TRANSIENT-VOLTAGE SURGE SUPPRESSION: Surge suppressors installed in panelboards.\nM.\tSection 26 51 00, INTERIOR LIGHTING: Fixture and ballast type for interior lighting.\n1.3 QUALIfications\nA.\tApproval by the Contracting Officer is required for products and services of proposed manufacturers, suppliers, installers, and must be contingent upon submission of certificates by the Contractor stating the following:\n1.\tPneumatic Tube Contractor is currently and regularly engaged in the installation of Pneumatic Tube equipment as one of his principal products.\n2.\tPneumatic Tube Contractor must have five (5) years of successful experience, trained supervisory personnel, and facilities to install Pneumatic Tube equipment specified herein.\n3.\tMechanic (Installer) must have passed a Mechanic Examination approved by the U.S. Department of Labor and have technical qualifications of at least five years of experience in the pneumatic tube industry or 10,000 hours of field experience working in the pneumatic tube industry with technical update training. Apprentices must be actively pursuing Certified Mechanic status. Certification must be submitted for all workers employed in this capacity.\nB.\tWelding at the project site must be performed by certified welders who have previously qualified by test as prescribed in American Welding Society Publications AWS Dl.1 to perform the type of work required.  Certificates must be submitted for all workers employed in this capacity. A welding or hot work permit is required for each day and must be obtained from the VAMC safety department. ","cbCaieY4HMEw2fwW","https://ap.wps.com/l/cbCaieY4HMEw2fwW","docx",40618,13,"English","en",105,"# SECTION 14 92 00 Pneumatic Tube System\n## PART 1 GENERAL\n## 1.1 DESCRIPTION\n## 1.2 RELATED WORK\n## 1.3 QUALIFICATIONS\n## 1.4 APPLICABLE PUBLICATIONS","[{\"question\":\"What does the pneumatic tube system section cover?\",\"answer\":\"It specifies the engineering, furnishing, and installation of the complete pneumatic tube system, aligned with the contract drawings and contract provisions.\"},{\"question\":\"How are tube sizes and key system components defined?\",\"answer\":\"The tubing size requirements are stated, including pneumatic tube system dimensions and air tube sizing, along with requirements for stations, blowers, diverters, and interconnecting tubing.\"},{\"question\":\"What qualifications are required for the pneumatic tube contractor and installers?\",\"answer\":\"The contractor and installers must meet experience and certification requirements, including approval by the contracting officer, verified pneumatic tube installation experience, certified mechanics, and appropriate welding and electrical licensing.\"}]","Pneumatic Tube System - Part 1 General | DOCX",1788164146,5,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":87,"head_meta":89,"extra_data":91,"updated_unix":28},"pneumatic-tube-system-part-1-general","",{"@graph":36,"@context":86},[37,54,69],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/template/","Template",2,{"item":49,"name":13,"@type":43,"position":50},"https://docshare.wps.com/template/paper-templates/",3,{"item":52,"name":14,"@type":43,"position":53},"https://docshare.wps.com/template/pneumatic-tube-system-part-1-general/164987/",4,{"url":52,"name":14,"@type":55,"author":56,"headline":14,"publisher":58,"fileFormat":61,"inLanguage":23,"description":15,"dateModified":62,"datePublished":63,"encodingFormat":61,"isAccessibleForFree":64,"interactionStatistic":65},"DigitalDocument",{"name":9,"@type":57},"Person",{"url":41,"name":59,"@type":60},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-06","2026-08-31",true,{"@type":66,"interactionType":67,"userInteractionCount":47},"InteractionCounter",{"@type":68},"ViewAction",{"@type":70,"mainEntity":71},"FAQPage",[72,78,82],{"name":73,"@type":74,"acceptedAnswer":75},"What does the pneumatic tube system section cover?","Question",{"text":76,"@type":77},"It specifies the engineering, furnishing, and installation of the complete pneumatic tube system, aligned with the contract drawings and contract provisions.","Answer",{"name":79,"@type":74,"acceptedAnswer":80},"How are tube sizes and key system components defined?",{"text":81,"@type":77},"The tubing size requirements are stated, including pneumatic tube system dimensions and air tube sizing, along with requirements for stations, blowers, diverters, and interconnecting tubing.",{"name":83,"@type":74,"acceptedAnswer":84},"What qualifications are required for the pneumatic tube contractor and installers?",{"text":85,"@type":77},"The contractor and installers must meet experience and certification requirements, including approval by the contracting officer, verified pneumatic tube installation experience, certified mechanics, and appropriate welding and electrical licensing.","https://schema.org",{"og:url":52,"og:type":88,"og:title":14,"og:site_name":59,"og:description":15},"article",{"robots":90,"canonical":52},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":93},[94,99,104,109,114,119,124,129,131],{"id":95,"doc_module":11,"doc_module_name":46,"category_name":96,"show_sort_weight":97,"slug":98},11,"Presentations",90,"presentations",{"id":100,"doc_module":11,"doc_module_name":46,"category_name":101,"show_sort_weight":102,"slug":103},12,"Resumes",80,"resumes",{"id":105,"doc_module":11,"doc_module_name":46,"category_name":106,"show_sort_weight":107,"slug":108},14,"Invoices",70,"invoices",{"id":110,"doc_module":11,"doc_module_name":46,"category_name":111,"show_sort_weight":112,"slug":113},15,"Posters",60,"posters",{"id":115,"doc_module":11,"doc_module_name":46,"category_name":116,"show_sort_weight":117,"slug":118},16,"Social Media",50,"social-media",{"id":120,"doc_module":11,"doc_module_name":46,"category_name":121,"show_sort_weight":122,"slug":123},17,"Forms",40,"forms",{"id":125,"doc_module":11,"doc_module_name":46,"category_name":126,"show_sort_weight":127,"slug":128},18,"Letters",30,"letters",{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":29,"slug":130},"papers-templates",{"id":132,"doc_module":11,"doc_module_name":46,"category_name":133,"show_sort_weight":4,"slug":134},158,"General","general-158"]