[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-165472-en":3,"doc-seo-165472-105":30,"detail-sidebar-cat-1-en-105":90},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},165472,4398048950312,"Violet","https://ap-avatar.wpscdn.com/avatar/400002538284de19e3c?_k=1778320343897328908",1,17,"Forms","Planning Application Documents - Checklist","Planning application document set covering forms, certificates, notices, and completed CIL questionnaire, together with the full planning application fee. Includes detailed site documentation such as location plan with site edge in red, block plan, and comprehensive architectural drawings (floor plans, roof plans, elevations, sections, and finished floor/site levels). Contains supporting statements and assessments spanning design and access, ecological studies with BNG metrics and strategy, visual impact and townscape/landscape, land contamination with UXO risk, planning statements with economic and obligations, community involvement, sustainability, transport and travel, flood risk and drainage, heritage and air quality, noise, utilities and connectivity, daylight and sunlight, lighting, wind microclimate, public realm/landscape, fire safety, arboriculture, open space, and relevant VuCity files.","Planning Application Documents:\nPlanning application form, certificates and notices\nCompleted CIL Questionnaire\nPlanning Application Fee (full)\nLocation plan with site edged red\nBlock plan\nExisting & proposed floor plans, roof plans, elevations, sections and finished floor and site levels\nAccommodation Schedule\nDesign & Access Statement\nDesign Intent Document\nPreliminary Ecological Assessment, required surveys and BNG metric and strategy\nTownscape/Landscape and Visual Impact Assessment VuCity files\nLand Contamination Assessment inc UXO Risk Assessment\nPlanning Statement inc. Economic Statement and Planning Obligations\nStatement of Community Involvement\nSustainability and Energy Strategy\nBREEAM Pre Assessment\nTransport Assessment\nTravel Plan\nFlood Risk Assessment (inc. Sequential) and Drainage Strategy\nHeritage Statement\nHistoric Environment DBA\nAir Quality Assessment\nNoise Assessment\nUtilities Statement inc. Broadband Connectivity Assessment\nDaylight & Sunlight Assessment\nLighting Assessment\nWind Microclimate Assessment\nPublic Realm and Landscape Strategy\nFire Safety Strategy Report and Form\nTree Survey, Arboricultural Impact Assessment and Method Statement\nOpen Space Assessment\nVuCity files","cbCaivJ2yzcSdaHd","https://ap.wps.com/l/cbCaivJ2yzcSdaHd","docx",41657,5,"English","en",105,"# Planning application administration\n## CIL questionnaire and fee\n# Site and design information\n## Location and block plans\n## Drawings and design intent\n## Accommodation schedule and levels\n# Design, access, and supporting statements\n## Design & Access Statement\n## Design Intent Document\n## Planning statement and obligations\n## Statement of community involvement\n## Heritage statement and historic environment DBA\n# Assessments and strategies\n## Ecology, BNG, and surveys\n## Townscape/landscape and visual impact\n## Land contamination and UXO risk\n## Sustainability, energy and BREEAM pre-assessment\n## Transport assessment and travel plan\n## Flood risk assessment and drainage strategy\n## Air quality, noise, and daylight/sunlight\n## Lighting, wind microclimate, and public realm strategy\n## Utilities, broadband connectivity, and flood/drainage support\n## Fire safety, tree survey, arboricultural assessment\n## Open space assessment\n# Data files\n## VuCity files","[{\"question\":\"What core administrative items are required for the planning submission?\",\"answer\":\"The set includes planning application forms, certificates and notices, a completed CIL Questionnaire, and the planning application fee (full).\"},{\"question\":\"Which drawings and plans are included for site and design description?\",\"answer\":\"It includes a location plan with the site edged red, a block plan, and existing \\u0026 proposed drawings covering floor plans, roof plans, elevations, sections, and finished floor/site levels.\"},{\"question\":\"What types of assessments are covered beyond the design documents?\",\"answer\":\"The package covers ecological assessment and BNG strategy, visual impact and townscape/landscape, land contamination including UXO risk, transport and travel planning, flood risk and drainage, heritage, air quality, noise, utilities and broadband connectivity, daylight/sunlight, lighting, wind microclimate, fire safety, arboriculture, and open space.\"}]","Planning Application Documents - Checklist | DOCX",1788172167,2,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":85,"head_meta":87,"extra_data":89,"updated_unix":28},"planning-application-documents-checklist","",{"@graph":36,"@context":84},[37,53,67],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,47,50],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":29},"https://docshare.wps.com/template/","Template",{"item":48,"name":13,"@type":43,"position":49},"https://docshare.wps.com/template/forms/",3,{"item":51,"name":14,"@type":43,"position":52},"https://docshare.wps.com/template/planning-application-documents-checklist/165472/",4,{"url":51,"name":14,"@type":54,"author":55,"headline":14,"publisher":57,"fileFormat":60,"inLanguage":23,"description":15,"dateModified":61,"datePublished":61,"encodingFormat":60,"isAccessibleForFree":62,"interactionStatistic":63},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":41,"name":58,"@type":59},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-08-31",true,{"@type":64,"interactionType":65,"userInteractionCount":4},"InteractionCounter",{"@type":66},"ViewAction",{"@type":68,"mainEntity":69},"FAQPage",[70,76,80],{"name":71,"@type":72,"acceptedAnswer":73},"What core administrative items are required for the planning submission?","Question",{"text":74,"@type":75},"The set includes planning application forms, certificates and notices, a completed CIL Questionnaire, and the planning application fee (full).","Answer",{"name":77,"@type":72,"acceptedAnswer":78},"Which drawings and plans are included for site and design description?",{"text":79,"@type":75},"It includes a location plan with the site edged red, a block plan, and existing & proposed drawings covering floor plans, roof plans, elevations, sections, and finished floor/site levels.",{"name":81,"@type":72,"acceptedAnswer":82},"What types of assessments are covered beyond the design documents?",{"text":83,"@type":75},"The package covers ecological assessment and BNG strategy, visual impact and townscape/landscape, land contamination including UXO risk, transport and travel planning, flood risk and drainage, heritage, air quality, noise, utilities and broadband connectivity, daylight/sunlight, lighting, wind microclimate, fire safety, arboriculture, and open space.","https://schema.org",{"og:url":51,"og:type":86,"og:title":14,"og:site_name":58,"og:description":15},"article",{"robots":88,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":91},[92,97,102,107,112,117,120,125,129],{"id":93,"doc_module":11,"doc_module_name":46,"category_name":94,"show_sort_weight":95,"slug":96},11,"Presentations",90,"presentations",{"id":98,"doc_module":11,"doc_module_name":46,"category_name":99,"show_sort_weight":100,"slug":101},12,"Resumes",80,"resumes",{"id":103,"doc_module":11,"doc_module_name":46,"category_name":104,"show_sort_weight":105,"slug":106},14,"Invoices",70,"invoices",{"id":108,"doc_module":11,"doc_module_name":46,"category_name":109,"show_sort_weight":110,"slug":111},15,"Posters",60,"posters",{"id":113,"doc_module":11,"doc_module_name":46,"category_name":114,"show_sort_weight":115,"slug":116},16,"Social Media",50,"social-media",{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":118,"slug":119},40,"forms",{"id":121,"doc_module":11,"doc_module_name":46,"category_name":122,"show_sort_weight":123,"slug":124},18,"Letters",30,"letters",{"id":126,"doc_module":11,"doc_module_name":46,"category_name":127,"show_sort_weight":21,"slug":128},21,"Paper Templates","papers-templates",{"id":130,"doc_module":11,"doc_module_name":46,"category_name":131,"show_sort_weight":4,"slug":132},158,"General","general-158"]