[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-172527-105":53,"doc-detail-172527-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","phase-2-soil-fumigation-post-application-summary-metam-sodium-metam-potassium-products","PHASE 2 SOIL FUMIGATION POST APPLICATION SUMMARY - METAM SODIUM / METAM POTASSIUM PRODUCTS","","Phase 2 soil fumigation post-application summary template for Metam Sodium and Metam Potassium products. Organizes required reporting elements covering general application information, weather conditions, tarp damage and repair, tarp perforation/removal, complaints and incident descriptions, and communication among applicator, owner, and other on-site handlers. Includes posting signs for fumigant-treated areas and buffer zones, handler information for changes since the FMP, and other deviations from the FMP. Provides attachment checkboxes for relevant monitoring and change documentation.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/phase-2-soil-fumigation-post-application-summary-metam-sodium-metam-potassium-products/172527/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/phase-2-soil-fumigation-post-application-summary-metam-sodium-metam-potassium-products/172527.png","ImageObject",442,249,{"name":88,"@type":89},"Jordan Avery","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-25","2026-09-01",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",7,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What sections are required in the Phase 2 soil fumigation post application summary?","Question",{"text":109,"@type":110},"It includes general application information, weather conditions, tarp damage and repair, tarp perforation/removal, complaints, incident descriptions, communication between the applicator and on-site handlers, posting signs, handler information for changes since the FMP, and other deviations from the FMP.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How should tarp damage and perforation be documented?",{"text":114,"@type":110},"The summary contains dedicated elements for tarp damage and repair, and for tarp perforation/removal, ensuring the post-application condition and corrective actions are recorded.",{"name":116,"@type":107,"acceptedAnswer":117},"Which attachment documents may be added to the post application summary?",{"text":118,"@type":110},"Attachments are optional and should be checked only when applicable, such as handler information for changes since the FMP, air monitoring results, water run application monitoring results, and other recorded notes.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},172527,1790160661,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":9},1099523882367,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","PHASE 2 SOIL FUMIGATION POST APPLICATION SUMMARY\n(METAM SODIUM / METAM POTASSIUM PRODUCTS)\nPost Application Summary Elements:\n\u0013 HYPERLINK \\l \"General_Application_Info_PAS\" \u0014General Application Information\u0015\n\u0013 HYPERLINK \\l \"Weather_Conditions_PAS\" \u0014Weather Conditions\u0015\n\u0013 HYPERLINK \\l \"Tarp_Damage_Repair_PAS\" \u0014Tarp Damage and Repair   \u0015\n\u0013 HYPERLINK \\l \"Tarp_Perforation_Removal_PAS\" \u0014Tarp Perforation/Removal    \u0015\n\u0013 HYPERLINK \\l \"Complaints\" \u0014Complaints\u0015\n\u0013 HYPERLINK \\l \"Description_of_Incidents\" \u0014Description of Incidents   \u0015\n\u0013 HYPERLINK \\l \"Communication_Between_Applicator_PAS\" \u0014Communication between Applicator, Owner, and Other On-site Handlers\u0015\n\u0013 HYPERLINK \\l \"Posting_Signs_Fumigant_Treated_Area_PAS\" \u0014Posting Signs – Fumigant Treated Area and Buffer Zones\u0015\n\u0013 HYPERLINK \\l \"HandlerInfoSinceFMP\" \u0014Handler Information for Changes since the FMP\u0015\n\u0013 HYPERLINK \\l \"Other_Deviations_from_the_FMP\" \u0014Other Deviations from the FMP\u0015\nAttachments:\nCheck the boxes if the information below is attached to the Post Application Summary (e.g., there are changes from the FMP or monitoring information has been recorded.  Attachments that are not applicable do not need to be included in the final Post Application Summary).\n\u0013 FORMCHECKBOX \u0014\u0015  \u0013 HYPERLINK \\l \"Handler_Information_PAS\" \u0014Handler Information (for changes since the FMP\u0015)\n\u0013 FORMCHECKBOX \u0014\u0015  \u0013 HYPERLINK \\l \"Sensory_Irritation_Experienced\" \u0014Air Monitoring Results \u0015\n\u0013 FORMCHECKBOX \u0014\u0015  Water Run Application Monitoring Results\n\u0013 FORMCHECKBOX \u0014\u0015  Other: \u0013 FORMTEXT \u0014     \u0015\n\u000fPHASE 2 SOIL FUMIGATION POST APPLICATION SUMMARY\n(METAM SODIUM / METAM POTASSIUM PRODUCTS)","cbCaictGmPsGHPwh","https://ap.wps.com/l/cbCaictGmPsGHPwh","docx",36615,"English","# Post Application Summary Elements\n## Attachments","[{\"question\":\"What sections are required in the Phase 2 soil fumigation post application summary?\",\"answer\":\"It includes general application information, weather conditions, tarp damage and repair, tarp perforation/removal, complaints, incident descriptions, communication between the applicator and on-site handlers, posting signs, handler information for changes since the FMP, and other deviations from the FMP.\"},{\"question\":\"How should tarp damage and perforation be documented?\",\"answer\":\"The summary contains dedicated elements for tarp damage and repair, and for tarp perforation/removal, ensuring the post-application condition and corrective actions are recorded.\"},{\"question\":\"Which attachment documents may be added to the post application summary?\",\"answer\":\"Attachments are optional and should be checked only when applicable, such as handler information for changes since the FMP, air monitoring results, water run application monitoring results, and other recorded notes.\"}]","PHASE 2 SOIL FUMIGATION POST APPLICATION SUMMARY - METAM SODIUM / METAM POTASSIUM PRODUCTS | DOCX",1788294238]