[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-191864-105":53,"doc-detail-191864-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","petition-of-national-grid-for-gas-mainlocation-order-for-gas-mainlocation-grant-of-location-exhibit-a","PETITION OF NATIONAL GRID FOR GAS MAINLOCATION - ORDER FOR GAS MAINLOCATION - GRANT OF LOCATION EXHIBIT A","","Petition and approval documentation for National Grid gas main location in Winchester, Massachusetts, requesting consent for the installation and related underground infrastructure in specified public ways. The order approves the location described in the petition dated 05/24/2016 and requires compliance with applicable laws and town ordinances. Engineering review records the plan to extend an approximately 370-foot four-inch plastic gas main on Pond Street, sets coordination needs with MassDOT intersection reconstruction, and lists conditions for permits, utility protection, repairs, bonding, indemnification, and Dig Safe recording.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/petition-of-national-grid-for-gas-mainlocation-order-for-gas-mainlocation-grant-of-location-exhibit-a/191864/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/petition-of-national-grid-for-gas-mainlocation-order-for-gas-mainlocation-grant-of-location-exhibit-a/191864.png","ImageObject",442,249,{"name":88,"@type":89},"Ethan Miller","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-02","2026-09-03",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",6,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is National Grid requesting permission to do in Winchester, MA?","Question",{"text":109,"@type":110},"National Grid requests the City Council’s consent for the location of gas mains and related structures in and under specified public streets and areas, including the digging and opening of ground to install the gas main extension on Pond Street.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"Where and how long is the proposed gas main extension?",{"text":114,"@type":110},"The proposed work extends approximately 370 feet on Pond Street, from the vicinity of #21 Pond Street toward Cambridge Street/3A, as part of a gas main replacement project.",{"name":116,"@type":107,"acceptedAnswer":117},"What conditions are applied to the work after engineering review?",{"text":118,"@type":110},"National Grid must coordinate with MassDOT’s reconstruction at the Pond and Cambridge Streets intersection, obtain and satisfy Street Opening Permit requirements, comply with utility protection and Dig Safe recording, and follow repair and relocation obligations at the applicant’s expense as needed.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},191864,1788411355,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":126,"read_time":76},687207017582,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","# PETITION OF NATIONAL GRID FOR GAS MAINLOC\n\n   \nTo the City Council of the Town of Winchester,MA:  \n   \n   \nThe National Grid hereby respectfully requests your consent to the locations of mains as hereinafterdescribed for the transmission and distribution of gas in and under the following pablic streets,lanes,highways,and places of  \nTown of Winchester and of the pipes,valves,governors,manholes and other structures,fixtures and appurtenances designed or intended to protect or operate said mains and accomplish the objectsof said Company;and the digging up and opening the ground to lay or place same:  \nEXTEND GAS MAIN 370FT ON POND ST FROM\\#21 POND ST TO CAMBRIDGE ST/3A AS PART OF GASMAIN REPLACEMENT PROJECT ON POND ST INCONJUNCTION WITH STATE ROAD WORK.  \nt  m  \nDATE:  \nMay 24,2016  \nBY:  \nChristopher Maher(Construction Supervisor)  \n# ORDER FORGAS MAINLOCATION\n\n   \nCity Council of the Town of Winchester,MA.  \n   \n   \nIt is HEREBY ORDERED that the location of the mains of the National Grid for the transmissionand distribution of gas in and under the public streets,lanes,highways,and places of the Town of Winchestersubstantially as described in the petition dated 05/24/2016,attached hereto and hereby made a part hereof,and of the pipes,valves,governors,manholes and other structures,fixtures and appurtenances designed orintended to protect or operate said mains and/or accomplish the objects of said Company,and the digging upand opening the ground to lay or place same,are hereby consented to and approved.  \nThe said National Grid shall comply with all applicable provisions of law and ordinances of the Townof Winchester to the enjoyment of said locations and rights.  \nDated this  \n9th  \nday of  \nMay  \n2016.  \n   \n   \nIhereby certify that the foregoing order was duly adopted by the City Council of the Townof Winchester,MA on2016.day of  \n   \n   \n   \n   \n   \nBY:.  \n   \nTitle  \nPLEASE RETURN ORIGINAL TONATIONAL GRID170 MEDFORD STMALDEN,MA 02155ATTENTION:   Chris Maher 617-839-5435  \nRETAIN DUPLICATE FOR YOUR RECORDS  \nTO:  \nRichard Howard,Town Manager  \nFROM:Beth Rudolph,PE.Town Engineer6  \nDATE:    June 1,2016  \nNational Grid Grant of Location Petition-Pond Street  \nRE:  \nThe Engineering Department has reviewed the National Grid Grant of Location petition toextend the existing four-inch plastic gas main approximately 370-feet on Pond Street,as shownon the plan dated May 24,2016.  \nThe Engineering Department and DPW have reviewed the plan and have no concerns regardingthe proposed location.However,the proposed work extends into the work zone for theMassDOT intersection reconstruction/traffic signal project at the corner of Pond and CambridgeStreets.National Grid will need to coordinate their work with MassDOT's contractor.Thefollowing conditions shall apply:  \n·National Grid shall coordinate their work with MassDOT's reconstruction project at theintersection of Pond and Cambridge Streets,which is currently on-going.  \n● The petitioner must meet and satisfy all conditions of Exhibit A(attached);  \n● The roadway shall be repaired to the specifications and standards of the EngineeringDepartment and DPW,as determined through the issuance of the Street Opening Permit;  \n● All town-owned utilities shall be relocated at the applicant's expense,as needed;  \n·All underground utilities shall be adequately protected;and  \n·The work shall be duly recorded with Dig Safe.  \ncc:  Jay Gill,DPW Director  \nAttachment:Exhibit A-Town of Winchester Grant of Location Requirements  \n## TOWN OF WINCHESTERGRANT OF LOCATION-EXHIBIT A\n\nGrantee(s)shall apply for and obtain a Street Opening Permit from the Winchester Departmentof Public Works,(781-721-7100).  \nSaid Grantee(s)and/or any sub-contractor employed by the grantee(s),shall indemnify and savethe Town harmless against all damages,costs and expense whatsoever to which the Town maybe subjected in consequence of the acts or neglect of said Grantee(s),its agents or servants,or inany manner arising from the r","cbCainMh2Zka7xj7","https://ap.wps.com/l/cbCainMh2Zka7xj7","pdf",456167,9,"English","# PETITION OF NATIONAL GRID FOR GAS MAINLOCATION\n# ORDER FOR GAS MAINLOCATION\n# TOWN OF WINCHESTER GRANT OF LOCATION - EXHIBIT A","[{\"question\":\"What is National Grid requesting permission to do in Winchester, MA?\",\"answer\":\"National Grid requests the City Council’s consent for the location of gas mains and related structures in and under specified public streets and areas, including the digging and opening of ground to install the gas main extension on Pond Street.\"},{\"question\":\"Where and how long is the proposed gas main extension?\",\"answer\":\"The proposed work extends approximately 370 feet on Pond Street, from the vicinity of #21 Pond Street toward Cambridge Street/3A, as part of a gas main replacement project.\"},{\"question\":\"What conditions are applied to the work after engineering review?\",\"answer\":\"National Grid must coordinate with MassDOT’s reconstruction at the Pond and Cambridge Streets intersection, obtain and satisfy Street Opening Permit requirements, comply with utility protection and Dig Safe recording, and follow repair and relocation obligations at the applicant’s expense as needed.\"}]","PETITION OF NATIONAL GRID FOR GAS MAINLOCATION - ORDER FOR GAS MAINLOCATION - GRANT OF LOCATION EXHIBIT A | PDF"]