[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-283295-105":53,"doc-detail-283295-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","payment-bill-of-sale-for-stored-materials-application-for-construction-manager","Payment Bill of Sale for Stored Materials - Application for Construction Manager","","Payment Bill of Sale form for stored materials submitted under a Construction Manager’s payment application. Captures project and material details including payment number, project name, location of materials (on-site or off-site), quantities, descriptions, and line values. Includes legal warranty language under standard general conditions confirming the lawful holder of title, freedom from restrictions, filings, or liens, and transfer authority to the Owner. Lists required attachments such as paid receipts or invoices, off-site storage access information, photo evidence, and insurance certificate, plus authorized signatures and dates.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":21,"@type":70,"position":76},"https://docshare.wps.com/template/invoices/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/payment-bill-of-sale-for-stored-materials-application-for-construction-manager/283295/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/payment-bill-of-sale-for-stored-materials-application-for-construction-manager/283295.png","ImageObject",442,249,{"name":88,"@type":89},"Himbo","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-17","2026-09-16",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",8,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What information must be provided for the stored materials bill of sale?","Question",{"text":109,"@type":110},"The form requires the payment number, project name, project number, location of materials (on-site or off-site), and a table with quantity, description, and line value.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What legal warranty does the Construction Manager provide in this form?",{"text":114,"@type":110},"The Construction Manager warrants that the Trade Contractor/Sub is the lawful holder of legal title evidenced by a paid receipt or invoice and can sell and transfer title without restrictions, filings, or liens.",{"name":116,"@type":107,"acceptedAnswer":117},"What attachments are required when materials are stored off-site?",{"text":118,"@type":110},"Provide storage area location address and contact information for owner access, photo evidence showing the material at the storage location with a legible packing slip or other identification, and a certificate of insurance covering replacement value with the Owner listed as an Additional Insured.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},283295,1790160126,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":20,"category_name":21,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":4},687197100911,"https://ap-avatar.wpscdn.com/avatar/a000239b6f1da00475?x-image-process=image/resize,m_fixed,w_180,h_180&k=1785132997149421697","ATTACHMENT TO CONSTRUCTION MANAGER’S APPLICATION FOR PAYMENT BILL OF SALE FOR STORED MATERIALS  \nApplication for  \nConstruction Manager:   Payment Number:    \nTrade Contractor/Sub:   Dated:    \nProject Name:   U-M Project No.:    \nLocation of Materials: □ On-Site □ Off-Site (Provide separate Bills of Sale for separate locations)  \nDESCRIPTION OF  \nMATERIALS  \n\n| QUANTITY | DESCRIPTION | LINE VALUE $ |\n| --- | --- | --- |\n|  |  |  |\n\n(Attach additional sheets as necessary)  \nIn accordance with Sections 9.6 and 9.7 of the Standard General Conditions for this project, the Construction Manager hereby warrants to the Regents of the University of Michigan (Owner) that the Trade Contractor/Sub is the lawful holder of the legal title to the above materials evidenced by a paid receipt or invoice giving it legal rights, power and authority to sell and transfer such title without restrictions, filings or liens of any kind on the part of any Supplier or Trade/Subcontractor. The Construction Manager, Trade Contractor, Subcontractor, Supplier, and/or any of their successors and assigns, warrant title to the above described materials to the Owner upon payment of this Application. The Construction Manager remains responsible to the Owner for all contractual requirements for the above listed materials including protection from any loss, damage or theft, complete installation and providing of all warranties.  \nAttachments (required):  \n□ Copies of paid receipts or invoice for Trade Contractor’s current legal interest in the above described materials.  \n□ If stored off-site, provide storage area location address and contact information for Owner’s access. Provide photo evidence of the material at the storage location including a legible photo of the packing slip or other positive identification to the satisfaction of the Owner.  \nStorage Address:    \n□ If stored off-site, certificate of insurance covering the replacement value of the material for any loss, damage or theft, with the Owner listed as an Additional Insured in accordance with Section 11.3.2 of the Standard General Conditions.  \nAuthorized Signatures:  \nConstruction Manager  \nDate  \nTrade Contractor / Sub  \nDate  \nPrinted Name  \nTitle  \nPrinted Name  \nTitle","cbCaih24xziyiK7o","https://ap.wps.com/l/cbCaih24xziyiK7o","pdf",147901,"English","# Application for Construction Manager\n## Materials and Project Details\n## Description of Materials\n## Attachments (Required)\n## Authorized Signatures","[{\"question\":\"What information must be provided for the stored materials bill of sale?\",\"answer\":\"The form requires the payment number, project name, project number, location of materials (on-site or off-site), and a table with quantity, description, and line value.\"},{\"question\":\"What legal warranty does the Construction Manager provide in this form?\",\"answer\":\"The Construction Manager warrants that the Trade Contractor/Sub is the lawful holder of legal title evidenced by a paid receipt or invoice and can sell and transfer title without restrictions, filings, or liens.\"},{\"question\":\"What attachments are required when materials are stored off-site?\",\"answer\":\"Provide storage area location address and contact information for owner access, photo evidence showing the material at the storage location with a legible packing slip or other identification, and a certificate of insurance covering replacement value with the Owner listed as an Additional Insured.\"}]","Payment Bill of Sale for Stored Materials - Application for Construction Manager | PDF",1789596380]