[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-165066-en":3,"doc-seo-165066-105":30,"detail-sidebar-cat-1-en-105":93},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":11,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},165066,687207022233,"Connor ","https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d",1,11,"Presentations","OPS0077A-PR01 - Temporary Equipment Procedure","Temporary Equipment Procedure defines requirements and step-by-step controls for transferring, inspecting, and operating temporary equipment between offshore locations. It establishes risk management and safety shutdown requirements, specifies constraints for hazardous (classified) areas and spacing, and aligns execution with BSEE requirements. The procedure includes documentation requirements and provides inspection tools/checklists, approval tags, continuous attendance rules, and log/temporary buildings checklists to ensure compliant monitoring and safe use.","Procedure\nTemporary Equipment\nDocument Suite Map\n1 Introduction\n2 Temporary Equipment Process Steps\nRequirements when transferring equipment between offshore locations (field to field transfer):\n3 Temporary Equipment Inspection\n4 Risk Management\n5 Safety Shutdown Requirements\n6 Hazardous (Classified) Areas and Spacing Requirements\n7 BSEE Requirements for Temporary Equipment\n8 Documentation Requirements\nTOOL OPS0077A-PR01-TO.01\nEngine-Driven Temporary Equipment Checklist\nNOTE:  Steps 1 and 2 must be complete before scheduling or commencement of any inspection/evaluation\nNOTE:\tEngine-driven equipment shall not be located in API Class 1, Div. 1 areas.\nTOOL OPS0077A-PR01-TO.02\nElectric Motor-Driven and Electrical Temporary Equipment Checklist\nNote:  Steps 1 and 2 must be complete before scheduling or commencement of any inspection/evaluation\nTOOL OPS0077A-PR01-TO.03\nTemporary Tank and Vessels Checklist*\nNote:  Steps 1 and 2 must be complete before scheduling or commencement of any inspection/evaluation\n*This checklist is intended for tanks containing flammable or combustible material (potential static ignition source) used for specialty purposes.  Excluded: tanks used for routine transport of materials (e.g. tote tanks, cutting boxes)\nTOOL OPS0077A-PR01-TO.04\nContinuous Attendance Checklist\nEquipment that is not approved to be operated in a hazardous (classified) area shall not be operated in hazardous (classified) areas as defined by the facilities area classification drawings and API RP 500.\nIf equipment not suitable for hazardous (classified) areas is installed within 40' of Class1 Div 2 area or within 50' of a potential leak source as defined in OPS0077A-PR01 Section 6.6 Classification of Potential Leak Sources, it must be monitored for excessive heat and fire per BSEE regulations or when equipment is not tied into location SSDS it shall be continuously attended according to the requirements of this checklist.\nTemporary equipment operations shall comply with the following checklist items.\nTOol OPS0077A-PR01-TO.05\nInspection Tags for Temporary Equipment\nAPPROVED Temporary Equipment\nFor use in UNCLASSIFIED Areas ONLY\nDate Tag Installed:\n____ / ____ / ______\nShell\nAll engines, pumps and compressors in hydrocarbon service will be monitored for excessive heat or fire by:\nLocation Name / Lease No.\n3rd Party Inspector Signature\nSAEP or AEP3 Signature\nOffshore Inspector Signature\nContinuous Attendance (attach Orange tag)\nOR\nFusible or Polyflow Loop Fire Detection\nWork Permit No.\nYellow Temporary Equipment Approval Tag – Approved for Use in Unclassified Areas\nAPPROVED Temporary Equipment\nShell\nDate Tag Installed:\n____ / ____ / ______\nEquipment to be used in:\nAll engines, pumps and compressors in hydrocarbon service will be monitored for excessive heat or fire by:\nOffshore Inspector Signature\nContinuous Attendance (attach Orange tag)\nSAEP or AEP3 Signature\nOR\nLocation Name / Lease No.\nFusible or Polyflow Loop Fire Detection\nWork Permit No.\n3rd Party Inspector Signature\nGreen Temporary Equipment Approval Tag – Approved for Use in Hazardous (Classified) Areas\nDate Tag Installed:\n____ / ____ / ______\nAPPROVED Temporary Equipment\nFor use in locations within 40' of a Class 1, Div. 2 area or within 50' of a potential leak source\nShell\nAll engines, pumps and compressors in hydrocarbon service will be monitored for excessive heat or fire by:\nSAEP or AEP3 Signature\n3rd Party Inspector Signature\nOffshore Inspector Signature\nLocation Name / Lease No.\nContinuous Attendance (attach Orange tag)\nWork Permit No.\nOR\nFusible or Polyflow Loop Fire Detection\nBlue Temporary Equipment Approval Tag –\nApproved for use in areas within 40' of a Class 1, Div. 2 area or within 50’ of a potential leak source\nCONTINUOUS ATTENDANCE REQUIRED\nDate Tag Installed:\n____ / ____ / ______\nShell\nEquipment to be used in:\nLocation Name / Lease No.\nSAEP or AEP3 Signature\n3rd Party Inspector Signature\nOffshore Inspector Signature\nClass 1, Div. 1, Group D\nUnclassified Area\nClass 1","cbCaikrgFBo0yc1w","https://ap.wps.com/l/cbCaikrgFBo0yc1w","docx",499161,68,"English","en",105,"# Introduction\n# Temporary Equipment Process Steps\n## Temporary Equipment Inspection\n## Risk Management\n## Safety Shutdown Requirements\n## Hazardous (Classified) Areas and Spacing Requirements\n## BSEE Requirements for Temporary Equipment\n## Documentation Requirements\n# Checklists and Tools\n## Engine-Driven Temporary Equipment Checklist\n## Electric Motor-Driven and Electrical Temporary Equipment Checklist\n## Temporary Tank and Vessels Checklist\n## Continuous Attendance Checklist\n## Inspection Tags for Temporary Equipment\n## Temporary Equipment Log\n## Temporary Buildings Checklist\n## Clarification of Requirements\n## Alarm and Detection Systems for All Occupied Buildings\n## Specific Requirements for Galley/Change Rooms/Laundry Buildings\n## Living Quarters/Berthing\n# Guidelines and References\n## Fusible Loop Plug Installation\n## Consolidating MOCs by Well/Construction Campaign\n## Temporary Equipment Quick Start Guide\n## Regulatory Affairs Temporary Production Equipment Alert\n## Glossary\n## References and Companion Documents","[{\"question\":\"What prerequisite steps must be completed before scheduling any inspection or evaluation?\",\"answer\":\"Steps 1 and 2 must be complete before scheduling or commencement of any inspection/evaluation.\"},{\"question\":\"Where is engine-driven equipment prohibited?\",\"answer\":\"Engine-driven equipment shall not be located in API Class 1, Div. 1 areas.\"},{\"question\":\"When is continuous attendance required for temporary equipment in hazardous areas?\",\"answer\":\"Equipment not suitable for hazardous (classified) areas installed within 40' of Class 1, Div. 2 or within 50' of a potential leak source must be monitored for excessive heat and fire per BSEE regulations, or continuously attended when not tied into location SSDS, according to the checklist.\"}]","OPS0077A-PR01 - Temporary Equipment Procedure | DOCX",1788165623,24,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":88,"head_meta":90,"extra_data":92,"updated_unix":28},"ops0077a-pr01-temporary-equipment-procedure","",{"@graph":36,"@context":87},[37,54,70],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/template/","Template",2,{"item":49,"name":13,"@type":43,"position":50},"https://docshare.wps.com/template/presentations/",3,{"item":52,"name":14,"@type":43,"position":53},"https://docshare.wps.com/template/ops0077a-pr01-temporary-equipment-procedure/165066/",4,{"url":52,"name":14,"@type":55,"author":56,"headline":14,"publisher":58,"fileFormat":61,"inLanguage":23,"description":15,"dateModified":62,"datePublished":63,"encodingFormat":61,"isAccessibleForFree":64,"interactionStatistic":65},"DigitalDocument",{"name":9,"@type":57},"Person",{"url":41,"name":59,"@type":60},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-05","2026-08-31",true,{"@type":66,"interactionType":67,"userInteractionCount":69},"InteractionCounter",{"@type":68},"ViewAction",5,{"@type":71,"mainEntity":72},"FAQPage",[73,79,83],{"name":74,"@type":75,"acceptedAnswer":76},"What prerequisite steps must be completed before scheduling any inspection or evaluation?","Question",{"text":77,"@type":78},"Steps 1 and 2 must be complete before scheduling or commencement of any inspection/evaluation.","Answer",{"name":80,"@type":75,"acceptedAnswer":81},"Where is engine-driven equipment prohibited?",{"text":82,"@type":78},"Engine-driven equipment shall not be located in API Class 1, Div. 1 areas.",{"name":84,"@type":75,"acceptedAnswer":85},"When is continuous attendance required for temporary equipment in hazardous areas?",{"text":86,"@type":78},"Equipment not suitable for hazardous (classified) areas installed within 40' of Class 1, Div. 2 or within 50' of a potential leak source must be monitored for excessive heat and fire per BSEE regulations, or continuously attended when not tied into location SSDS, according to the checklist.","https://schema.org",{"og:url":52,"og:type":89,"og:title":14,"og:site_name":59,"og:description":15},"article",{"robots":91,"canonical":52},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":94},[95,98,103,108,113,118,123,128,132],{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":96,"slug":97},90,"presentations",{"id":99,"doc_module":11,"doc_module_name":46,"category_name":100,"show_sort_weight":101,"slug":102},12,"Resumes",80,"resumes",{"id":104,"doc_module":11,"doc_module_name":46,"category_name":105,"show_sort_weight":106,"slug":107},14,"Invoices",70,"invoices",{"id":109,"doc_module":11,"doc_module_name":46,"category_name":110,"show_sort_weight":111,"slug":112},15,"Posters",60,"posters",{"id":114,"doc_module":11,"doc_module_name":46,"category_name":115,"show_sort_weight":116,"slug":117},16,"Social Media",50,"social-media",{"id":119,"doc_module":11,"doc_module_name":46,"category_name":120,"show_sort_weight":121,"slug":122},17,"Forms",40,"forms",{"id":124,"doc_module":11,"doc_module_name":46,"category_name":125,"show_sort_weight":126,"slug":127},18,"Letters",30,"letters",{"id":129,"doc_module":11,"doc_module_name":46,"category_name":130,"show_sort_weight":69,"slug":131},21,"Paper Templates","papers-templates",{"id":133,"doc_module":11,"doc_module_name":46,"category_name":134,"show_sort_weight":4,"slug":135},158,"General","general-158"]