[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-169235-en":3,"doc-seo-169235-105":30,"detail-sidebar-cat-1-en-105":92},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},169235,687207022233,"Connor ","https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d",1,11,"Presentations","Operations Plan Standard - Draft V1 - Date Range of Mission","Operations Plan Standard DRAFT V1 template for defining an Air Force–coordinated Civil Air Patrol mission. Establishes the mission’s general title, command information (ICP location and staffing), primary dates and times, potential pre-mission coordination and briefings, and any alternate dates. Includes NHQ funding reference, mission symbol, incident commander and project officer contact details, plus qualification and enrollment procedures. Outlines flight operations expectations, crew requirements, scheduling, and required subsections with “N/A” when not applicable.","Operations Plan Standard\nDRAFT V1\nName of Operation\nDate Range of Mission\nName, Rank, CAP\tName, Rank, USAF\nXXWG Director of Operations\tCAP-USAF Det X/CC\nCivil Air Patrol\tCivil Air Patrol – United States Air Force\nThis Ops Plan example outlines the standard format for all CAP Operations Plans.  All sections and subsections outlined in this standard are required, however “N/A” is an acceptable entry if required.  The Ops Plan needs to be fully coordinated through CAP-USAF prior to signature and needs to be signed before receiving Air Force Mission Approval in WMIRS, so be sure to coordinate the Ops Plan well enough in advance so as to not delay mission execution.  A repository of approved Ops Plans will be kept on XXXXXX (gocivilairpatrol.com/) for reference.\nTable of Contents:\nNumber\tPage\n\u0003\u0013 HYPERLINK \\l \"_TOC_250011\" \u0014General\t2\u0015\n\u0013 HYPERLINK \\l \"_TOC_250010\" \u0014Application\t3\u0015\n\u0013 HYPERLINK \\l \"_TOC_250009\" \u0014Flight Operations\t3\u0015\n\u0013 HYPERLINK \\l \"_TOC_250008\" \u0014Administration\t5\u0015\n\u0013 HYPERLINK \\l \"_TOC_250007\" \u0014Communications\t6\u0015\nCadet Participation\t6\n\u0013 HYPERLINK \\l \"_TOC_250006\" \u0014Safety\t6\u0015\nStaff Requirements\t7\nUniform Requirements\t7\n\u0013 HYPERLINK \\l \"_TOC_250004\" \u0014Facilities\t7\u0015\n\u0013 HYPERLINK \\l \"_TOC_250003\" \u001412.\tLogistics\t7\u0015\n\u0013 HYPERLINK \\l \"_TOC_250002\" \u0014Military Support Requirements\t7\u0015\n\u0013 HYPERLINK \\l \"_TOC_250001\" \u0014Public Affairs\t8\u0015\n\u0013 HYPERLINK \\l \"_TOC_250000\" \u0014Contingencies & Emergency Services Missions\t8\u0015\n\u0004\nGeneral\nGeneral Title (ex., VR-186 LLRS or RPA Escort)\nExample: The CT Wing (CTWG) of the Civil Air Patrol (CAP) will provide aerial reconnaissance of the CT coastal waters and surrounding infrastructure as specified in this Operation Plan (OPLAN). This is the Long Island Sound Patrol mission.\nThe Long Island Sound is a crucial economic artery between the NY Metropolitan Area and Southern New England. Over 8 million people live close to its shores. The shore infrastructure is complex – arterial highways, rail lines, power lines and bridges cross the densely populated area in both CT and NY. Nine (9) towered airports surround the LI Sound, including LaGuardia and JFK. New London / Groton CT is home to a major US Navy Submarine base, General Dynamics Submarine Plant, and the US Coast Guard Academy. Several passenger ferries cross the LI Sound daily. There are conventional shoreline power plants in Northport NY, Norwalk, Bridgeport, Milford and New Haven plus the Millstone nuclear power plant southeast of Niantic.\nIncident Command Post\nList the location of the ICP.  If none, then N/A.\nPrimary dates & times\nTwo to three sentences on the big events of the mission.  When is the mission?  Are there any pre-mission phone calls, briefings that aircrew/ground teams need to attend?\nExample:\nThe mission with be authorized to open on 21 May 2020 and close on 31 March 2021.\nPre-positioning flights will contact the IC for approval prior to movement, only the IC or designee may release a flight for this event.\nIncident Command Post staff briefing will be prior to each operational event. Mission will open for positioning of resources on 21 May 2020 and close on 31 March 2021.\nAlternate dates\nAs required.  If none, N/A\nNHQ funding \u000bThis mission is funded by XXXXX.\nMission Symbol XX\nProject Officer/Incident Commander\nCAP Incident Commander/Program Manager:\nName, Rank, CAP\nEmail: XXX\nPhone: XXX-XXX-XXXX (C)\nCAP Project Officer:\nName, Rank, CAP\nEmail: \u0013 HYPERLINK \"mailto:PaulBAlford@gmail.com\" \\h \u0014XXX\u0015\nPhone: XXX-XXX-XXXX (C)\nOther Contacts\nCAP Alternate IC:\nName, Rank, CAP\nEmail: \u0013 HYPERLINK \"mailto:PaulBAlford@gmail.com\" \\h \u0014XXX\u0015\nPhone: XXX-XXX-XXXX (C)\nApplication\nQualification requirements\nAdd all necessary qualification requirements.\nExample: Attendees shall be active CAP members with a valid CAP ID card in their possession, and present in a correctly worn CAP uniform. All members must have completed General Emergency Services and Basic ORM and have those noted in eService Operations Qualifications to participate in the event. Any member not having t","cbCailDmJzytBKbb","https://ap.wps.com/l/cbCailDmJzytBKbb","docx",535645,14,"English","en",105,"# General\n## Incident Command Post\n## Primary dates & times\n## Alternate dates\n# Application\n## Qualification requirements\n## Event capacity\n## Event enrollment procedures\n# Flight Operations\n## Aircrew Requirements\n## Operational schedule","[{\"question\":\"What sections are required in the Operations Plan standard template?\",\"answer\":\"All sections and subsections outlined in the standard are required. Entries marked “N/A” are acceptable when a section does not apply.\"},{\"question\":\"How should the primary dates and times be documented?\",\"answer\":\"Include two to three sentences describing the main mission events and when the mission is authorized to open and close. Add any pre-mission phone calls, briefings, or required attendance for aircrew/ground teams.\"},{\"question\":\"What is the process for coordinating the Ops Plan before approvals?\",\"answer\":\"The Ops Plan must be fully coordinated through CAP-USAF prior to signature and signed before receiving Air Force Mission Approval in WMIRS, so coordination should occur early enough to avoid delaying mission execution.\"}]","Operations Plan Standard - Draft V1 - Date Range of Mission | DOCX",1788248832,5,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":87,"head_meta":89,"extra_data":91,"updated_unix":28},"operations-plan-standard-draft-v1-date-range-of-mission","",{"@graph":36,"@context":86},[37,54,69],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/template/","Template",2,{"item":49,"name":13,"@type":43,"position":50},"https://docshare.wps.com/template/presentations/",3,{"item":52,"name":14,"@type":43,"position":53},"https://docshare.wps.com/template/operations-plan-standard-draft-v1-date-range-of-mission/169235/",4,{"url":52,"name":14,"@type":55,"author":56,"headline":14,"publisher":58,"fileFormat":61,"inLanguage":23,"description":15,"dateModified":62,"datePublished":63,"encodingFormat":61,"isAccessibleForFree":64,"interactionStatistic":65},"DigitalDocument",{"name":9,"@type":57},"Person",{"url":41,"name":59,"@type":60},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-04","2026-09-01",true,{"@type":66,"interactionType":67,"userInteractionCount":50},"InteractionCounter",{"@type":68},"ViewAction",{"@type":70,"mainEntity":71},"FAQPage",[72,78,82],{"name":73,"@type":74,"acceptedAnswer":75},"What sections are required in the Operations Plan standard template?","Question",{"text":76,"@type":77},"All sections and subsections outlined in the standard are required. Entries marked “N/A” are acceptable when a section does not apply.","Answer",{"name":79,"@type":74,"acceptedAnswer":80},"How should the primary dates and times be documented?",{"text":81,"@type":77},"Include two to three sentences describing the main mission events and when the mission is authorized to open and close. Add any pre-mission phone calls, briefings, or required attendance for aircrew/ground teams.",{"name":83,"@type":74,"acceptedAnswer":84},"What is the process for coordinating the Ops Plan before approvals?",{"text":85,"@type":77},"The Ops Plan must be fully coordinated through CAP-USAF prior to signature and signed before receiving Air Force Mission Approval in WMIRS, so coordination should occur early enough to avoid delaying mission execution.","https://schema.org",{"og:url":52,"og:type":88,"og:title":14,"og:site_name":59,"og:description":15},"article",{"robots":90,"canonical":52},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":93},[94,97,102,106,111,116,121,126,130],{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":95,"slug":96},90,"presentations",{"id":98,"doc_module":11,"doc_module_name":46,"category_name":99,"show_sort_weight":100,"slug":101},12,"Resumes",80,"resumes",{"id":21,"doc_module":11,"doc_module_name":46,"category_name":103,"show_sort_weight":104,"slug":105},"Invoices",70,"invoices",{"id":107,"doc_module":11,"doc_module_name":46,"category_name":108,"show_sort_weight":109,"slug":110},15,"Posters",60,"posters",{"id":112,"doc_module":11,"doc_module_name":46,"category_name":113,"show_sort_weight":114,"slug":115},16,"Social Media",50,"social-media",{"id":117,"doc_module":11,"doc_module_name":46,"category_name":118,"show_sort_weight":119,"slug":120},17,"Forms",40,"forms",{"id":122,"doc_module":11,"doc_module_name":46,"category_name":123,"show_sort_weight":124,"slug":125},18,"Letters",30,"letters",{"id":127,"doc_module":11,"doc_module_name":46,"category_name":128,"show_sort_weight":29,"slug":129},21,"Paper Templates","papers-templates",{"id":131,"doc_module":11,"doc_module_name":46,"category_name":132,"show_sort_weight":4,"slug":133},158,"General","general-158"]