[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-242776-105":53,"doc-detail-242776-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","oed-propath-release-notes-may-2010-release-4","OED ProPath - Release Notes - May 2010 - Release 4","","OED ProPath release notes summarize updates across project, product, and support life cycle processes. The document highlights consolidation of review guides into a single guide covering Peer, Formal, Quality, and Go/No Go reviews, including icon changes to star symbols. It also describes process map adjustments aligned to PMAS, enhancements to Release Management and Project Monitoring and Control with new templates and checklists, and modifications across planning, architecture evaluation, documentation, design, launch, and build workflows, including reporting structure refinements.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":46,"@type":70,"position":76},"https://docshare.wps.com/template/paper-templates/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/oed-propath-release-notes-may-2010-release-4/242776/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/oed-propath-release-notes-may-2010-release-4/242776.png","ImageObject",442,249,{"name":88,"@type":89},"Pentious","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-09-29","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":79},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What major review-related change does this release introduce?","Question",{"text":108,"@type":109},"ProPath replaces multiple separate review guides with one consolidated review guide covering Peer, Formal, Quality, and Go/No Go reviews, and updates the icons to star symbols with identifiers for each review type.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"How does the release align ProPath with the PMAS framework?",{"text":113,"@type":109},"It augments process maps with PMAS-related activities, including modifications to role and activity names/descriptions to better match the Project Management Accountability System requirements.",{"name":115,"@type":106,"acceptedAnswer":116},"Which areas receive new templates and checklists in this release?",{"text":117,"@type":109},"Release Management and Project Monitoring and Control are augmented with PMAS-related activities and new artifacts such as operational acceptance and independent review materials, along with additional formal review checklists and signature approval form templates in architecture evaluation and design/documentation updates.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},242776,1790245551,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":45,"category_name":46,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":79,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":73},1374404730887,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","| \u003Cbr>\u003Cbr>OED ProPath\u003Cbr>\u003Cbr>\u003Cbr>|  |\n| --- | --- |\n| Project Life Cycle Processes  Project Planning (PRP)\u003Cbr> Project Launch (PRL)\u003Cbr> Project Closure (PRC)\u003Cbr> Project Monitoring and Control (PMC)  Monthly Reporting Templates (RPM)  Quarterly Reporting Templates (RPQ)  Yearly Reporting Templates (RPY)  Ad Hoc Reporting Templates (RPA)\u003Cbr>OED ProPath Links  Getting Started\u003Cbr> Release Notes\u003Cbr> ProPath Change Request (PCR) | Product Development Life Cycle Processes  Requirements Elaboration (RQE)\u003Cbr> Product Architecture (ARC)\u003Cbr> Architecture Evaluation (AEV)\u003Cbr> Product Design (DES)\u003Cbr> Design Evaluation (DEV)\u003Cbr> Test Preparation (TST)\u003Cbr> Product Build (BLD)\u003Cbr> Product Documentation (DOC)\u003Cbr> Test and Certification (TAC)\u003Cbr> Release Management (REL)\u003Cbr> Product Support (SUP) |\n\nRelease 4 May 2010  \nOED ProPath R04-U00 May 2010  \nOED ProPath  \nLegend  \n home  \nGeneral Navigation  \n Click to access activity description  Navigate within a process map  \n Click to access artifact template  Navigate back one level/page  \n Click to access standards/guides  Navigate to next level/page  \n Click to access process maps  \nReviews Specific Navigation  \n Click to access Peer Review map  \n Click to access Formal Review map  \n Click to access Process Quality Gate Review map  Click to access Go / No Go Review (Milestone) map  \nCommon Process Map Icons  Process Map Start  \n Activity Wait/Merge  \n Process Map End  \nOED ProPath R04-U00 May 2010  \nOED ProPath  \nRelease Notes  \n home  \nReviews: ProPath has replaced several disparate and individual review guides with a single consolidated review guide to cover Peer, Formal, Quality and Go/No Go Reviews. In addition, the icons throughout ProPath to indicate these various types of reviews have been changed to star symbols with various colors and identifiers to delineate each review type.  \nProcess maps: In general various role names, activity names, and activity descriptions in multiple processes have been updated to better align ProPath with Project Management Accountability System (PMAS) .  \nSpecific changes to process maps are as follows:  \nRelease Management (REL): Augmented with PMAS related activities to support Increment Acceptance and included required artifacts in support of the Go/No Go Testing and Release Checklist. New activities have been added to ProPath while others have been revised. The following new artifacts have been added:  \n• Operational Acceptance Plan Template  \n• Product Support Account Maintenance Guide  \n• Product Support Approval Template  \n• Product Support Release of Products and Patches Guide  \n• Product Support Software Distribution Directories Guide  \n• VA OI&T EIE Release Profile Template  \n more  \nOED ProPath R04-U00 May 2010  \nOED ProPath  \nRelease Notes  \n home  \nProject Monitoring and Control (PMC): Augmented with PMAS related activities that support Independent Reviews. This includes modification to existing activities and new artifacts including:  \n􀂟 Independent Review Checklist (Coming Soon!)  \n􀂟 Independent Review Summary Template (Coming Soon!)  \n􀂟 Recommendation to CIO Template  \n􀂟 CIO Decision Memorandum Template  \nProject Planning (PRP): Modified the activity ‘Create Project Schedule’ to include the link for the Universal Project Milestone (UPM) Document and added a new template to document approval of the Project Schedule (per PMAS requirement) . The activity‘Ensure Technical Alignment’ was renamed to ‘Create System Design Document’ and added the option to produce the Software Design Document for Legacy Vista Systems (M-Code) in lieu of the System Design Document.  \nArchitecture Evaluation (AEV): Updates to the process include a new formal review and two new artifact templates:  \n􀂟 Formal Review Checklist  \n􀂟 Signature Approval Form Template  \nOED ProPath R04-U00  \n back  more  \nMay 2010  \nOED ProPath  \nRelease Notes  \n home  \nProduct Documentation (DOC): Updates to the process include three new artifact templates:  \n􀂟 Operations and Maintenance Pla","cbCaimIkIq7iEbLj","https://ap.wps.com/l/cbCaimIkIq7iEbLj","pdf",267327,6,"English","# Release Notes\n## Reviews\n## Process maps and PMAS alignment\n## Release Management and supporting artifacts\n## Project Monitoring and Control\n## Project Planning and Architecture Evaluation\n## Product Documentation, Design, and Build\n## Reporting templates","[{\"question\":\"What major review-related change does this release introduce?\",\"answer\":\"ProPath replaces multiple separate review guides with one consolidated review guide covering Peer, Formal, Quality, and Go/No Go reviews, and updates the icons to star symbols with identifiers for each review type.\"},{\"question\":\"How does the release align ProPath with the PMAS framework?\",\"answer\":\"It augments process maps with PMAS-related activities, including modifications to role and activity names/descriptions to better match the Project Management Accountability System requirements.\"},{\"question\":\"Which areas receive new templates and checklists in this release?\",\"answer\":\"Release Management and Project Monitoring and Control are augmented with PMAS-related activities and new artifacts such as operational acceptance and independent review materials, along with additional formal review checklists and signature approval form templates in architecture evaluation and design/documentation updates.\"}]","OED ProPath - Release Notes - May 2010 - Release 4 | PDF",1789194629]