[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-244743-105":53,"doc-detail-244743-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","nu-umop-template-special-project-procedures-mop-template","NU UMOP Template - Special Project Procedures - MOP Template","","Template for documenting an NU UMOP operating procedure within a specified facility. Captures location, duration, revision and MOP date, scope description, work areas/buildings, and electrical equipment/information. Includes impact evaluation tables for critical electrical and systems such as emergency generators, cooling, ventilation, UPS, power distribution, EPO, fire detection/suppression, SCADA, DDC controls, security, power/lighting, fuel, and IT equipment. Provides references, safety and building risks, role-based procedural steps, back-out procedures for utility power loss and OSHA recordable injury, and an acknowledgement section with signatures and notes.",{"@graph":63,"@context":123},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/nu-umop-template-special-project-procedures-mop-template/244743/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/nu-umop-template-special-project-procedures-mop-template/244743.png","ImageObject",442,249,{"name":88,"@type":89},"Maeve","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-22","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",7,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115,119],{"name":106,"@type":107,"acceptedAnswer":108},"What information does the UMOP template capture at the beginning?","Question",{"text":109,"@type":110},"It records location, duration, start/end dates, revision and MOP date, scope description, and work areas/buildings, along with electrical equipment and related information.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"Which critical systems are covered in the impact checklist?",{"text":114,"@type":110},"The template includes emergency generator systems, critical cooling and ventilation, UPS and power distribution, EPO, fire detection and suppression, SCADA monitoring, DDC controls, security, general power and lighting, fuel systems, and IT equipment.",{"name":116,"@type":107,"acceptedAnswer":117},"What does the back-out procedure require for utility power loss?",{"text":118,"@type":110},"It instructs stopping the procedure immediately, notifying the NU technician, securing areas, determining the outage cause, safely turning off non-terminated cables, and noting the last completed step when power went out.",{"name":120,"@type":107,"acceptedAnswer":121},"How is acknowledgement of the MOP documented?",{"text":122,"@type":110},"It requires names, titles, and dates for designated parties (e.g., contractor foreman and NU project manager/technicians), plus signature and an exceptions/notes section confirming completion and verification.","https://schema.org",{"og:url":78,"og:type":125,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":127,"canonical":78},"index,follow",{"doc_id":129,"site_id":56},244743,1789221435,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":88,"user_avatar":134,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":140,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":61,"update_tm":130,"read_time":9},5909877438554,"https://ap-avatar.wpscdn.com/avatar/5600025385ad2bf12a7?_k=1778553567797529272","| UMOP\u003Cbr>Number and Title |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n| Location | Technological Institute, Northwestern University, Evanston, IL |  |  |  |  |\n| Duration |  | Start Date |  | End Date |  |\n| Revision |  | MOP Date: |  |  |  |\n| Scope Description |  |  |  |  |  |\n| Work Areas and/or Buildings |  |  |  |  |  |\n| Electrical Equipment\u003Cbr>Information | • |  |  |  |  |\n\n\n| Impact of UMOP on Critical Facility |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| Electrical or System | Yes |  |  | No |  | N/A |  |  | Diagrams/Sketches | Comments/Notes |\n|  |  |  |  |  |  |  |  |  |  |  |\n| Electrical Utility Equipment | |  |  | |  | |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |\n| Emergency Generator System | |  |  | |  | |  |  |  |  |\n| Critical Cooling System | |  |  | |  | |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |\n| Ventilation System | |  |  | |  | |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |\n| Critical Ventilation System | |  |  | |  | |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |\n| UPS System | |  |  | |  | |  |  |  |  |\n| Critical Power Distribution System | |  |  | |  | |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |\n| EPO System | |  |  | |  | |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |\n| Fire Detection System | |  |  | |  | |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |\n| Fire Suppression System (Chemical) | |  |  | |  | |  |  |  |  |\n| Fire Sprinkler System (Wet) | |  |  | |  | |  |  |  |  |\n| SCADA Monitoring System |  | |  | |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |\n| Control System (DDC) | |  |  | |  | |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |\n| Security System |  |  |  | |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |\n| General Power and Lighting System | |  |  | |  | |  |  |  |  |\n| Fuel Systems |  | |  | |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |\n| IT Equipment | |  |  | |  | |  |  |  |  |\n\n\n| References |  |\n| --- | --- |\n| Requirements / Notifications |  |\n| Safety\u003Cbr>Requirements |  |\n| Safety Risks |  |\n| Building Risks |  |\n\n\n|  |  | Responsible Party |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  | Preliminary Procedure (Day Prior): 3/9/17 | EC | NU\u003Cbr>PM | ComED | EV\u003Cbr>DDC | EV\u003Cbr>ENG | EV\u003Cbr>ELEC | EV\u003Cbr>Lock | NU\u003Cbr>IT | ELEV\u003Cbr>PM |\n|  | 1. |  |  |  |  |  |  |  |  |  |\n|  | 2. |  |  |  |  |  |  |  |  |  |\n|  | 3. |  |  |  |  |  |  |  |  |  |\n|  | 4. |  |  |  |  |  |  |  |  |  |\n|  | 5. |  |  |  |  |  |  |  |  |  |\n\n\n|  |  |  |  | Responsible Party |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  | Procedure: 3/10/17 | Estimated\u003Cbr>Duration | Drawing | EC | NU\u003Cbr>PM | ComED | EV\u003Cbr>DDC | EV\u003Cbr>ENG | EV\u003Cbr>ELEC | EV\u003Cbr>Lock | NU\u003Cbr>IT | ELEV\u003Cbr>PM |\n|  | 1. |  |  |  |  |  |  |  |  |  |  |  |\n|  | 2. |  |  |  |  |  |  |  |  |  |  |  |\n|  | 3. |  |  |  |  |  |  |  |  |  |  |  |\n|  | 4. |  |  |  |  |  |  |  |  |  |  |  |\n|  | 5. |  |  |  |  |  |  |  |  |  |  |  |\n|  | 6. |  |  |  |  |  |  |  |  |  |  |  |\n|  | 7. |  |  |  |  |  |  |  |  |  |  |  |\n|  | 8. . |  |  |  |  |  |  |  |  |  |  |  |\n|  | 9. |  |  |  |  |  |  |  |  |  |  |  |\n|  | 10. |  |  |  |  |  |  |  |  |  |  |  |\n|  | 11. |  |  |  |  |  |  |  |  |  |  |  |\n|  | 12. |  |  |  |  |  |  |  |  |  |  |  |\n|  | 13. |  |  |  |  |  |  |  |  |  |  |  |\n|  | 14. |  |  |  |  |  |  |  |  |  |  |  |\n\n\n| Back Out Procedure | In the event of utility power loss:\u003Cbr>1. Stop procedure immediately. Notify NU Technician.\u003Cbr>2. Safe all areas and determine cause of outage.\u003Cbr>3. Safe off all non-terminated cables.\u003Cbr>4. Note last step completed when power went out.\u003Cbr>In the event of an OSHA recordable injury:\u003Cbr>5. Call 911.\u003Cbr>6. Investigate and document required OSHA Injury and Illness information.\u003Cbr>7. Finish procedure at last step completed when utility power is available.\u003Cbr>If nomenclature and tags does not match equ","cbCaijQ7dXK0il96","https://ap.wps.com/l/cbCaijQ7dXK0il96","pdf",301134,"English","# UMOP Overview\n## Electrical Equipment Information\n# Impact on Critical Facility\n## Critical Electrical and Systems Checklist\n# References and Safety\n# Role-Based Procedures\n## Preliminary Procedure (Day Prior)\n## Procedure (During the Day)\n# Back Out Procedure\n## Utility Power Loss\n## OSHA Recordable Injury\n# Acknowledgement of MOP","[{\"question\":\"What information does the UMOP template capture at the beginning?\",\"answer\":\"It records location, duration, start/end dates, revision and MOP date, scope description, and work areas/buildings, along with electrical equipment and related information.\"},{\"question\":\"Which critical systems are covered in the impact checklist?\",\"answer\":\"The template includes emergency generator systems, critical cooling and ventilation, UPS and power distribution, EPO, fire detection and suppression, SCADA monitoring, DDC controls, security, general power and lighting, fuel systems, and IT equipment.\"},{\"question\":\"What does the back-out procedure require for utility power loss?\",\"answer\":\"It instructs stopping the procedure immediately, notifying the NU technician, securing areas, determining the outage cause, safely turning off non-terminated cables, and noting the last completed step when power went out.\"},{\"question\":\"How is acknowledgement of the MOP documented?\",\"answer\":\"It requires names, titles, and dates for designated parties (e.g., contractor foreman and NU project manager/technicians), plus signature and an exceptions/notes section confirming completion and verification.\"}]","NU UMOP Template - Special Project Procedures - MOP Template | PDF"]