[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-165521-en":3,"doc-seo-165521-105":30,"detail-sidebar-cat-1-en-105":90},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},165521,962084931830,"Jacob","https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd",1,18,"Letters","NSR Permit - 9079M1 - Statement of Basis","NSR Permit Statement of Basis documents a Regular-New permit action for the MV 400 TPH Astec HMA hot mix asphalt plant operated by Mesa Verde Enterprises, permit number 9079M1. The basis describes the facility process, co-location with a Toro Rock aggregate crushing and screening plant, and the emission source evaluation using single-source analysis. It covers PSD/minor-source determinations, public response received from 23 citizens, compliance/enforcement notes, and modeling assumptions and conditions concluding no air quality standard exceedances.","Statement of Basis - Narrative\nNSR Permit\nType of Permit Action:  \tRegular-New\nFacility:\tMV 400 TPH Astec HMA Plant\nCompany:\tMesa Verde Enterprises\nPermit No(s).:\t9079M1\nTempo/IDEA ID No.:\t39845 - PRN20240001\nPermit Writer:\tJoseph Mashburn\nFee Tracking (not required for Title V)\nPlant Process Description:\nThe function of the facility is to produce hot mix asphalt.  The 400 tph hot mix asphalt plant will  include: aggregate/RAP storage piles, a 5-bin cold aggregate feeder, scalping screen, pug mill, mineral filler silo with screw conveyor and baghouse, drum dryer/mixer with baghouse, incline conveyor, asphalt silo, asphalt heater, six (6) transfer conveyors, Evotherm storage tank, and two (2) asphalt cement storage tanks.\nThe HMA plant will be co-located with GCP-2-3269 aggregate crushing and screening plant operated by Toro Rock Products, LLC.  Toro Rock will be providing the aggregate used in the MV 400 TPH Astec HMA Plant asphalt mix.\nDescription of this Modification:\nThis is a new facility.\nSource Determination:\n1. The emission sources evaluated include: Hot Mix Asphalt Plant and co-located Toro Rock GCP2 Aggregate Crushing and Screening plant.\n2. Single Source Analysis:\nSIC Code: Do the facilities belong to the same industrial grouping (i.e., same two-digit SIC code grouping, or support activity)? No. The Aggregate Crushing and Screening plant has a different SIC Code.\nCommon Ownership or Control: Are the facilities under common ownership or control? No\nContiguous or Adjacent:  Are the facilities located on one or more contiguous or adjacent properties? Yes\n3. Is the source, as described in the application, the entire source for 20.2.70, 20.2.72, 20.2.73, or 20.2.74 NMAC applicability purposes?  Yes\nPSD Applicability:\nThe source, as determined in 3.0 above, is a minor source before and after this modification.\n.\nPublic Response/Concerns: As of March 8, 2024, or the issuance date of this permit, this permit writer has received public comment from 23 citizens.\nStartup and Shutdown:\nIf applicable, did the applicant indicate that a startup, shutdown, and emergency operational plan was developed in accordance with 20.2.70.300.D(5)(g) NMAC? N/A\nIf applicable, did the applicant indicate that a malfunction, startup, or shutdown operational plan was developed in accordance with 20.2.72.203.A.5 NMAC? Yes\nDid the applicant indicate that a startup, shutdown, and scheduled maintenance plan was developed and implemented in accordance with 20.2.7.14.A and B NMAC? Yes\nDoes the facility have emissions due to routine or predictable startup, shutdown, and maintenance? No. If so, have all emissions from startup, shutdown, and scheduled maintenance operations been permitted? No, the permittee states:  No SSM emissions are predicted for this permit application.  All control systems will be operational prior to the start or shutdown of asphalt production or aggregate processing.  Maintenance will be performed during period with no production.\nCompliance and Enforcement Status [Title V and NSR/PSD new or modification. Use this email \u0013 HYPERLINK \"file:///\\\\\\\\Aurora\\\\aqb\\\\AQB-Permits-Section\\\\Title-V\\\\Forms\\\\COMPLIANCE%20ENFORCEMENT%20EMAIL%20TEMPLATES\\\\Compliance%20verification%20request%205-13-13.oft\" \u0014template\u0015:\nThis is a new facility.\nAlso, per 2/7/2024 email from Alejandra Avila in the Enforcement Section, “No enforcement action for that Facility in our database.”\nModeling:   Sahil Kassanjee performed the modeling review.  The following is from his report, dated 5/15/2024:\nModeling Assumptions:\nThe facility may operate in a year starting from February till the end of November, 10 hours in a day,\nanytime of a day. There are no restrictions of operations during daylight or night hours.\nPermit Conditions:\nThe facility may operate during a calendar year starting from February 1st till November 30th, 10\nhours in a day, anytime of a day. There are no restrictions of operations in operating during daylight\nor night hours. The facility may operate up ","cbCaisgy1KveVLL1","https://ap.wps.com/l/cbCaisgy1KveVLL1","docx",46370,8,"English","en",105,"# Statement of Basis - Narrative\n## Permit Identification\n## Facility and Modification Description\n## Source Determination and PSD Applicability\n## Public Response and Concerns\n## Startup, Shutdown, and Compliance Status\n## Modeling Review and Permit Conditions","[{\"question\":\"What facility and permit action does this Statement of Basis cover?\",\"answer\":\"It covers a Regular-New NSR permit for the MV 400 TPH Astec HMA hot mix asphalt plant under permit number 9079M1.\"},{\"question\":\"How were emission sources evaluated in the source determination?\",\"answer\":\"The evaluation includes the Hot Mix Asphalt Plant and the co-located Toro Rock GCP2 Aggregate Crushing and Screening plant, with single-source analysis addressing industrial grouping, ownership/control, and property adjacency.\"},{\"question\":\"What is the modeling conclusion and what standards were considered?\",\"answer\":\"Modeling shows operation does not cause or contribute to exceedances of applicable air quality standards, including relevant NAAQS/NMAAQS and PSD increments for NO2 and PM10, with asphalt fume concentrations remaining below required thresholds.\"}]","NSR Permit - 9079M1 - Statement of Basis | DOCX",1788173006,3,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":85,"head_meta":87,"extra_data":89,"updated_unix":28},"nsr-permit-9079m1-statement-of-basis","",{"@graph":36,"@context":84},[37,53,67],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,50],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/template/","Template",2,{"item":49,"name":13,"@type":43,"position":29},"https://docshare.wps.com/template/letters/",{"item":51,"name":14,"@type":43,"position":52},"https://docshare.wps.com/template/nsr-permit-9079m1-statement-of-basis/165521/",4,{"url":51,"name":14,"@type":54,"author":55,"headline":14,"publisher":57,"fileFormat":60,"inLanguage":23,"description":15,"dateModified":61,"datePublished":61,"encodingFormat":60,"isAccessibleForFree":62,"interactionStatistic":63},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":41,"name":58,"@type":59},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-08-31",true,{"@type":64,"interactionType":65,"userInteractionCount":4},"InteractionCounter",{"@type":66},"ViewAction",{"@type":68,"mainEntity":69},"FAQPage",[70,76,80],{"name":71,"@type":72,"acceptedAnswer":73},"What facility and permit action does this Statement of Basis cover?","Question",{"text":74,"@type":75},"It covers a Regular-New NSR permit for the MV 400 TPH Astec HMA hot mix asphalt plant under permit number 9079M1.","Answer",{"name":77,"@type":72,"acceptedAnswer":78},"How were emission sources evaluated in the source determination?",{"text":79,"@type":75},"The evaluation includes the Hot Mix Asphalt Plant and the co-located Toro Rock GCP2 Aggregate Crushing and Screening plant, with single-source analysis addressing industrial grouping, ownership/control, and property adjacency.",{"name":81,"@type":72,"acceptedAnswer":82},"What is the modeling conclusion and what standards were considered?",{"text":83,"@type":75},"Modeling shows operation does not cause or contribute to exceedances of applicable air quality standards, including relevant NAAQS/NMAAQS and PSD increments for NO2 and PM10, with asphalt fume concentrations remaining below required thresholds.","https://schema.org",{"og:url":51,"og:type":86,"og:title":14,"og:site_name":58,"og:description":15},"article",{"robots":88,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":91},[92,97,102,107,112,117,122,125,130],{"id":93,"doc_module":11,"doc_module_name":46,"category_name":94,"show_sort_weight":95,"slug":96},11,"Presentations",90,"presentations",{"id":98,"doc_module":11,"doc_module_name":46,"category_name":99,"show_sort_weight":100,"slug":101},12,"Resumes",80,"resumes",{"id":103,"doc_module":11,"doc_module_name":46,"category_name":104,"show_sort_weight":105,"slug":106},14,"Invoices",70,"invoices",{"id":108,"doc_module":11,"doc_module_name":46,"category_name":109,"show_sort_weight":110,"slug":111},15,"Posters",60,"posters",{"id":113,"doc_module":11,"doc_module_name":46,"category_name":114,"show_sort_weight":115,"slug":116},16,"Social Media",50,"social-media",{"id":118,"doc_module":11,"doc_module_name":46,"category_name":119,"show_sort_weight":120,"slug":121},17,"Forms",40,"forms",{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":123,"slug":124},30,"letters",{"id":126,"doc_module":11,"doc_module_name":46,"category_name":127,"show_sort_weight":128,"slug":129},21,"Paper Templates",5,"papers-templates",{"id":131,"doc_module":11,"doc_module_name":46,"category_name":132,"show_sort_weight":4,"slug":133},158,"General","general-158"]