[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243031-105":53,"doc-detail-243031-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","non-binding-demand-indication-for-incremental-capacity-template-july-2019","Non-Binding Demand Indication for Incremental Capacity Template - July 2019","","Non-binding demand indication template for incremental capacity within the gas transmission incremental process, aligned with NI Network Gas Transmission Code section 4.2 and the ENTSOG template. It authorizes the receiving transmission system operator to share shipper-provided data with other TSOs to assess market and system demand. The template defines key dates for submission and publication, specifies required NBDI information (adjacent entry-exit systems, capacity type, gas-year quantities, linked submissions, and conditions), and includes company and procedural fee details, including a £25,000 fee subject to reimbursement or guarantee terms.",{"@graph":63,"@context":122},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/non-binding-demand-indication-for-incremental-capacity-template-july-2019/243031/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/non-binding-demand-indication-for-incremental-capacity-template-july-2019/243031.png","ImageObject",442,249,{"name":88,"@type":89},"Blaney","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-09-26","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":79},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114,118],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of the Non-Binding Demand Indication (NBDI) template?","Question",{"text":108,"@type":109},"It enables shippers to submit non-binding demand indications so TSOs can assess demand for incremental capacity in the overall system and market area.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What are the key submission and publication dates for the 2019 market demand assessment process?",{"text":113,"@type":109},"The NBDI window opens on 1 July 2019 and closes on 26 August 2019. The market demand assessment report is published to industry no later than 21 October 2019.",{"name":115,"@type":106,"acceptedAnswer":116},"What information must a shipper provide when submitting NBDIs?",{"text":117,"@type":109},"Submission must include adjacent entry-exit systems, the relevant capacity type, incremental capacity demand per gas year(s), any linked indications submitted to other TSOs, and detailed conditions if applicable.",{"name":119,"@type":106,"acceptedAnswer":120},"Is there a fee for submitting an NBDI and how is it handled?",{"text":121,"@type":109},"A fee may be charged after submission. The template states the fee is £25,000 payable at submission time, and it will be reimbursed or accounted as a guarantee if the economic test is positive for at least one offer level that includes incremental capacity at the respective interconnection point.","https://schema.org",{"og:url":78,"og:type":124,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":126,"canonical":78},"index,follow",{"doc_id":128,"site_id":56},243031,1790372190,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":88,"user_avatar":133,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":79,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":139,"language":140,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":61,"update_tm":144,"read_time":76},1236954677761,"https://us-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","Non-Binding Demand Indication for Incremental Capacity Template  \nJuly 2019  \nBy filling out this form, the Shipper agrees that the document including all data from the Shipper, can be shared by the receiving Transmission System Operator with other Transmission System Operators for assessing the demand for incremental capacity in the overall system/market area.  \n1. Background  \nThe incremental process foresees several phases including certain requirements that need to be fulfilled, before an incremental project can be initiated and new capacity be built.  \nThe incremental process starts with the demand assessment phase that begins with the market demand assessment by the Transmission System Operators (TSOs) after the annual yearly capacity auction. GMO NI will administer this phase of the process on behalf of Premier Transmission Limited in respect of the Moffat Interconnection Point and GNI(UK) Limited in respect of the South North Interconnection Point. At the beginning of this phase Shippers can submit Non-Binding Demand Indications (NBDIs) within eight weeks after the start of the annual yearly capacity auction.  \nShippers can also submit their NBDIs after this deadline. In this case, the relevant TSO can decide, if the indication can be included in the ongoing demand assessment or if it will be used in the next assessment.  \nThis document has been prepared in accordance with section 4.2 of the NI Network Gas Transmission Code and is based on the ENTSOG template. This temple should be used by Shippers for sending non-binding demand indications for incremental capacity to the respective TSO(s) according to Article 26 of Regulation (EU) 2017/459 .  \n2. Key Dates  \nThe key dates for the Market Demand Assessment Process are as follows:  \n\n| Activity | Dates |\n| --- | --- |\n| Non-binding Demand Indication Window Open | 1st July 2019 |\n| Non-binding Demand Indication Window Closed | 26th August 2019 |\n| Market Demand Assessment Report published to Industry | No later than 21st October 2019 |\n\n3. Non-binding demand indications  \nFor submitting NBDIs for incremental capacity according to the process described in Article 26.8 of Regulation (EU) 2017/459 please provide the following information:  \n(1) The adjacent entry-exit systems between which your company expresses demand for incremental capacity.  \n(2) Which type of capacity your demand applies (further details to be provided in case of restricted/conditional capacity) .  \n(3) Your company´s incremental capacity demand per gas year(s) between the adjacent entry-exit systems (one row = one amount of requested capacity) .  \n(4) Any demand indications which have been or will also be submitted to other transmission system operators, in case such indications are linked to your indication here.  \n(5) In detail, any conditions with respect to your demand indications above, if applicable (like e.g. demand for incremental capacity along a route with more than two adjacent entry-exit systems involved, demand for removal of existing restrictions, etc. ) .  \nPlease fill in all information requested under the points (1) to (5) in the table below.  \n\n| 1 |  | 2 |  | 3 |  | 4 | 5 |\n| --- | --- | --- | --- | --- | --- | --- | --- |\n| From\u003Cbr>[entry-exit system name]\u003Cbr>“EXIT CAPACITY” | To\u003Cbr>[entry-exit system name]\u003Cbr>“ENTRY CAPACITY” | Type*\u003Cbr>of “EXIT CAPACITY” | Type*\u003Cbr>of„ENTRY CAPACITY“ | Gas year/s\u003Cbr>[yyyy/yyyy+1] | Amount\u003Cbr>(kWh/d)/y | Request is submitted to other TSOs\u003Cbr>[yes, TSO] or [no](detailed information shall be provided below) | Conditions |\n| … |  |  |  |  |  |  |  |\n| … |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n\n*E.g. in case of not-freely allocable capacities the specified exit or entry point(s) or entry-exit zone to which the allocation restriction applies.  \nElaboration of conditions  \n4. Company details  \nPlease provide in the fields below contact information of your company as well as the representative(s) who can be contacted reg","cbCaimbNPDWNXZAn","https://ap.wps.com/l/cbCaimbNPDWNXZAn","pdf",192452,7,"English","# Background\n# Key Dates\n# Non-binding demand indications\n## Company details\n## Procedural information and fees","[{\"question\":\"What is the purpose of the Non-Binding Demand Indication (NBDI) template?\",\"answer\":\"It enables shippers to submit non-binding demand indications so TSOs can assess demand for incremental capacity in the overall system and market area.\"},{\"question\":\"What are the key submission and publication dates for the 2019 market demand assessment process?\",\"answer\":\"The NBDI window opens on 1 July 2019 and closes on 26 August 2019. The market demand assessment report is published to industry no later than 21 October 2019.\"},{\"question\":\"What information must a shipper provide when submitting NBDIs?\",\"answer\":\"Submission must include adjacent entry-exit systems, the relevant capacity type, incremental capacity demand per gas year(s), any linked indications submitted to other TSOs, and detailed conditions if applicable.\"},{\"question\":\"Is there a fee for submitting an NBDI and how is it handled?\",\"answer\":\"A fee may be charged after submission. The template states the fee is £25,000 payable at submission time, and it will be reimbursed or accounted as a guarantee if the economic test is positive for at least one offer level that includes incremental capacity at the respective interconnection point.\"}]","Non-Binding Demand Indication for Incremental Capacity Template - July 2019 | PDF",1789198744]