[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-242625-105":53,"doc-detail-242625-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","ni-wsa-progress-tracker-phirst-connect-recommendations-v12-may26","NI WSA Progress Tracker - PHIRST Connect recommendations - V1.2 - May26","","NI WSA Progress Tracker template for capturing obesity whole systems approach (WSA) progress and learning through iterative phase-by-phase implementation. It links Phase & aim, key steps and tips, NI owner-assigned actions, further information on flexibility between PHA and EA sites, and supporting PHE guide resources. It also prompts local communication, public/PLE engagement, stakeholder identification, adaptation of resources for NI contexts, and additional resource needs, alongside notes/feedback for new sites and continuous improvement.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/ni-wsa-progress-tracker-phirst-connect-recommendations-v12-may26/242625/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/ni-wsa-progress-tracker-phirst-connect-recommendations-v12-may26/242625.png","ImageObject",442,249,{"name":88,"@type":89},"Aditya","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-11","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":9},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What does the NI WSA Progress Tracker capture during WSA implementation?","Question",{"text":108,"@type":109},"It captures progress and learning, not only completion of steps, and encourages revisiting earlier phases because WSA is iterative.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"How does the tracker connect phases to PHIRST Connect recommendations?",{"text":113,"@type":109},"Each phase includes associated recommendations via hyperlinks, with key steps and tips and clear NI owner-assigned actions to enable implementation.",{"name":115,"@type":106,"acceptedAnswer":116},"What activities are expected in Phase 1 Set Up?",{"text":117,"@type":109},"Phase 1 focuses on securing senior-level support, establishing governance and a core working team, setting up resources, securing senior stakeholder accountability, and embedding objectives within community planning.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},242625,1791736040,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":79,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":141},962085564549,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","PHA Whole Systems Approach to Obesity Local Progress Reports  \nNI WSA Progress Tracker: PHIRST Connect recommendations  \nGreen = PHIRST Connect adaptations  \nNote to user: This tool includes hyperlinks to a separate document authored by researchers from PHIRST Connect. It contains detailed recommendations that were produced as part of a process evaluation of the implementation of the WSA to obesity in NI.  \nThis tracker captures progress and learning, not just step completion; WSA is iterative-expect to revisit earlier steps.  \nPlease add more tips to phases and steps as PHA/sites see fit. This document is a template demonstrating how some PHIRST Connect recommendations could be actioned, if PHA/sites feel they are appropriate. Adaptation to fit the needs of PHA. EA sites and beyond is encouraged and expected.  \n\n| Example WSA to Obesity Progress Report |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| Phase & aim\u003Cbr>and estimated timeframe\u003Cbr>(With hyperlinks to associated recommendations) | Key Steps and tips | Progress and actions\u003Cbr>(with NI owner assigned to complete actions) | Further information\u003Cbr>(add details of flexibility allowances agreed between PHA and EA site) | PHE Guide associated\u003Cbr>resources\u003Cbr>(including adapted resources) | Additional resources\u003Cbr>(e.g. things the site/PHA identify as required to facilitate implementation now or in future e.g. human resource, expertise, software etc.) | Notes/feedback and learning for new sites |\n| Pre-set up | 1. PHA to ensure readiness | NI Owner: | • See P. 29 of | NA | • Initial WSA training |  |\n| considerations | for implementation\u003Cbr>a. Outline resource & capacity needs |  | guidance for suggested human |  | and devise ongoing training schedule (see examples below) |  |\n| Associated | b. Outline expectations, |  | resource |  | • Admin support |  |\n| recommendations: | agree flexibility, communication and |  | requirements\u003Cbr>and P. 37 for |  | • PPI expertise/access and/or training or |  |\n\n\n| R2a, R2b, R2c, R2d,\u003Cbr>R3a, R3b, R4a,\u003Cbr>R5a, R5b, R5c, R5e,\u003Cbr>R5f, R6a, R6b, L1a, L1b,\u003Cbr>L3a, L3b, L3d\u003Cbr>L5a, L5b. | how to capture learning\u003Cbr>c. Outline & ensure access to key resources\u003Cbr>d. Connect to EA sites for advice (e.g. shared learning network)\u003Cbr>e. ID additional resource needs & problem solve\u003Cbr>f. Familiarisation with\u003Cbr>PHE guidance and resources\u003Cbr>2. Create local communication plan & agree language\u003Cbr>3. Create public/PLE engagement plan to allow engagement from Phase 1\u003Cbr>4. Identify relevant stakeholders & how roles relate to WSA\u003Cbr>5. Check and adapt PHE resources for NI regional & local contexts and stakeholders.\u003Cbr>6. Consider seeking data profile report from PHA Health Intelligence team before Phase 2 to help obtain support in phase 1, step 1. |  | ‘Additional preparation’.\u003Cbr>• See P. 14 of guidance for benefits of a WSA that include community assets as well as Pp. 23-26 which outline systems behaviours and how they require involvement of local communities and P. 34 ‘Understanding communities’\u003Cbr>• See P. 25 of guidance for information on\u003Cbr>communication mechanisms |  | guidance for staff on PPI\u003Cbr>• WSA for obesity resource library/repository\u003Cbr>• Expertise in Arc GIS\u003Cbr>• Project management tools (this document) etc.\u003Cbr>• Regional communication strategy |  |\n| --- | --- | --- | --- | --- | --- | --- |\n\n\n| Phase 1 Set Up\u003Cbr>(approx . 3\u003Cbr>months based on ideal estimates)\u003Cbr>Secures senior – level support and establishes the necessary governance and resource structure to implement the approach\u003Cbr>Associated\u003Cbr>recommendations:\u003Cbr>R5a, R5c, R6b, L1a, L1b. | 1. Engage with senior leaders obtain their support\u003Cbr>Tips:\u003Cbr>• Seek existing slide decks from PHA to help explain the WSAto senior leaders and that outcomes will take a long time to develop.\u003Cbr>• Identify and share how senior roles relate/will benefit from the WSA, especially if not in health.\u003Cbr>• Cite involvement of ROPIG and PHA to demonstrate commitment/support.\u003Cbr>• Creati","cbCaim1dURL94iFd","https://ap.wps.com/l/cbCaim1dURL94iFd","pdf",280015,20,"English","# NI WSA Progress Tracker: PHIRST Connect recommendations\n## Example WSA to Obesity Progress Report\n## Phase 1 Set Up (approx. 3 months)\n## Pre-set up considerations","[{\"question\":\"What does the NI WSA Progress Tracker capture during WSA implementation?\",\"answer\":\"It captures progress and learning, not only completion of steps, and encourages revisiting earlier phases because WSA is iterative.\"},{\"question\":\"How does the tracker connect phases to PHIRST Connect recommendations?\",\"answer\":\"Each phase includes associated recommendations via hyperlinks, with key steps and tips and clear NI owner-assigned actions to enable implementation.\"},{\"question\":\"What activities are expected in Phase 1 Set Up?\",\"answer\":\"Phase 1 focuses on securing senior-level support, establishing governance and a core working team, setting up resources, securing senior stakeholder accountability, and embedding objectives within community planning.\"}]","NI WSA Progress Tracker - PHIRST Connect recommendations - V1.2 - May26 | PDF",1789192880,7]