[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243060-105":53,"doc-detail-243060-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","ng-2020-dsip-update-2020-distributed-system-implementation-plan-update","NG 2020 DSIP Update - 2020 Distributed System Implementation Plan Update","","Submission letter and supporting materials for Niagara Mohawk Power Corporation d/b/a National Grid’s 2020 Distributed System Implementation Plan (DSIP) Update. The filing responds to New York State Public Service Commission orders requiring an individual DSIP on a biennial basis, and includes an executive summary plus detailed DSIP topical sections covering integrated planning, advanced forecasting, grid operations, storage, electric vehicles, energy efficiency, data platforms, customer data, cybersecurity, DER interconnections, advanced metering, hosting capacity, and non-wires alternatives, with additional governance, marginal cost, and benefit-cost study information.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/ng-2020-dsip-update-2020-distributed-system-implementation-plan-update/243060/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/ng-2020-dsip-update-2020-distributed-system-implementation-plan-update/243060.png","ImageObject",442,249,{"name":88,"@type":89},"Oliver","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-19","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",6,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the purpose of the 2020 DSIP Update filing?","Question",{"text":109,"@type":110},"The filing submits National Grid’s 2020 DSIP Update in accordance with the Commission’s orders directing the company to file an individual DSIP on a biennial basis.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"Which major topic areas are covered in the DSIP Update?",{"text":114,"@type":110},"The DSIP Update includes integrated planning, advanced forecasting, grid operations, energy storage, electric vehicle integration, energy efficiency innovation, data topics, cybersecurity, DER interconnections, advanced metering, hosting capacity, and non-wires alternatives.",{"name":116,"@type":107,"acceptedAnswer":117},"Who is the primary legal and contact point for the submission?",{"text":118,"@type":110},"The letter is submitted by Janet M. Audunson, P.E., Esq., Assistant General Counsel, with Wajiha A. Mahmoud listed as a director-level contact for questions regarding the filing.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},243060,1790186129,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":142},8796095461610,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Janet M. Audunson, P.E., Esq.  \nAssistant General Counsel  \nJune 30, 2020  \nVIA ELECTRONIC DELIVERY  \nHonorable Michelle L. Phillips Secretary  \nNew York State Public Service Commission  \nThree Empire State Plaza, 19th Floor Albany, New York 12223-1350  \nRE: Case 14-M-0101 – Proceeding on Motion of the Commission in Regard to Reforming the Energy Vision  \nCase 16-M-0411 – In the Matter of Distributed System Implementation Plans  \nNIAGARA MOHAWK POWER CORPORATION d/b/a NATIONAL GRID  \n– 2020 DISTRIBUTED SYSTEM IMPLEMENTATION PLAN (“DSIP”) UPDATE  \nDear Secretary Phillips:  \nNiagara Mohawk Power Corporation d/b/a National Grid (“National Grid” or the“Company”) hereby submits its 2020 DSIP Update in accordance with the Commission’s April 20, 2016 Order Adopting Distributed System Implementation Plan Guidance in Cases 14-M- 0101 and 16-M-0411 directing the Company to file an individual DSIP on a biennial basis.  \nPlease direct any questions regarding this filing to:  \nWajiha A. Mahmoud  \nDirector, Grid Modernization Solutions  \nNational Grid  \n300 Erie Boulevard West  \nSyracuse, New York 13202  \nTel.: 315-428-6127  \nMobile: 315-751-8251  \nEmail:  [Wajiha.Mahmoud@nationalgrid.com](Wajiha.Mahmoud@nationalgrid.com)  \n300 Erie Blvd. West, A-4, Syracuse, New York 13202  \nT: 315/428-3411 􀂄 M: 315/436-4002 􀂄 [Janet.Audunson@nationalgrid.com](Janet.Audunson@nationalgrid.com) 􀂄 [www.nationalgrid.com](www.nationalgrid.com)  \nHon. Michelle L. Phillips, Secretary  \nCases 14-M-0101/16-M-0411 – National Grid 2020 DSIP Update June 30, 2020  \nPage 2 of 2  \nThank you.  \nRespectfully submitted,/s/ Janet M. Audunson  \nJanet M. Audunson, P.E., Esq. Assistant General Counsel  \nEnc.  \ncc: Carol Sedewitz, w/enclosure (via electronic mail)  \nWajiha Mahmoud, w/enclosure (via electronic mail)  \nDavid Lovelady, w/enclosure (via electronic mail)  \nCathy Hughto-Delzer, w/enclosure (via electronic mail)  \nNational Grid  \nDistributed System Implementation Plan Update  \nof  \nNiagara Mohawk Power Corporation d/b/a National Grid  \nCase 16-M-0411  \nDSIP Proceeding  \nJune 30, 2020  \nTable of Contents  \nExecutive Summary............................................................................................................................1  \n Progressing the Distributed System Platform...............................................................................6  \n DSIP Update Topical Sections ....................................................................................................20  \n2.1 Integrated Planning..................................................................................................................... 21  \n2.2 Advanced Forecasting ................................................................................................................. 28  \n2.3 Grid Operations........................................................................................................................... 38  \n2.4 Energy Storage Integration ......................................................................................................... 47  \n2.5 Electric Vehicle Integration ......................................................................................................... 55  \n2.6 Energy Efficiency Integration and Innovation............................................................................. 70  \n2.7 Distribution System Data ............................................................................................................ 78  \n2.8 Customer Data ............................................................................................................................ 83  \n2.9 Cybersecurity .............................................................................................................................. 91  \n2.10 DER Interconnections.................................................................................................................. 94  \n2.11 Advanced Metering Infrastructure ..............","cbCaileouUCSJYWd","https://ap.wps.com/l/cbCaileouUCSJYWd","pdf",3971292,232,"English","# Executive Summary\n# Progressing the Distributed System Platform\n# DSIP Update Topical Sections\n## Integrated Planning\n## Advanced Forecasting\n## Grid Operations\n## Energy Storage Integration\n## Electric Vehicle Integration\n## Energy Efficiency Integration and Innovation\n## Distribution System Data\n## Customer Data\n## Cybersecurity\n## DER Interconnections\n## Advanced Metering Infrastructure\n## Hosting Capacity\n## Beneficial Locations for DERs and Non-Wires Alternatives\n## Procuring Non-Wires Alternatives\n# Other DSIP Information\n## DSIP Governance\n## Marginal Cost of Service Study\n## Benefit-Cost Analysis\n# Appendix A: Tools and Information Sources\n# Appendix B: Additional Topic Details","[{\"question\":\"What is the purpose of the 2020 DSIP Update filing?\",\"answer\":\"The filing submits National Grid’s 2020 DSIP Update in accordance with the Commission’s orders directing the company to file an individual DSIP on a biennial basis.\"},{\"question\":\"Which major topic areas are covered in the DSIP Update?\",\"answer\":\"The DSIP Update includes integrated planning, advanced forecasting, grid operations, energy storage, electric vehicle integration, energy efficiency innovation, data topics, cybersecurity, DER interconnections, advanced metering, hosting capacity, and non-wires alternatives.\"},{\"question\":\"Who is the primary legal and contact point for the submission?\",\"answer\":\"The letter is submitted by Janet M. Audunson, P.E., Esq., Assistant General Counsel, with Wajiha A. Mahmoud listed as a director-level contact for questions regarding the filing.\"}]","NG 2020 DSIP Update - 2020 Distributed System Implementation Plan Update | PDF",1789199192,81]