[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-174013-en":3,"doc-seo-174013-105":31,"detail-sidebar-cat-1-en-105":92},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":21,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":22,"language":23,"language_code":24,"site_id":25,"html_lang":24,"table_of_contents":26,"faqs":27,"seo_title":28,"seo_description":15,"update_tm":29,"read_time":30},174013,962084925782,"Chloe Bennett","https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc",1,18,"Letters","NFSA Delivery Deed - Producer Delivery Requirements","NFSA Delivery Deed sets the legal framework under which producers deliver audiovisual production materials to the National Film and Sound Archive of Australia after Screen Australia library and sales functions transferred in 2011. The deed explains that, following VicScreen’s approved funding, the producer must complete and deliver specified materials within agreed timelines. It provides key drafting fields, governs delivery obligations, representations, warranties, governing law, notices, and includes production specifications and relevant address schedules.","NFSA DELIVERY DEED\nCOVER NOTE TO PRODUCERS\nBackground:\nOn 1 July 2011, Screen Australia’s library and sales functions were transferred under legislation to the National Film and Sound Archive of Australia (NFSA).\nConsistent with this transfer, producers contract with the NFSA, instead of Screen Australia, to deliver audio visual production materials to the NFSA. This requirement also extends to other state-based screen funding agencies including VicScreen.\nDrafting instructions:\nOn receipt from VicScreen, producers must populate this Deed in accordance with the following key:\n[1]\tProducer company name\n[2]\tProducer ABN\n[3]\tProducer principal business address\n[4]\tProducer email address\n[5]\tName of person to receive notices for the producer\n[6]\tTitle\n[7]\tProduction Type (eg  Feature, TV Drama, Documentary, Short etc)\n[8]\tDuration (e.g. 3 x 26 minutes)\n[9]\tOne Line Synopsis\n[10]\tScheduled date for completion of the Production as specified in the Funding Agreement\n[11]\tScheduled date for delivering Material to the NFSA\nOnce the Deed has been populated with the above information, producers should sign, witness and date the Deed then scan and email the entire Deed (without this cover page) to the NFSA at the Relevant Address (see Schedule 2 of the Deed).\nUnless any changes are required, the NFSA will email the producer to confirm its acceptance of the deed as executed by the producer and copy its response to VicScreen at the following address:\n\u0013 HYPERLINK \"mailto:productiondelivery@vicscreen.vic.gov.au\" \u0014productiondelivery@vicscreen.vic.gov.au\u0015\nAs this document will give rise to legally binding obligations, please read it carefully\nand consult your legal advisor before signing.\nDelivery Deed\nbetween\nNational Film and Sound Archive of Australia\nABN: 41 251 017 588\nand\n\u0013 FORMTEXT \u0014[1]\u0015 Pty Limited\nABN: \u0013 FORMTEXT \u0014[2]\u0015\nAgreement No: \u003CNFSA …>\nCONTENTS\n\u0013 TOC \\o \"1-2\" \\u \u0014BACKGROUND\t\u0013 PAGEREF _Toc441764060 \\h \u00143\u0015\n1.          DEFINITIONS AND INTERPRETATION\t\u0013 PAGEREF _Toc441764061 \\h \u00143\u0015\n1.1  \tDefinitions\t\u0013 PAGEREF _Toc441764062 \\h \u00143\u0015\n1.2\tInterpretation\t\u0013 PAGEREF _Toc441764063 \\h \u00144\u0015\n2.         DELIVERY TO THE NFSA\t\u0013 PAGEREF _Toc441764064 \\h \u00145\u0015\n3.         \tPRODUCER REPRESENTATIONS AND WARRANTIES\t\u0013 PAGEREF _Toc441764065 \\h \u00145\u0015\n4.         \tGOVERNING LAW\t\u0013 PAGEREF _Toc441764066 \\h \u00145\u0015\n5.         \tFURTHER ASSURANCES\t\u0013 PAGEREF _Toc441764067 \\h \u00145\u0015\n6. \tSEVERABILITY\t\u0013 PAGEREF _Toc441764068 \\h \u00145\u0015\n7.\tCOSTS\t\u0013 PAGEREF _Toc441764069 \\h \u00145\u0015\n8.\tNOTICES\t\u0013 PAGEREF _Toc441764070 \\h \u00146\u0015\n9.\tENTIRE AGREEMENT\t\u0013 PAGEREF _Toc441764071 \\h \u00146\u0015\n10.\tAMENDMENTS OR VARIATION\t\u0013 PAGEREF _Toc441764072 \\h \u00146\u0015\n11.\tWAIVER\t\u0013 PAGEREF _Toc441764073 \\h \u00146\u0015\n12.\tNON-MERGER\t\u0013 PAGEREF _Toc441764074 \\h \u00146\u0015\nSCHEDULE 1 – PRODUCTION SPECIFICATIONS\t\u0013 PAGEREF _Toc441764076 \\h \u00148\u0015\nSCHEDULE 2 -  RELEVANT ADDRESS\t\u0013 PAGEREF _Toc441764078 \\h \u00149\u0015\nSCHEDULE 3 -  NFSA DELIVERY MATERIALS\t\u0013 PAGEREF _Toc441764080 \\h \u001410\u0015\nATTACHMENT A - STATEMENT OF TECHNICAL & PRODUCTION DETAILS\t\u0013 PAGEREF _Toc441764081 \\h \u001412\u0015\n\u0015\nDEED BETWEEN:\n1.\tNATIONAL FILM AND SOUND ARCHIVE OF AUSTRALIA (ABN 41 251 017 588) of McCoy Circuit, Acton, Australian Capital Territory, a Commonwealth statutory authority established under the Act (NFSA); and\n2.\t\u0013 FORMTEXT \u0014[1]\u0015 PTY LIMITED (ABN \u0013 FORMTEXT \u0014[2]\u0015) with its principal office at \u0013 FORMTEXT \u0014[3]\u0015 (Producer).\nBACKGROUND\u0013 TC \"BACKGROUND\"\\L1 \u0015\nA.\tVicScreen has approved funding for the Production and the Producer is the exclusive licensee of the rights to market the Production as that term is defined in the Funding Agreement.\nB.\tThe NFSA collects, preserves and makes available Australia’s audiovisual collection.\nC.\tIn accordance with the Funding Agreement, the Producer has agreed to enter into this Deed and to deliver the Delivery Materials to the NFSA on the terms set out in this Deed.\nTHE PARTIES AGREE as follows:\n1.          DEFINITIONS AND INTERPRETATION\u0013 TC \"1.\tDEFINITIONS AND INTERPRETATION\"\\L1 \u0015\n1.1  \tDefinitions\u0013 TC \"1.1\tDefinitions\"\\L2 \u0015\nIn this Deed:\nAct means the Natio","cbCaim1uvZjRDxvb","https://ap.wps.com/l/cbCaim1uvZjRDxvb","docx",105007,2,13,"English","en",105,"# Background\n# Delivery Deed Instructions\n## Producer Drafting Instructions\n## Signing, Witnessing, and Emailing\n# Deed Structure\n## Definitions and Interpretation\n## Delivery to the NFSA\n## Producer Representations and Warranties\n## Governing Law\n## Further Assurances\n## Severability\n## Costs\n## Notices\n## Entire Agreement\n## Amendments or Variation\n## Waiver\n## Non-Merger\n# Schedules\n## Schedule 1 – Production Specifications\n## Schedule 2 – Relevant Address\n## Schedule 3 – NFSA Delivery Materials\n## Attachment A – Statement of Technical & Production Details","[{\"question\":\"What is the purpose of the NFSA Delivery Deed?\",\"answer\":\"It formalizes the obligations for producers to deliver audiovisual production materials to the NFSA under terms aligned with VicScreen funding arrangements.\"},{\"question\":\"What information must producers fill in when drafting the deed?\",\"answer\":\"Producers must populate key fields including producer company name, ABN, principal business address, email address, notice recipient, title, production type, duration, one-line synopsis, completion date, and delivery date to the NFSA.\"},{\"question\":\"How should the deed be submitted after being completed?\",\"answer\":\"After signing, witnessing, and dating, producers must scan and email the deed (excluding the cover page) to the NFSA at the relevant address referenced in Schedule 2.\"}]","NFSA Delivery Deed - Producer Delivery Requirements | DOCX",1788309277,5,{"code":4,"msg":32,"data":33},"ok",{"site_id":25,"language":24,"slug":34,"title":14,"keywords":35,"description":15,"schema_data":36,"social_meta":87,"head_meta":89,"extra_data":91,"updated_unix":29},"nfsa-delivery-deed-producer-delivery-requirements","",{"@graph":37,"@context":86},[38,54,69],{"@type":39,"itemListElement":40},"BreadcrumbList",[41,45,48,51],{"item":42,"name":43,"@type":44,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":46,"name":47,"@type":44,"position":21},"https://docshare.wps.com/template/","Template",{"item":49,"name":13,"@type":44,"position":50},"https://docshare.wps.com/template/letters/",3,{"item":52,"name":14,"@type":44,"position":53},"https://docshare.wps.com/template/nfsa-delivery-deed-producer-delivery-requirements/174013/",4,{"url":52,"name":14,"@type":55,"author":56,"headline":14,"publisher":58,"fileFormat":61,"inLanguage":24,"description":15,"dateModified":62,"datePublished":63,"encodingFormat":61,"isAccessibleForFree":64,"interactionStatistic":65},"DigitalDocument",{"name":9,"@type":57},"Person",{"url":42,"name":59,"@type":60},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-05","2026-09-02",true,{"@type":66,"interactionType":67,"userInteractionCount":21},"InteractionCounter",{"@type":68},"ViewAction",{"@type":70,"mainEntity":71},"FAQPage",[72,78,82],{"name":73,"@type":74,"acceptedAnswer":75},"What is the purpose of the NFSA Delivery Deed?","Question",{"text":76,"@type":77},"It formalizes the obligations for producers to deliver audiovisual production materials to the NFSA under terms aligned with VicScreen funding arrangements.","Answer",{"name":79,"@type":74,"acceptedAnswer":80},"What information must producers fill in when drafting the deed?",{"text":81,"@type":77},"Producers must populate key fields including producer company name, ABN, principal business address, email address, notice recipient, title, production type, duration, one-line synopsis, completion date, and delivery date to the NFSA.",{"name":83,"@type":74,"acceptedAnswer":84},"How should the deed be submitted after being completed?",{"text":85,"@type":77},"After signing, witnessing, and dating, producers must scan and email the deed (excluding the cover page) to the NFSA at the relevant address referenced in Schedule 2.","https://schema.org",{"og:url":52,"og:type":88,"og:title":14,"og:site_name":59,"og:description":15},"article",{"robots":90,"canonical":52},"index,follow",{"doc_id":7,"site_id":25},{"code":4,"msg":5,"data":93},[94,99,104,109,114,119,124,127,131],{"id":95,"doc_module":11,"doc_module_name":47,"category_name":96,"show_sort_weight":97,"slug":98},11,"Presentations",90,"presentations",{"id":100,"doc_module":11,"doc_module_name":47,"category_name":101,"show_sort_weight":102,"slug":103},12,"Resumes",80,"resumes",{"id":105,"doc_module":11,"doc_module_name":47,"category_name":106,"show_sort_weight":107,"slug":108},14,"Invoices",70,"invoices",{"id":110,"doc_module":11,"doc_module_name":47,"category_name":111,"show_sort_weight":112,"slug":113},15,"Posters",60,"posters",{"id":115,"doc_module":11,"doc_module_name":47,"category_name":116,"show_sort_weight":117,"slug":118},16,"Social Media",50,"social-media",{"id":120,"doc_module":11,"doc_module_name":47,"category_name":121,"show_sort_weight":122,"slug":123},17,"Forms",40,"forms",{"id":12,"doc_module":11,"doc_module_name":47,"category_name":13,"show_sort_weight":125,"slug":126},30,"letters",{"id":128,"doc_module":11,"doc_module_name":47,"category_name":129,"show_sort_weight":30,"slug":130},21,"Paper Templates","papers-templates",{"id":132,"doc_module":11,"doc_module_name":47,"category_name":133,"show_sort_weight":4,"slug":134},158,"General","general-158"]