[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-241090-105":53,"doc-detail-241090-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","new-home-checklist-template-final-walkthrough","New Home Checklist Template - Final Walkthrough","","A structured new home inspection checklist designed to guide a final walkthrough before closing. It organizes tasks by key areas including heating and cooling, electrical, plumbing, ceilings/walls/floors, doors, windows, kitchen, baths, exterior spaces, attic and basement, and garage. The template emphasizes allowing time between inspection and closure, addressing and documenting issues, testing functionality, and confirming safety and proper drainage.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/new-home-checklist-template-final-walkthrough/241090/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/new-home-checklist-template-final-walkthrough/241090.png","ImageObject",442,249,{"name":88,"@type":89},"Xiajie","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-22","2026-09-11",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",9,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the purpose of this new home checklist template?","Question",{"text":109,"@type":110},"It provides an organized task list for completing a final walkthrough inspection across major home systems and rooms before closing. The checklist helps ensure issues are identified, addressed, and documented.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How should you plan timing before the final walkthrough?",{"text":114,"@type":110},"Allow several days between inspection and closing. This creates enough time to fix issues and verify corrections before finalizing the move.",{"name":116,"@type":107,"acceptedAnswer":117},"Which areas does the checklist cover during inspection?",{"text":118,"@type":110},"It covers heating and cooling, electrical, plumbing, ceilings/walls/floors, doors, windows, kitchen, bath, exterior areas, attic and basement, and garage/additional structures.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},241090,1791109665,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":47,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":73},8814010472675,"https://avatar.qwps.com/avatar/WGlhamll","NEW HOME CHECKLIST TEMPLATE  \n| LOCATION | PREPARED BY | DATE |\n| --- | --- | --- |\n|  |  |  |\n\n\n| THINGS TO REMEMBER FOR FINAL WALKTHROUGH |  |  |\n| --- | --- | --- |\n|  | TASK / ITEM | ADDITIONAL INFO |\n|  | ALLOW SEVERAL DAYS BETWEEN INSPECTION AND CLOSING |  |\n|  | MAKE SURE ALL ISSUES ARE ADDRESSED AND FIXED |  |\n|  | DO NOT RUSH! |  |\n|  | GET IT IN WRITING |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n\n\n| HEATING & COOLING |  |  |\n| --- | --- | --- |\n|  | TASK / ITEM | ADDITIONAL INFO |\n|  | RAISE AND LOWER THERMOSTAT TO ENSURE PROPER FUNCTION |  |\n|  | CHECK ALL VENTS / RADIATORS FOR PROPER FUNCTION |  |\n|  | ALLOW HEAT TO RUN AND SHUT OFF AUTOMATICALLY |  |\n|  | ALLOW A/C TO RUN AND SHUT OFF AUTOMATICALLY |  |\n|  | LOCATE COLD AIR RETURNS. CHECK FOR PROPER PLACEMENT |  |\n|  |  |  |\n|  |  |  |\n\n\n| ELECTRICAL |  |  |\n| --- | --- | --- |\n|  | TASK / ITEM | ADDITIONAL INFO |\n|  | TURN ON AND OFF ALL SWITCHES AND FIXTURES |  |\n|  | PLUG A RADIO OR LAMP INTO EACH OUTLET |  |\n|  | TEST DOORBELL |  |\n|  | CHECK THAT HEAVY DUTY LINES EXIST WHERE NEEDED |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n\n\n| PLUMBING |  |  |\n| --- | --- | --- |\n|  | TASK / ITEM | ADDITIONAL INFO |\n|  | TURN ON AND OFF ALL FAUCETS |  |\n|  | ALLOW WATER TO RUN FOR SEVERAL MINUTES |  |\n|  | CHECK DRAINAGE IN EACH BASIN |  |\n|  | CHECK FOR LEAKS AND DRIPS |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n\n\n| CEILINGS, WALLS, AND FLOORS |  |  |\n| --- | --- | --- |\n|  | TASK / ITEM | ADDITIONAL INFO |\n|  | INSPECT ALL FINISHES FOR COLOR AND QUALITY |  |\n|  | INSPECT DRYWALL FOR SEEMS, NAILS, CRACKS, AND HOLES |  |\n|  | INSPECT MOLDINGS FOR QUALITY AND GAPS |  |\n|  | INSPECT ALL TILING FOR MISSING GROUT, CRACKS, AND CHIPS |  |\n|  | CHECK FOR SCUFFS AND SCRATCHES |  |\n|  | ENSURE CARPETING IS FREE OF RIPPLES AND TEARS |  |\n|  | LOOK AT ALL CEILINGS FOR SIGNS CRACKS OR MOISTURE |  |\n|  |  |  |\n|  |  |  |\n\n\n| DOORS |  |  |\n| --- | --- | --- |\n|  | TASK / ITEM | ADDITIONAL INFO |\n|  | CHECK THAT ALL DOORS OPEN EASILY AND PROPERLY |  |\n|  | ENSURE LATCHES CATCH |  |\n|  | OPEN DOORS TO CHECK FOR PROPER STOPPER ALIGNMENT |  |\n|  | CHECK ALL DOOR LOCKS FOR FUNCTIONALITY |  |\n|  | CHECK FOR GAPS UNDER DOORS AT THRESHOLDS |  |\n|  |  |  |\n|  |  |  |\n\n\n| WINDOWS |  |  |\n| --- | --- | --- |\n|  | TASK / ITEM | ADDITIONAL INFO |\n|  | INSPECT ALL GLASS FOR BREAKS AND CRACKS |  |\n|  | OPEN AND CLOSE ALL WINDOWS |  |\n|  | CHECK FOR AIR LEAKS BY HOLDING A MATCH OR LIGHTER |  |\n|  | CHECK THAT SCREENS ARE IN GOOD CONDITION |  |\n|  | CHECK HARDWARE, LOCKS AND HINGES |  |\n|  |  |  |\n|  |  |  |\n\n\n| KITCHEN |  |  |\n| --- | --- | --- |\n|  | TASK / ITEM | ADDITIONAL INFO |\n|  | INSPECT CABINETRY FIXTURES AND FINISHES |  |\n|  | INSPECT COUNTERTOPS FOR CRACKS AND SCRATCHES |  |\n|  | CHECK CABINETRY FOR STURDY SHELVING AND HINGES |  |\n|  | CHECK DRAWERS FOR SMOOTH OPENING AND CLOSING |  |\n|  | CHECK APPLIANCE FUNCTIONALITY AND PROPER HOOK-UPS |  |\n|  |  |  |\n|  |  |  |\n\n\n| BATH |  |  |\n| --- | --- | --- |\n|  | TASK / ITEM | ADDITIONAL INFO |\n|  | ALLOW SHOWERS / TUB FIXTURES TO RUN |  |\n|  | CHECK FOR PROPER FLOW AND TEMPERATURE |  |\n|  | ALLOW WATER TO \"PUDDLE\" TO CHECK FOR PROPER DRAINAGE |  |\n|  | CHECK BASINS FOR CHIPS / CRACKS |  |\n|  | FLUSH TOILETS |  |\n|  | CHECK THAT TOILETS ARE PROPERLY SET FOR SAFETY AND LEAKS |  |\n|  | CHECK CABINETS, CLOSETS, AND FLOORS FOR MOISTURE |  |\n|  |  |  |\n|  |  |  |\n\n\n| EXTERIOR, PORCHES, AND DECKS |  |  |\n| --- | --- | --- |\n|  | TASK / ITEM | ADDITIONAL INFO |\n|  | CHECK SIDING / BRICK FOR CONDITION AND EVEN COVERAGE |  |\n|  | CHECK SIDING / BRICK FOR APPEARANCE |  |\n|  | CHECK GUTTERS, DOWNSPOUTS, AND DRAINAGE AREAS |  |\n|  | CHECK SIDEWALKS, PORCH AND PATIO FLOORS FOR CRACKS |  |\n|  | ENSURE STURDINESS OF ALL RAILINGS |  |\n|  | CHECK FOR LOOSE / EXPOSED NAILS AND SCREWS |  |\n|  | CHECK STURDINESS OF PORCHES AND DECKS |  |\n|  |  |  |\n|  |  |  |\n\n\n| ATTIC AND BASEMENT |  |  |\n| --- | --- | --- |\n|  | TASK / ITEM | ADDITIONAL INFO |\n|  | CHECK FOR MOISTURE / MOLD |  |\n|  |","cbCaiqoMJd3zO1yd","https://ap.wps.com/l/cbCaiqoMJd3zO1yd","pdf",130971,"English","# Things to Remember for Final Walkthrough\n# Heating & Cooling\n# Electrical\n# Plumbing\n# Ceilings, Walls, and Floors\n# Doors\n# Windows\n# Kitchen\n# Bath\n# Exterior, Porches, and Decks\n# Attic and Basement\n# Garage and Additional Structures\n# Miscellaneous\n# Additional Comments","[{\"question\":\"What is the purpose of this new home checklist template?\",\"answer\":\"It provides an organized task list for completing a final walkthrough inspection across major home systems and rooms before closing. The checklist helps ensure issues are identified, addressed, and documented.\"},{\"question\":\"How should you plan timing before the final walkthrough?\",\"answer\":\"Allow several days between inspection and closing. This creates enough time to fix issues and verify corrections before finalizing the move.\"},{\"question\":\"Which areas does the checklist cover during inspection?\",\"answer\":\"It covers heating and cooling, electrical, plumbing, ceilings/walls/floors, doors, windows, kitchen, bath, exterior areas, attic and basement, and garage/additional structures.\"}]","New Home Checklist Template - Final Walkthrough | PDF",1789170259]