[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-191422-105":53,"doc-detail-191422-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","national-risk-register-2025","National Risk Register 2025","","The National Risk Register 2025 outlines significant changes and updates to various risk scenarios. Key updates include the revision of the cyber attack scenarios for the health and social care system, as well as the transport sector. The likelihood score for a conventional attack on infrastructure has been adjusted from 4 to 3. Disruptions to Russian gas supplies to Europe and other global oil trade routes have also been updated, with the latter seeing a likelihood score change from 2 to 3. The failure of gas supply infrastructure has been updated, while the malicious drone incident no longer includes a matrix in this version. Natural disaster scenarios such as volcanic eruptions and wildfires have had their variations updated. In the realm of animal diseases, major outbreaks of highly pathogenic avian influenza have had their variations updated, and the impact score for a major outbreak of African swine fever has increased from 2 to 3. This document serves as a crucial reference for understanding and managing national risks.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":51,"@type":70,"position":76},"https://docshare.wps.com/template/general/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/national-risk-register-2025/191422/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/national-risk-register-2025/191422.png","ImageObject",442,249,{"name":88,"@type":89},"Sarah ","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-04","2026-09-03",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",8,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What has changed in the cyber attack scenarios?","Question",{"text":109,"@type":110},"The cyber attack scenarios for the health and social care system, as well as the transport sector, have been updated.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How has the risk of a conventional attack on infrastructure changed?",{"text":114,"@type":110},"The likelihood score for a conventional attack on infrastructure has changed from a 4 to a 3.",{"name":116,"@type":107,"acceptedAnswer":117},"What are the updates regarding animal diseases?",{"text":118,"@type":110},"Variations have been updated for major outbreaks of highly pathogenic avian influenza, and the impact score for African swine fever has increased from 2 to 3.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},191422,1788408510,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":50,"category_name":51,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":126,"read_time":141},962085320529,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","| Risk | Description of change |\n| --- | --- |\n| Cyber attack: health and social care system | Scenario has been updated |\n| Cyber attack: transport sector | Scenario has been updated |\n| Conventional attack on infrastructure (combined score on the matrix – average of multiple scenarios) | Likelihood score has changed from a 4 to a 3 |\n| Disruption of Russian gas supplies to Europe | Scenario has been updated |\n| Disruption to global oil trade routes | Likelihood score has changed from a 2 to a 3 |\n| Failure of gas supply infrastructure | Scenario has been updated |\n| Malicious drone incident | Matrix has been removed from this version |\n| Volcanic eruption | Variations have been updated |\n| Wildfire | Variations have been updated |\n| Animal disease: major outbreak of highly pathogenic avian influenza | Variations have been updated |\n| Animal disease: major outbreak of African swine fever | Impact score has changed from a 2 to a 3 |","cbCaiaCf2zDLvYW4","https://ap.wps.com/l/cbCaiaCf2zDLvYW4","pdf",4963486,187,"English","# National Risk Register 2025\n## Risk\n## Description of change","[{\"question\":\"What has changed in the cyber attack scenarios?\",\"answer\":\"The cyber attack scenarios for the health and social care system, as well as the transport sector, have been updated.\"},{\"question\":\"How has the risk of a conventional attack on infrastructure changed?\",\"answer\":\"The likelihood score for a conventional attack on infrastructure has changed from a 4 to a 3.\"},{\"question\":\"What are the updates regarding animal diseases?\",\"answer\":\"Variations have been updated for major outbreaks of highly pathogenic avian influenza, and the impact score for African swine fever has increased from 2 to 3.\"}]","National Risk Register 2025 | PDF",65]