[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-245737-105":53,"doc-detail-245737-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","national-building-code-2023-alberta-edition-schedule-c-3-assurance-of-delegated-design-compliance-and-field-reviews","National Building Code – 2023 Alberta Edition - Schedule C-3 - Assurance of Delegated Design Compliance and Field Reviews","","Schedule C-3 provides a formal assurance by a delegated registered professional that submitted design and construction of specified building components substantially comply with the National Building Code (NBC(AE)) and the Safety Codes Act. It requires confirmation of access to review submittals before construction, completion of required field review obligations under Division C, and availability of documents supporting approved construction changes. The schedule also captures project and permit information, identifies the registered professionals involved, and includes contact and authentication details.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/national-building-code-2023-alberta-edition-schedule-c-3-assurance-of-delegated-design-compliance-and-field-reviews/245737/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/national-building-code-2023-alberta-edition-schedule-c-3-assurance-of-delegated-design-compliance-and-field-reviews/245737.png","ImageObject",442,249,{"name":88,"@type":89},"Franzy","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-23","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",10,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"Who must submit Schedule C-3 and when is it submitted?","Question",{"text":109,"@type":110},"Each registered professional delegated with design and field reviews submits the schedule to the registered professional(s) of record after substantial completion of the applicable project work and before permission to occupy is granted by the authority having jurisdiction.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What compliance assurances does the delegated professional provide?",{"text":114,"@type":110},"The delegated professional assures the submitted design and the final as-constructed design substantially comply with the NBC(AE) and the Safety Codes Act, confirms access to review submittals before construction, confirms field review obligations are fulfilled, and confirms supporting documents for approved changes are made available.",{"name":116,"@type":107,"acceptedAnswer":117},"What information does Schedule C-3 require for permit and professional identification?",{"text":118,"@type":110},"It collects the building permit number, project reference/components, the names and addresses of the registered professional(s) of record and delegated registered professional, and provides contact details plus authentication/validation information for the professional permit holder when applicable.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},245737,1789230864,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":126,"read_time":9},2336478945519,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","ASSURANCE OF DELEGATED DESIGN COMPLIANCE AND FIELD REVIEWS BY THE  \nDELEGATED PROFESSIONAL  \nNotes:  \n1. Italicized words contained in this schedule have the same meanings as defined in the National Building Code – 2023 Alberta Edition (NBC(AE)) .  \n2. This schedule shall be submitted by each registered professional, that has been delegated responsibility for  \ndesign and field reviews of specific building components, to the registered professional(s) of record after substantial completion of the applicable project work and before permission to occupy is given by the authority having jurisdiction.  \n3. This schedule is endorsed by the Alberta Association of Architects and the Association of Professional Engineers and Geoscientists of Alberta. Both associations have a user guide available on their website that provides information on the use of this schedule.  \nTo: the registered professional(s) of record  \n\n| Name of registered professional(s) of record (print)\u003Cbr>Re: |\n| --- |\n| Name of project ( print) |\n\nAddress or legal survey description of project ( print)  \nThe undersigned registered professional hereby gives assurance that  \n(a) the submitted design of the  \nEnter specific components here:  \ncomponents of the project described on the drawings and specifications prepared by them substantially complies with the NBC(AE) and the Safety Codes Act (SCA);  \n(b) they have made available to the registered professional(s) of record submittals showing the intended design of the components identified above for review prior to construction;  \n(c) they have fulfilled their obligations for field reviews as outlined in Sentence [2.4.2.3](2.4.2.3). (3) of Division C of the NBC(AE);  \n\n| Building Permit Number\u003Cbr>(for Authority Having Jurisdiction) | Project Reference / Components\u003Cbr>(for Registered Professional of Record) |\n| --- | --- |\n\nNational Building Code – 2023 Alberta Edition  \nSchedule C-3  \n(d) they have made available to the registered professional(s) of record, all documents supporting all approved changes made during construction;  \n(e) the final design of the components described above (including approved changes), as constructed, substantially complies with the NBC(AE) and SCA; and  \n(f) they are a registered professional as defined in the NBC(AE) .  \nProfessional Permit Holder (if applicable)  \n Professional permit holder's phone number   \nProfessional permit holder's e-mail (print) Professional permit holder's validation  \nRegistered Professional  \n Registered professional's legal name (print)   \n Registered professional's address (print)   \n Registered professional's phone number   \nRegistered professional's e-mail (print) Registered professional's authentication","cbCaio6SJf6mxDGR","https://ap.wps.com/l/cbCaio6SJf6mxDGR","pdf",655490,"English","# Assurance of Delegated Design Compliance and Field Reviews\n## Submission timing and endorsements\n## To, project identification, and insured components\n## Compliance assurances (a)-(f) under NBC(AE)\n## Permit details and professional/permit holder information","[{\"question\":\"Who must submit Schedule C-3 and when is it submitted?\",\"answer\":\"Each registered professional delegated with design and field reviews submits the schedule to the registered professional(s) of record after substantial completion of the applicable project work and before permission to occupy is granted by the authority having jurisdiction.\"},{\"question\":\"What compliance assurances does the delegated professional provide?\",\"answer\":\"The delegated professional assures the submitted design and the final as-constructed design substantially comply with the NBC(AE) and the Safety Codes Act, confirms access to review submittals before construction, confirms field review obligations are fulfilled, and confirms supporting documents for approved changes are made available.\"},{\"question\":\"What information does Schedule C-3 require for permit and professional identification?\",\"answer\":\"It collects the building permit number, project reference/components, the names and addresses of the registered professional(s) of record and delegated registered professional, and provides contact details plus authentication/validation information for the professional permit holder when applicable.\"}]","National Building Code – 2023 Alberta Edition - Schedule C-3 - Assurance of Delegated Design Compliance and Field Reviews | PDF"]