[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-241495-105":53,"doc-detail-241495-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","monthly-project-construction-progress-report-5","Monthly Project Construction Progress Report - 5","","Monthly project construction progress report #5 covering additions and alterations to Williamsport Area Middle School for Williamsport Area School District, dated 17 July 2012. Summarizes June/July 2012 completed site work and building activities including storm retention installation, storm piping, concrete and masonry repairs, ICF foundation work, and MEP rough-ins. Lists expected July/August 2012 work, including continued storm piping, HVAC/MEP rough-ins, roofing replacement, masonry and insulation concrete forms. Provides project cost and billing status plus change orders for approval.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/monthly-project-construction-progress-report-5/241495/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/monthly-project-construction-progress-report-5/241495.png","ImageObject",442,249,{"name":88,"@type":89},"Nguyễn Văn Học","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-11","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":76},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What work was completed during June/July 2012?","Question",{"text":108,"@type":109},"The report lists completed site work (E&S controls, grading, temporary parking, geo-thermal conductivity test, storm retention system, storm piping continuation, electrical distribution start, sanitary/storm tie-ins) and building work (concrete and exterior restoration, footer excavation, masonry foundation, mechanical room foundations, ICF start, metal stud framing, drywall installation, and MEP rough-ins).","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What work is anticipated for July/August 2012?",{"text":113,"@type":109},"Planned items include continuing storm piping and geo-thermal well field progress, continuing electrical underground rough-ins, and in the building area continuing metal stud wall installation, MEP layout/rough-ins, exterior concrete restoration, roofing replacement, foundations and ICF work, slab on grade, above-grade masonry, window replacement, steel delivery, drywall installation, and related tasks.",{"name":115,"@type":106,"acceptedAnswer":116},"How is project cost and billing status reported?",{"text":117,"@type":109},"It provides original and current contract amounts, previous billed amount and remaining balance, current payment due, remaining balance, and billing percentages for the month and to date, followed by potential/upcoming change orders and detailed change orders for approval with cost impacts.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},241495,1791213236,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":135,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":47,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":73},1374402739827,"https://ap-avatar.wpscdn.com/avatar/14000c97e7351f1a627?x-image-process=image/resize,m_fixed,w_180,h_180&k=1787885694763230660","Rendering Provided by McKissick Associates  \nMONTHLY PROJECT CONSTRUCTION PROGRESS REPORT \\#5  \nAdditions and Alterations to Williamsport Area Middle School Williamsport Area School District  \n17 July 2012  \nGeo-Thermal Well Field  \nGeo-Thermal Well Field  \nArea D –Mechanical Room Foundation Walls  \nPROJECT SUMMARY  \nWork Completed June/July 2012  \nSITE WORK:  \n􀁸 Maintain Erosion & Sediment(E&S) controls  \n􀁸 Site grading  \n􀁸 Completed temporary HS site parking.  \n􀁸 Geo-thermal contractor mobilized, performed conductivity test.  \n􀁸 Completed installation of underground storm retention system  \n􀁸 Continued Storm piping.  \n􀁸 Began site electrical distribution.  \n􀁸 Tie-in of sanitary and storm lines on 4th St.  \nBUILDING:  \n􀁸 Continued concrete repairs in crawl space.  \n􀁸 Continued exterior bldg conc. Restoration  \n􀁸 Continued footer excavation at rear of building.  \n􀁸 Continued masonry foundation at rear of building.  \n􀁸 Continued foundations – Mechanical Room.  \n􀁸 Began Insulation Concrete Form(ICF) work.  \n􀁸 Continued metal stud framing-1st and 2nd floors.  \n􀁸 Began installation of drywall  \n􀁸 Continued Mechanical/Electrical/Plumbing(MEP)  \nrough-ins.– 1st and 2nd floors of existing bldg.  \n􀁸 Continued underslab MEP rough-ins in  \n􀁸 Began concrete slab on grade.  \n􀁸 Begin roofing replacement  \nWork Anticipated July/August 2012  \nSITEWORK:  \n􀁸 Continue Storm piping  \n􀁸 Continue Geo-thermal well field.  \n􀁸 Continue Electrical underground rough ins  \nBUILDING:  \n􀁸 Continued metal stud wall installation.  \n􀁸 Continue Mechanical/Electrical/Plumbing (MEP) layout & rough ins.  \nFOREMAN PROGRAM AND CONSTRUCTION MANAGERS P O BOX 189, 2685 HOSSLER ROAD, MANHEIM, PA 17545 TELEPHONE (717) 653-0589-FAX (717) 653-9427  \nInsulation Concrete Forms(ICF) -Foundations  \nConcrete Slab On Grade – Preparation  \nConcrete Slab Pour and Prep.  \nWork Anticipated(Cont’) July/August 2012  \nBUILDING:  \n􀁸 Continue exterior concrete restoration  \n􀁸 Continue roofing replacement.  \n􀁸 Continue foundations rear of building  \n􀁸 Continue foundations – Mechanical Room.  \n􀁸 Continue Insulation Concrete Form(ICF) work.  \n􀁸 Continue concrete slab on grade.  \n􀁸 Begin above grade masonry.  \n􀁸 Begin window replacement.  \n􀁸 Receive steel delivery.  \n􀁸 Continue drywall installation.  \nPROJECT COST SUMMARY  \nBilling Information:  \nOriginal Contract Amount: $32,520,490 .00  \nChanges to Contract:  $ 138,710 .06  \nCurrent Contract Amount: $32,659,200 .06  \nPrevious Billed Amount:  $ 4,135,770 .91  \nPrevious Balance Remaining: $28,523,429 .15  \nCurrent Payment Due:  $ 1,829,135.45  \nRemaining Balance: $26,694,293 .70  \nBilling percentage this month: 5.60%  \nTotal Billing Percentage to date: 18.26%  \nPotential/Upcoming Change Orders:  \n􀁸 Remove existing underground concrete area way from rear of building $5,500 .00  \n􀁸 Add platforms in existing mechanical chase with  \n2 access doors. GC $3,687 .65  \nAcoustical Drywall Cont. $1,445 .36  \n􀁸 Remove and replace existing drywall and associated fixtures and material due to water damage on existing drywall in kitchen area. TBD  \n􀁸 Change select water fountains to bottle fillers. TBD.  \n􀁸 Provide Exhaust fans to crawl space. TBD  \n􀁸 Electrical requirements to install security sys. TBD.  \nFOREMAN PROGRAM AND CONSTRUCTION MANAGERS P O BOX 189, 2685 HOSSLER ROAD, MANHEIM, PA 17545 TELEPHONE (717) 653-0589-FAX (717) 653-9427  \nCafetorium and Stage Area backfill  \nMetal Stud Wall Framing-2nd Floor  \nHVAC Duct Work Rough-ins  \nChange Orders For Approval:  \nLOBAR  \n􀁸 GC-008-Credit associated with bulletin \\#2 to delete operable partitions ($54,937 .02)  \n􀁸 GC-009(Revised) -Cost associated with bulletin \\#4 to reconfigure Technology and FCS CR’s $22,435 .37  \n􀁸 GC-010-Cost associated with removing existing metal studs framing and replace with masonry walls at west wall of serving room. $2,977 .97  \nMID STATE ROOFING  \n􀁸 ROOF-001-Cost associated with bulletin \\#4 to  \nreconfigure Technology and FCS classrooms(eliminate 2 EF penetrations) and bul","cbCaikKzy9o5RfA9","https://ap.wps.com/l/cbCaikKzy9o5RfA9","pdf",378353,10,"English","# PROJECT SUMMARY\n## Work Completed June/July 2012\n## Work Anticipated July/August 2012\n## PROJECT COST SUMMARY\n## Potential/Upcoming Change Orders\n## Change Orders For Approval","[{\"question\":\"What work was completed during June/July 2012?\",\"answer\":\"The report lists completed site work (E\\u0026S controls, grading, temporary parking, geo-thermal conductivity test, storm retention system, storm piping continuation, electrical distribution start, sanitary/storm tie-ins) and building work (concrete and exterior restoration, footer excavation, masonry foundation, mechanical room foundations, ICF start, metal stud framing, drywall installation, and MEP rough-ins).\"},{\"question\":\"What work is anticipated for July/August 2012?\",\"answer\":\"Planned items include continuing storm piping and geo-thermal well field progress, continuing electrical underground rough-ins, and in the building area continuing metal stud wall installation, MEP layout/rough-ins, exterior concrete restoration, roofing replacement, foundations and ICF work, slab on grade, above-grade masonry, window replacement, steel delivery, drywall installation, and related tasks.\"},{\"question\":\"How is project cost and billing status reported?\",\"answer\":\"It provides original and current contract amounts, previous billed amount and remaining balance, current payment due, remaining balance, and billing percentages for the month and to date, followed by potential/upcoming change orders and detailed change orders for approval with cost impacts.\"}]","Monthly Project Construction Progress Report - 5 | PDF",1789176237]