[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-239603-105":53,"doc-detail-239603-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","method-statement-template-health-and-safety-work-plan","Method Statement Template - Health and Safety Work Plan","","A structured method statement template for planning and controlling health, safety, and environmental risks during loading and unloading of leachate, sludge, and septic waste. It provides sections to record company details, customer information, work descriptions, site rules, competence requirements, responsibilities, and the sequence of activities. The template emphasizes compliance with safe systems of work, risk assessments, COSHH, environmental assessments, duty of care legislation, and proper PPE and equipment checks.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/method-statement-template-health-and-safety-work-plan/239603/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/method-statement-template-health-and-safety-work-plan/239603.png","ImageObject",442,249,{"name":88,"@type":89},"Terk","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-22","2026-09-11",true,{"@type":98,"interactionType":99,"userInteractionCount":8},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What documents should be read together with this method statement?","Question",{"text":108,"@type":109},"This method statement must be read with the Safe System of Works, the Health and Safety Policy Manual, and attached risk assessments reviewed annually.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What work does the template cover?",{"text":113,"@type":109},"It covers loading and unloading of Leachate, Sludge, or Septic waste, including transportation-related site activities and procedures.",{"name":115,"@type":106,"acceptedAnswer":116},"Which compliance requirements are highlighted for staff?",{"text":117,"@type":109},"The template requires compliance with relevant legislation, COSHH, environmental assessments, duty of care legislation, and adherence to site rules and restrictions while on site.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},239603,1790369793,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":8,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":76},1099525198933,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","Method Statement Template  \nThis method statement must be read in conjunction with the Safe System of Works, Health and Safety Policy Manual and attached risk  \nassessments which are reviewed annually.  \n\n| Company name: |  | Address: |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| Telephone: |  | Email: |  |  |  |  |\n| Customer name: |  |  |  |  |  |  |\n| Description of works: | Loading and unloading of Leachate / Sludge/ Septic waste |  |  |  |  |  |\n| Location of work: |  |  |  |  |  |  |\n| Start date / time: |  |  | Finish date / time: |  |  |  |\n| Resources and personnel involved | Name |  |  |  | Role |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |\n| Site supervisor: |  |  |  |  | Telephone: |  |\n| Safety officer: |  |  |  |  | Telephone: |  |\n| Resources, plant and equipment |  |  |  |  |  |  |\n\n\n| Responsibilities | The team will be led by   , who will instruct the team to ensure the planned work is carried out in accordance with our company and our customer’s   will be responsible for the health & safety of all employees under their control.\u003Cbr>Operatives will organise and carry out work as per supervisor’s instruction, ensuring they maintain records of work; report on health & safety and environmental issues , and look after plant & equipment.\u003Cbr>All waste transported must comply with all relevant legislation. Operatives must also comply with Control of Substances Hazardous to Health (COSHH) and Environmental Assessments and Duty of Care legislation. |\n| --- | --- |\n| Site rules and restrictions | Transportation of waste is to be carried out on receipt of the Task Order or Order Number issued from   Work is to commence on  \u003Cbr>All instructions and directions issued by site representative must be followed whilst on site , ensuring site rules are adhered to. Smoking is not permitted in company vehicles. |\n| Competence levels | Drivers (named above) have received information and instruction on the content of this Method Statement and attached Risk Assessment.\u003Cbr>Drivers (named above) have received comprehensive inductions and on the job training. On-going training is reviewed on a regular basis. All drivers carrying out this task are highly competent in the Transportation of Septic, Sludge and Liquid waste activities.\u003Cbr>If any changes in these procedures are proposed by   , they will be submitted to   for their input and review and staff will be re-trained accordingly.\u003Cbr>Health & safety shall be in accordance with   Policy Statement and Chapter 8 Traffic Signs Manual. They must follow and comply with the COSHH and Environmental assessments and the Duty of Care Legislation.\u003Cbr>Driving\u003Cbr>Drivers (named above) have the appropriate category driving qualifications and are medically certified to drive the vehicle. |\n\n\n|  | Personal Protective Equipment (PPE)\u003Cbr>Drivers (named above) have received training on the use of appropriate PPE to carry out their work in a safe manner to them and others.\u003Cbr>Plant and Equipment\u003Cbr>Drivers (named above) have received suitable and sufficient training in the inspection and safe use of equipment.\u003Cbr>Manual Handling\u003Cbr>Drivers (named above) have received training on safe manual handling techniques.\u003Cbr>Slips, Trips and Falls\u003Cbr>Drivers (named above) have received suitable and sufficient training on slips, trips and falls.\u003Cbr>Environmental Controls\u003Cbr>Drivers (named above) have been trained in the controls specified within   environmental management system and will abide by the site specific and environmental controls on the site they are working.\u003Cbr>Records of training are maintained and available on request. |\n| --- | --- |\n| Sequence and methodology for work activities | Checking, Preparing and Setting up Equipment\u003Cbr>Before leaving the depot, drivers must:\u003Cbr>• Carry out daily checks on their vehicle and record on","cbCaioJjNn1FyRAc","https://ap.wps.com/l/cbCaioJjNn1FyRAc","pdf",355941,8,"English","# Method statement header information\n## Work details and locations\n## Personnel, responsibilities, and site roles\n# Safety, competence, and compliance requirements\n## Competence levels and training\n## PPE, plant, equipment, and manual handling\n## Environmental controls and records\n# Work sequence and methodology\n## Pre-departure checks\n## Arrival site procedures\n## Loading and unloading steps","[{\"question\":\"What documents should be read together with this method statement?\",\"answer\":\"This method statement must be read with the Safe System of Works, the Health and Safety Policy Manual, and attached risk assessments reviewed annually.\"},{\"question\":\"What work does the template cover?\",\"answer\":\"It covers loading and unloading of Leachate, Sludge, or Septic waste, including transportation-related site activities and procedures.\"},{\"question\":\"Which compliance requirements are highlighted for staff?\",\"answer\":\"The template requires compliance with relevant legislation, COSHH, environmental assessments, duty of care legislation, and adherence to site rules and restrictions while on site.\"}]","Method Statement Template - Health and Safety Work Plan | PDF",1789150961]