[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-255183-105":53,"doc-detail-255183-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","medworth-efw-chp-facility-response-to-deadline-1-10-march-2023","Medworth EfW CHP Facility - Response to Deadline 1 (10 March 2023)","","Letter prepared by Medworth CHP Limited to respond to the Examining Authority’s Deadline 1 request for submissions under the Planning Act 2008 and the Infrastructure Planning (Examination Procedure Rules 2010). It explains the Applicant’s response, references the Rule 8 letter dated 2 March 2023, and confirms how submitted documents support the examination. The submission includes multiple volumes of application forms, plans, drafts, environmental statement chapters and appendices, and other outline management plans, with tracked-change versions where appropriate.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/medworth-efw-chp-facility-response-to-deadline-1-10-march-2023/255183/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/medworth-efw-chp-facility-response-to-deadline-1-10-march-2023/255183.png","ImageObject",442,249,{"name":88,"@type":89},"Aria","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-19","2026-09-13",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",9,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the purpose of this letter for Medworth CHP Limited?","Question",{"text":109,"@type":110},"It sets out the Applicant’s response to the Examining Authority’s request for submissions at Deadline 1 under the relevant infrastructure planning rules.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"Which exam authority request is referenced to frame the Deadline 1 submissions?",{"text":114,"@type":110},"The letter references the Rule 8 letter issued by the Examining Authority on 2 March 2023, which requested submissions at Deadline 1.",{"name":116,"@type":107,"acceptedAnswer":117},"What types of documents are listed in the Deadline 1 submission?",{"text":118,"@type":110},"The letter lists submitted materials across multiple volumes, including application forms, land and access plans, draft development consent order documents, environmental statement chapters and appendices, and other outline management plans.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},255183,1790663890,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":15,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":79},2336464648322,"https://ap-avatar.wpscdn.com/avatar/2200025388227c56fec?_k=1778556882303663488","Please reply to:  \nc/o Devonport EfW CHP Facility, Creek Road, Plymouth, PL5 1FL  \nThe Planning Inspectorate Temple Quay House  \nTemple Quay Bristol  \nBS1 6PN  \n10th March 2023  \nDear   \nMedworth CHP Limited  \nRegistered Office:  \nDevonport EfW CHP Facility Creek Road  \nPlymouth  \nPL5 1FL  \nManaging Directors:  \nRegistration Number: 13130012  \nPlanning Act 2008 (AS AMENDED), Infrastructure Planning (Examination Procedure Rules 2010  \nEN 010110 - Application by Medworth CHP Limited for an Order Granting Development Consent for the Medworth Energy from Waste Combined Heat and Power Facility (Medworth EfW CHP Facility)  \nResponse to Deadline 1 (Friday 10th March 2023)  \nThis letter sets out Medworth CHP Limited’s (‘the Applicant’) response to the Examining Authority’s (ExA) request for submissions at Deadline 1 as set out in the Rule 8 letter issued by the ExA on 2nd March 2023.  \nSubmitted Documents  \nTable 1.1 (enclosed) lists the documents submitted by the Applicant at Deadline 1, including those requested by the ExA within their Rule 8 letter, the ISH 1 Action Points and additional supporting documents. The reason for each document submitted is explained in Table 1.1.  \nWhere appropriate, track-changed versions of existing documents are submitted to provide an understanding of the precise changes made.  \nIf you have any questions concerning the Applicant’s Deadline 1 submission, please do not hesitate to contact our planning agent Hannah Callear, WSP Ltd.  \nYours sincerely  \nManaging Director  \nHead of Planning  \nEnc: Table 1. 1: Applicant’s Deadline 1 documents  \nTable 1.1 Applicant’s Deadline 1 documents  \n\n| Reference Document | Revision | Reason |\n| --- | --- | --- |\n| Volume 1 Application Forms |  |  |\n| 1.5 Guide to the application (clean) | Rev 4 | |\n| \u003Cbr>1.5 Guide to the application (tracked)\u003Cbr>Volume 2 Plans | | \u003Cbr>As above. |\n| 2.2 Land Plans | Rev 2 | This plan has been revised to include updated highways boundary information on New Bridge Lane. |\n| 2.4 Access and Public Rights of Way Plan | | |\n| Volume 3 Draft Development Consent Order |  |  |\n| 3.1 Draft Development Consent Order (clean) | Rev 2 | |\n| | Rev 2 | As above. |\n| Volume 4 Compulsory Acquisition Information\u003Cbr>\u003Cbr>4.1 Book of Reference (clean) | \u003Cbr>Rev 2 | \u003Cbr>|\n\n| Reference | Document | Revision | Reason |\n| --- | --- | --- | --- |\n| refreshes and general consistency checks. A Schedule of Changes is provided within the Deadline 1 documents (Ref. 9.19 below) . |  |  |  |\n| 4.1 | | Rev 2 | As above. |\n| Volume 6 Environmental Statement |  |  |  |\n| 6.3 | ES Chapter 3 Description of Development Figures – 3.19 i -iv the Proposed | Rev 2 | |\n| 6.4 | | Rev 2 | The revised management plan incorporates updates proposed in the relevant representationsand through ongoing engagement with Statutory Parties. |\n| 6.4 | | Rev 2 | As above. |\n| 6.4 | ES Chapter 7 Noise and Vibration Appendix 7D Outline Operational Noise Management Plan (clean) | Rev 2 | The revised management plan incorporates updates proposed in the relevant representationsand through ongoing engagement with Statutory Parties. |\n| 6.4 | | Rev 2 | As above. |\n| 6.4 | | Rev 2 | The Report incorporates updates proposed in the relevant representations and through ongoing engagement with Statutory Parties. |\n\n\n| Reference | Document Revision\u003Cbr>|  |  |  | Reason |\n| --- | --- | --- | --- | --- | --- |\n| 6.4 | ES Chapter 8 Air Quality Appendix 8B Air Technical Report (tracked) | Quality | Rev | 2 | As above. |\n| 6.4 | ES Chapter 12 Hydrology Appendix 12F Drainage Strategy (clean) | Outline | Rev | 2 | The revised management plan incorporates updates proposed in the relevant representationsand through ongoing engagement with Statutory Parties. |\n| 6.4 | ES Chapter 12 Hydrology Appendix 12F Drainage Strategy (tracked) | Outline | Rev | 2 | As above. |\n| Volume 7 Other Documents |  |  |  |  |  |\n| 7.9 | Outline Flood Emergency Management Plan (clean) |  | Rev 2 |  | The revised management plan incorpora","cbCaivIlIineqMSG","https://ap.wps.com/l/cbCaivIlIineqMSG","pdf",360224,"English","# Response to Deadline 1 (Friday 10th March 2023)\n## Submitted Documents (Table 1.1)\n## Applicant’s Deadline 1 Covering Letter and Supporting Volumes","[{\"question\":\"What is the purpose of this letter for Medworth CHP Limited?\",\"answer\":\"It sets out the Applicant’s response to the Examining Authority’s request for submissions at Deadline 1 under the relevant infrastructure planning rules.\"},{\"question\":\"Which exam authority request is referenced to frame the Deadline 1 submissions?\",\"answer\":\"The letter references the Rule 8 letter issued by the Examining Authority on 2 March 2023, which requested submissions at Deadline 1.\"},{\"question\":\"What types of documents are listed in the Deadline 1 submission?\",\"answer\":\"The letter lists submitted materials across multiple volumes, including application forms, land and access plans, draft development consent order documents, environmental statement chapters and appendices, and other outline management plans.\"}]","Medworth EfW CHP Facility - Response to Deadline 1 (10 March 2023) | PDF",1789286900]