[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-286071-105":53,"doc-detail-286071-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","maintenance-agreement-class-5-sewage-system","Maintenance Agreement - Class 5 Sewage System","","This document provides a formal maintenance agreement template for Class 5 sewage systems, specifically for holding tanks within the Ashfield-Colborne-Wawanosh township. It outlines the essential responsibilities of both the licensed hauler and the property owner to ensure sanitary sewage disposal and operational compliance. Key obligations include regular tank pumping, monitoring of capacity warning devices, secure equipment access, and mandatory notification of the local Building Department regarding any contract termination or changes. The agreement serves as a critical tool for property owners to maintain regulatory compliance with local municipal requirements, ensuring all pumped materials are handled at licensed sanitary facilities. This professional template includes designated fields for owner and hauler contact information, property location, and formal authorization signatures.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/maintenance-agreement-class-5-sewage-system/286071/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/maintenance-agreement-class-5-sewage-system/286071.png","ImageObject",442,249,{"name":88,"@type":89},"Evangeline","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-22","2026-09-17",true,{"@type":98,"interactionType":99,"userInteractionCount":15},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"Who should receive a copy of this completed agreement?","Question",{"text":108,"@type":109},"A copy of the signed agreement must be submitted to the Ashfield-Colborne-Wawanosh Township’s Building Department located in Goderich, Ontario.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What are the primary responsibilities of the licensed hauler?",{"text":113,"@type":109},"The hauler is responsible for pumping the tank at reasonable intervals, ensuring the capacity warning device is functional, utilizing secure pump-out openings, and disposing of all pumped materials at a licensed sanitary facility.",{"name":115,"@type":106,"acceptedAnswer":116},"What must the property owner do if they decide to change contractors?",{"text":117,"@type":109},"The owner is required to notify the Building Department directly if there is an impeding termination of the current agreement or a change in service contractors.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},286071,1790510675,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":15,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":4},13056703019662,"https://ap-avatar.wpscdn.com/avatar/be000253a8e92610077?_k=1778726343310543188","Maintenance Agreement: Class 5 Sewage System (Holding Tank)  \nCONTRACT AGREEMENT BETWEEN:  \nName of Owner   Phone No   E-mail   Mailing Address    \nName of Licensed Hauler  Phone No   E-mail  Address   \nLOCATION OF HOLDING TANK TO BE SERVICED:  \nAddress  Lot \\#  Con \\#  Roll No    \nCONTRACTOR AGREES:  \n1. To pump out this holding tank at reasonable intervals so that over-filling of tank will be prevented  \n2. To ensure that the visible or other adequate warning device signifying when the tank is near capacity is functional 3. Pump out opening is suitably sized, capped and equipped with a locking device  \n4. That all material pumped from holding tank is disposed of in a sanitary manner in a Licensed facility  \n5. Shall retain all copies of receipts for said discharge  \nOWNER OR OCCUPANT AGREES:  \n1. To restrict use of facilities in so far as is practical, to facilitate a systematic servicing by contractors and help eliminate emergency calls  \n2. To ensure that holding tank is equipped with a visible or other adequate warning device signifying when tank is nearing capacity  \n3. To provide reasonably adequate access to the holding tank for the contractor’s equipment  \n4. The Building Department must be notified directly of any impeding termination of this agreement or change of contractors.  \nOwner Signature  Date  Hauler Signature  Date   \n***A copy of this Agreement must be submitted to the Ashfield-Colborne-Wawanosh Township’s Building Department:  \n82133 Council Line Goderich ON, N7A 3Y2 [cosip@acwtownship.ca](cosip@acwtownship.ca)","cbCaigPKjYhTO70a","https://ap.wps.com/l/cbCaigPKjYhTO70a","pdf",227839,"English","# Contract Agreement Details\n## Contractor Responsibilities\n## Owner and Occupant Responsibilities\n## Submission Requirements","[{\"question\":\"Who should receive a copy of this completed agreement?\",\"answer\":\"A copy of the signed agreement must be submitted to the Ashfield-Colborne-Wawanosh Township’s Building Department located in Goderich, Ontario.\"},{\"question\":\"What are the primary responsibilities of the licensed hauler?\",\"answer\":\"The hauler is responsible for pumping the tank at reasonable intervals, ensuring the capacity warning device is functional, utilizing secure pump-out openings, and disposing of all pumped materials at a licensed sanitary facility.\"},{\"question\":\"What must the property owner do if they decide to change contractors?\",\"answer\":\"The owner is required to notify the Building Department directly if there is an impeding termination of the current agreement or a change in service contractors.\"}]","Maintenance Agreement - Class 5 Sewage System | PDF",1789630647]