[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-177917-105":53,"doc-detail-177917-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","lpa-construction-procurement-bid-proposal-template-certifications","LPA Construction Procurement Bid Proposal Template - Certifications","","State-funded Local Public Agency (LPA) transportation projects’ bid proposal template for construction procurement, structured into seven sections, including Scope of Work, Employment/Wage requirements, Certifications, Specifications and Standard Drawings, Insurance, and Bid Items. The document details certification elements required in the proposal package and includes supplemental guidance for bid process addenda, pre-bid and pre-construction meetings, plus core project identification fields such as state project number, completion dates, and bid security requirements.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/lpa-construction-procurement-bid-proposal-template-certifications/177917/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/lpa-construction-procurement-bid-proposal-template-certifications/177917.png","ImageObject",442,249,{"name":88,"@type":89},"Miles","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-23","2026-09-02",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",8,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What sections does the LPA construction bid proposal template include?","Question",{"text":109,"@type":110},"The template is organized into seven sections: Scope of Work, Employment/Wage and Record Requirements, Certifications, Specifications and Standard Drawings, Insurance, Bid Items, plus supporting template guidance.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"Which certifications are listed under Part III (Certifications)?",{"text":114,"@type":110},"Part III includes the Executive Branch Code of Ethics, certification regarding KRS 45A.485, non-collusion certification, certification of bid proposal, and a required affidavit for bidders.",{"name":116,"@type":107,"acceptedAnswer":117},"What information must the LPA or its representative provide in the template?",{"text":118,"@type":110},"Information the LPA or its representative must provide is highlighted in yellow, covering project identification and bid/proposal inputs included throughout the template.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},177917,1788329621,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":126,"read_time":141},13056703019404,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Construction Bid Proposal Template for\nState-funded Local Public Agency (LPA) Transportation Projects\nThe following document is an example template that LPAs may use to develop the bid proposal for their State-aid construction project. The template has seven sections:\nScope of Work\nEmployment, Wage and Record Requirements\nCertifications\nSpecifications and Standard Drawings\nInsurance\nBid Items\nThe template is provided in Microsoft Office Word format allowing the LPA full editing flexibility.\nInformation that the LPA or its representative must provide are highlighted in yellow.\nThe following descriptions are items not covered by the template that the LPA may choose to include as part of the project process:\nAdditive or Deductive Alternates: Alternate bidding is a technique that may be used by owner-agencies to achieve maximum project scope within available budget. Under this procedure, the owner-agency defines its critical project scope components as the “base” and defines specific additional components as ‘alternates’ which will be added to the base in a pre-defined order to establish the low bid. The contract would be awarded to the bidder providing the maximum scope within the budget. While this alternative bidding method is considered to be non-traditional, when implemented in a fair and transparent manner, it is consistent with the competitive bidding principles in 23 U.S.C. 112, and therefore, does not need SEP-14 approval. The owner-agency must clearly define the priority order in which the alternatives will be considered and added to the base. Additionally, the bid documents may establish whether the bid prices for unselected alternates will apply should the owner-agency receive additional funds for the contract. For a deductive alternate contract, the predefined alternate packets will be deducted from the base in a predefined order in a contract that fits the budget. The LPA should work with KYTC when electing to include alternate bidding language in its bid proposal.\nHold Harmless Clause: A hold harmless clause is a waiver of liability in a contract between parties whereby “one or both parties agree not to hold the other party responsible for any loss, damage, or legal liability that may arise under the agreement.” The LPA should work with KYTC when electing to include such a clause in its bid proposal.\nPre-Bid Meeting: This is a meeting that clarifies any concerns bidders may have with the bid documents, scope of work, and other detailed requirements. Information to bidders about a mandatory or non-mandatory pre-bid meeting would be mentioned in the solicitation documents (postings, advertisements, etc).\nPre-Construction Meeting: A pre-construction meeting provides an opportunity to communicate the requirements of a construction project to the selected contractor. This meeting would allow for review and discussion of implementation procedures, specifications, and material requirements including testing. Requiring this meeting prior to construction work beginning, will help to ensure that all parties involved fully understand the goals and objectives for the project and the expected construction requirements to achieve them.\nLPA Name\n(optional-add city seal)\nXXX COUNTY\nSTATE PROJECT NUMBER: XXX\nKYTC ITEM NUMBER: X-XXX\nDESCRIPTION/PROJECT NAME: XXX\nWORK TYPE: XXX\nPRIMARY COMPLETION: XXX\nLETTING DATE: XXX\nSealed Bids will be received until 10:00 AM/PM EASTERN/CENTRAL DAYLIGHT TIME MMM DD, 20YY. Bids will be publicly opened and announced at 10:00 AM/PM EASTERN/CENTRAL DAYLIGHT TIME.\nPLANS AVAILABLE FOR THIS PROJECT.\nREQUIRED BID PROPOSAL GUARANTY: Not less than 5% of the total bid.\n\u000fTABLE OF CONTENTS\nPART I SCOPE OF WORK\nProject(s) & Completion Date(s)\nContract Notes\nStandard Specification Provisions\nVendor Document Disclosure\nPART II EMPLOYMENT, WAGE AND RECORD REQUIREMENTS\nEmployment Requirements (KRS 344)\nKentucky Equal Employment Opportunity Act\nProject Wage Rates\nPART III CERTIFICATIONS\nExecutive Branch Code of Ethic","cbCaiph3wg10Kxu4","https://ap.wps.com/l/cbCaiph3wg10Kxu4","docx",734636,38,"English","# PART III CERTIFICATIONS\n## Executive Branch Code of Ethics\n## Certification Regarding KRS 45A.485\n## Non-Collusion Certification\n## Certification of Bid Proposal\n## Required Affidavit for Bidders","[{\"question\":\"What sections does the LPA construction bid proposal template include?\",\"answer\":\"The template is organized into seven sections: Scope of Work, Employment/Wage and Record Requirements, Certifications, Specifications and Standard Drawings, Insurance, Bid Items, plus supporting template guidance.\"},{\"question\":\"Which certifications are listed under Part III (Certifications)?\",\"answer\":\"Part III includes the Executive Branch Code of Ethics, certification regarding KRS 45A.485, non-collusion certification, certification of bid proposal, and a required affidavit for bidders.\"},{\"question\":\"What information must the LPA or its representative provide in the template?\",\"answer\":\"Information the LPA or its representative must provide is highlighted in yellow, covering project identification and bid/proposal inputs included throughout the template.\"}]","LPA Construction Procurement Bid Proposal Template - Certifications | DOCX",13]