[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-165060-en":3,"doc-seo-165060-105":30,"detail-sidebar-cat-1-en-105":93},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},165060,687207024643,"Rhys","https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2",1,11,"Presentations","Lithium-ion Battery Storage Technical Specifications - Abbreviations and Acronyms","Procurement-ready technical guidance for acquiring lithium-ion battery energy storage systems (BESS), written as a customizable template for federal agencies. It clarifies that procurement actions must be reviewed by contracting and legal staff and tailored to agency authorities and project specifics. The document provides drafting instructions, delete-before-solicitation requirements, and a structured table of contents covering applicable requirements, engineering and construction, inspections and commissioning, and final acceptance.","Lithium-ion Battery Storage Technical Specifications\nDISCLAIMER\nThis technical specification is intended as a resource only. It is the responsibility of Government staff to ensure that all procurements follow all applicable federal requirements and agency-specific policies and procedures. All procurement must be thoroughly reviewed by agency contracting and legal staff and should be modified to address each agency's unique acquisition process, agency-specific authorities, and project-specific characteristics.\nINSTRUCTIONS FOR USING THIS DOCUMENT\nThis document is meant to be used as a customizable template for federal government agencies seeking to procure lithium-ion battery energy storage systems (BESS). Agencies are encouraged to add, remove, edit, and/or change any of the template language to fit the needs and requirements of the agency.\nSections that provide options for the drafter are presented in (blue parentheses). Fill-in-the-blank areas are indicated in [red brackets].\nIMPORTANT: The following items must be deleted from the template before solicitation:\nThis title page and instructions for using this specification;\nAll instructions, options, and background information within the template in blue or red font as well as any parentheses or brackets around instructions\n\u0003Table of Contents\n\u0013 TOC \\o \"1-3\" \\h \\z \\u \u0014\u0013 HYPERLINK \\l \"_Toc101353607\" \u0014Abbreviations and Acronyms\t\u0013 PAGEREF _Toc101353607 \\h \u00142\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353608\" \u00141.\tGenerally Applicable Requirements\t\u0013 PAGEREF _Toc101353608 \\h \u00143\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353609\" \u00141.1\tInstall Battery Energy Storage System (BESS)\t\u0013 PAGEREF _Toc101353609 \\h \u00143\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353610\" \u00141.2\tExisting Feasibility Studies and Engineering Studies Done by Others\t\u0013 PAGEREF _Toc101353610 \\h \u00143\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353611\" \u00141.3\tCodes, Standards, and Regulations\t\u0013 PAGEREF _Toc101353611 \\h \u00144\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353612\" \u00141.4\tInterconnection to Electrical Distribution Systems\t\u0013 PAGEREF _Toc101353612 \\h \u00145\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353613\" \u00141.5\tWork Planning\t\u0013 PAGEREF _Toc101353613 \\h \u00145\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353614\" \u00141.6\tPermits and Licensing\t\u0013 PAGEREF _Toc101353614 \\h \u00145\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353615\" \u00141.7\tLocal Fire Marshall Involvement\t\u0013 PAGEREF _Toc101353615 \\h \u00145\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353616\" \u00141.8\tFederal, State, and Local Rebates and Incentives\t\u0013 PAGEREF _Toc101353616 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353617\" \u00142.\tEngineering and Construction\t\u0013 PAGEREF _Toc101353617 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353618\" \u00142.1\tBESS Project Description\t\u0013 PAGEREF _Toc101353618 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353619\" \u00142.2\tPerformance (Incorporate use cases listed as items 1(3 below)\t\u0013 PAGEREF _Toc101353619 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353620\" \u00142.3\tThermal Management\t\u0013 PAGEREF _Toc101353620 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353621\" \u00142.4\tArc Flash and Coordination Studies\t\u0013 PAGEREF _Toc101353621 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353622\" \u00142.5\tProfessional Engineer and Licensed Design Professionals\t\u0013 PAGEREF _Toc101353622 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353623\" \u00142.6\tRegistration Seals\t\u0013 PAGEREF _Toc101353623 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353624\" \u00142.7\tCoordination of Professional Services\t\u0013 PAGEREF _Toc101353624 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353625\" \u00142.8\tCoordination of Subcontractors’ Credentials\t\u0013 PAGEREF _Toc101353625 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353626\" \u00142.9\tModifications and Alterations of Government Property\t\u0013 PAGEREF _Toc101353626 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353627\" \u00142.10\tGrounding\t\u0013 PAGEREF _Toc101353627 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353628\" \u00142.11\tStructural\t\u0013 PAGEREF _Toc101353628 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353629\" \u00142.12\tConduit and Preventing Water Intrusion\t\u0013 PAGEREF _Toc101353629 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353630\" \u00142.13\tLocating Equipment\t\u0013 PAGEREF _Toc101353630 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353631\" \u00142.14\tExpected Service Life\t\u0013 PAGEREF _Toc101353631 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc101353632\" \u00142.15\tSite Service Conditions\t\u0013 PAGEREF _Toc101353632 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK ","cbCairhmd1uCIFWC","https://ap.wps.com/l/cbCairhmd1uCIFWC","docx",81386,14,"English","en",105,"# Abbreviations and Acronyms\n# Generally Applicable Requirements\n## Install Battery Energy Storage System (BESS)\n## Existing Feasibility Studies and Engineering Studies Done by Others\n## Codes, Standards, and Regulations\n## Interconnection to Electrical Distribution Systems\n## Work Planning\n## Permits and Licensing\n## Local Fire Marshall Involvement\n## Federal, State, and Local Rebates and Incentives\n# Engineering and Construction\n## BESS Project Description\n## Performance\n## Thermal Management\n## Arc Flash and Coordination Studies\n## Professional Engineer and Licensed Design Professionals\n## Registration Seals\n## Coordination of Professional Services\n## Coordination of Subcontractors’ Credentials\n## Modifications and Alterations of Government Property\n## Grounding\n## Structural\n## Conduit and Preventing Water Intrusion\n## Locating Equipment\n## Expected Service Life\n## Site Service Conditions\n## New Equipment\n## Markings (Labeling)\n## Battery Warranties\n## Operations and Maintenance\n## Data Acquisition and Monitoring\n## BESS Safety\n## Severe Weather\n# Inspections and Commissioning\n## Commissioning\n## Inspections\n## Summary of Process\n# Final Acceptance","[{\"question\":\"What is the purpose of this document when procuring a lithium-ion BESS?\",\"answer\":\"It serves as a customizable specification template for federal government agencies seeking to procure lithium-ion battery energy storage systems, with instructions to tailor template language to agency and project needs.\"},{\"question\":\"What drafting placeholders and template elements must be handled before solicitation?\",\"answer\":\"Options for the drafter appear in blue parentheses, fill-in-the-blank areas use red brackets, and several template sections—including the title page and all blue/red instructions and background information—must be deleted before solicitation.\"},{\"question\":\"Which topics are covered in the technical specification’s structure?\",\"answer\":\"The specification organizes requirements into generally applicable requirements, engineering and construction, inspections and commissioning, and final acceptance, including areas like interconnection, thermal management, safety, monitoring, and severe weather clauses.\"}]","Lithium-ion Battery Storage Technical Specifications - Abbreviations and Acronyms | DOCX",1788165572,5,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":88,"head_meta":90,"extra_data":92,"updated_unix":28},"lithium-ion-battery-storage-technical-specifications-abbreviations-and-acronyms","",{"@graph":36,"@context":87},[37,54,70],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/template/","Template",2,{"item":49,"name":13,"@type":43,"position":50},"https://docshare.wps.com/template/presentations/",3,{"item":52,"name":14,"@type":43,"position":53},"https://docshare.wps.com/template/lithium-ion-battery-storage-technical-specifications-abbreviations-and-acronyms/165060/",4,{"url":52,"name":14,"@type":55,"author":56,"headline":14,"publisher":58,"fileFormat":61,"inLanguage":23,"description":15,"dateModified":62,"datePublished":63,"encodingFormat":61,"isAccessibleForFree":64,"interactionStatistic":65},"DigitalDocument",{"name":9,"@type":57},"Person",{"url":41,"name":59,"@type":60},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-05","2026-08-31",true,{"@type":66,"interactionType":67,"userInteractionCount":69},"InteractionCounter",{"@type":68},"ViewAction",6,{"@type":71,"mainEntity":72},"FAQPage",[73,79,83],{"name":74,"@type":75,"acceptedAnswer":76},"What is the purpose of this document when procuring a lithium-ion BESS?","Question",{"text":77,"@type":78},"It serves as a customizable specification template for federal government agencies seeking to procure lithium-ion battery energy storage systems, with instructions to tailor template language to agency and project needs.","Answer",{"name":80,"@type":75,"acceptedAnswer":81},"What drafting placeholders and template elements must be handled before solicitation?",{"text":82,"@type":78},"Options for the drafter appear in blue parentheses, fill-in-the-blank areas use red brackets, and several template sections—including the title page and all blue/red instructions and background information—must be deleted before solicitation.",{"name":84,"@type":75,"acceptedAnswer":85},"Which topics are covered in the technical specification’s structure?",{"text":86,"@type":78},"The specification organizes requirements into generally applicable requirements, engineering and construction, inspections and commissioning, and final acceptance, including areas like interconnection, thermal management, safety, monitoring, and severe weather clauses.","https://schema.org",{"og:url":52,"og:type":89,"og:title":14,"og:site_name":59,"og:description":15},"article",{"robots":91,"canonical":52},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":94},[95,98,103,107,112,117,122,127,131],{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":96,"slug":97},90,"presentations",{"id":99,"doc_module":11,"doc_module_name":46,"category_name":100,"show_sort_weight":101,"slug":102},12,"Resumes",80,"resumes",{"id":21,"doc_module":11,"doc_module_name":46,"category_name":104,"show_sort_weight":105,"slug":106},"Invoices",70,"invoices",{"id":108,"doc_module":11,"doc_module_name":46,"category_name":109,"show_sort_weight":110,"slug":111},15,"Posters",60,"posters",{"id":113,"doc_module":11,"doc_module_name":46,"category_name":114,"show_sort_weight":115,"slug":116},16,"Social Media",50,"social-media",{"id":118,"doc_module":11,"doc_module_name":46,"category_name":119,"show_sort_weight":120,"slug":121},17,"Forms",40,"forms",{"id":123,"doc_module":11,"doc_module_name":46,"category_name":124,"show_sort_weight":125,"slug":126},18,"Letters",30,"letters",{"id":128,"doc_module":11,"doc_module_name":46,"category_name":129,"show_sort_weight":29,"slug":130},21,"Paper Templates","papers-templates",{"id":132,"doc_module":11,"doc_module_name":46,"category_name":133,"show_sort_weight":4,"slug":134},158,"General","general-158"]