[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-285703-105":53,"doc-detail-285703-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","lincoln-county-service-utility-will-serve-form","Lincoln County Service Utility Will Serve Form","","This document serves as the official Service Utility 'will serve' application form for the Lincoln County Planning and Building Department in Nevada. It is required for both commercial buildings and residential dwellings to ensure that necessary utility services, such as culinary water, sanitary sewer, electric power, and telephone, are approved by the respective local providers before a building permit can be issued. The form includes specific contact information for utility service providers in various areas, including Alamo, Panaca, Pioche, and Rachel. Applicants must provide details about their project, including APN, site location, and construction type, while utility providers must verify service availability through signature. This process facilitates essential infrastructure coordination, ensuring that new developments in Lincoln County meet all regulatory utility requirements prior to the commencement of construction activities, thereby maintaining safety and operational standards.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/lincoln-county-service-utility-will-serve-form/285703/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/lincoln-county-service-utility-will-serve-form/285703.png","ImageObject",442,249,{"name":88,"@type":89},"8796093062539","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-22","2026-09-17",true,{"@type":98,"interactionType":99,"userInteractionCount":47},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of the 'Will Serve' form?","Question",{"text":108,"@type":109},"The form is required by the Lincoln County Planning and Building Department to obtain signed approval from utility service providers before building permits can be issued for commercial or residential projects.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What information must the applicant provide on the form?",{"text":113,"@type":109},"The applicant must provide their name, phone number, mailing address, the assessor's parcel number (APN), the construction site's physical address, and the type of building or utility service requested.",{"name":115,"@type":106,"acceptedAnswer":116},"Who is responsible for signing the utility verification section?",{"text":117,"@type":109},"The local entity responsible for providing the specific utility (such as culinary water, sanitary sewer, electric power, or telephone) must sign the form to indicate their capacity to serve the proposed construction location.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},285703,1790865411,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":60,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":129,"file_id":130,"file_url":131,"file_type":132,"file_size":133,"view_count":47,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":134,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":135,"faqs":136,"seo_title":137,"seo_description":61,"update_tm":138,"read_time":4},8796093062539,"Lincoln County Planning and Building Department  \n181 Main Street PO Box 329 Pioche, Nevada 89043  \n Phone 775 962 8071 Fax 775 962 5877  \nService Utility ‘will serve’ Form  \nFor commercial buildings and residential dwellings, the Lincoln County Planning and Building Department requires signed approval from entities providing service utilities before building permits are issued.  \nAPPLICANT  \nName:   APN:   Phone:   Mailing Address:   Town:    \nPhysical Address (construction site)   Town:   Residential Dwelling  Manufactured Home  Commercial Building   Private Well  Septic  Description:    \nPlease have the local entity responsible for the applicable utilities sign below indicating service to the proposed construction location. “Will Serve” letters may also be attached.  \nUTILITY PROVIDER SIGNATURE DATE  \nCulinary Water:     Sanitary Sewer:      \nElectric Power:      \nTelephone:     Comments:    \n_________________________________________________________________________________________________________________________  \nAlamo  \nAlamo Sewer and Water………………(775) 725-3377  \nAlamo Power District \\#3……………... (775) 725-3335  \nPanaca  \nPanaca Farmstead Association…….. (775) 728-4282  \nLincoln County Power District \\#1…(775) 962-5122  \nPioche  \nPioche Public Utilities………………….. (775) 962-5840  \nRachel  \nLincoln County Power District \\#1…(775) 962-5122  \nOther Areas  \nLincoln County Power District \\#1…(775) 962-5122  \nBUILDING DEPARTMENT USE  \nApproved by:    \nDate:    \nBuilding Permit \\#  Notes:   \n_______________________________  \n_______________________________","cbCairq0YRoDt0rb","https://ap.wps.com/l/cbCairq0YRoDt0rb","pdf",290739,"English","# Applicant Information\n## Utility Provider Verification\n## Utility Contact Directory\n## Building Department Use","[{\"question\":\"What is the purpose of the 'Will Serve' form?\",\"answer\":\"The form is required by the Lincoln County Planning and Building Department to obtain signed approval from utility service providers before building permits can be issued for commercial or residential projects.\"},{\"question\":\"What information must the applicant provide on the form?\",\"answer\":\"The applicant must provide their name, phone number, mailing address, the assessor's parcel number (APN), the construction site's physical address, and the type of building or utility service requested.\"},{\"question\":\"Who is responsible for signing the utility verification section?\",\"answer\":\"The local entity responsible for providing the specific utility (such as culinary water, sanitary sewer, electric power, or telephone) must sign the form to indicate their capacity to serve the proposed construction location.\"}]","Lincoln County Service Utility Will Serve Form | PDF",1789630218]