[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-283498-105":53,"doc-detail-283498-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","laboratory-procurement-quality-assurance-requirements-form-lpqar-may-2017","Laboratory Procurement Quality Assurance Requirements Form LPQAR - May 2017","","Laboratory Procurement Quality Assurance Requirements Form LPQAR (May 2017) defines quality assurance controls for BMPC buyer purchase orders. The supplier must comply with QA clauses invoked in the PO and apply them in addition to other QA requirements in drawings or ordering documents. It covers independent inspection functions, submission and approval of an Inspection Point Plan with hold points, special processes quality planning, supplier responsibility for lower-tier suppliers, and certification through Certified Material Test Reports.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/laboratory-procurement-quality-assurance-requirements-form-lpqar-may-2017/283498/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/laboratory-procurement-quality-assurance-requirements-form-lpqar-may-2017/283498.png","ImageObject",442,249,{"name":88,"@type":89},"Sophia Brooks","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-30","2026-09-17",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",10,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is required for final acceptance inspections under QA Clause 1?","Question",{"text":109,"@type":110},"Final acceptance inspections or tests must be performed by personnel other than those who produced the characteristics under review. Inspection and test results must be submitted for Buyer information.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What does the Inspection Point Plan require and when must it be submitted?",{"text":114,"@type":110},"The supplier must submit an Inspection Point Plan for Buyer approval before start of manufacture or fabrication. It must reference applicable drawings and revisions and cover operations from starting material through preparation for shipment, including lower-tier inspections.",{"name":116,"@type":107,"acceptedAnswer":117},"How does the supplier manage lower-tier suppliers under QA Clause 4?",{"text":118,"@type":110},"The supplier must maintain a system ensuring lower-tier materials, equipment, and services conform to Buyer PO requirements. This includes selection of qualified suppliers, passing down PO requirements, quality surveillance and verification, review of test and qualification documentation, and feedback/correction of non-conformances.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},283498,1790339394,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":142},962084925636,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","Laboratory Procurement Quality Assurance Requirements  \nForm LPQAR May 2017  \nLaboratory Procurement Quality Assurance Requirements Form LPQAR  \nMay 2017  \nPage 2  \nLABORATORY PROCUREMENT QUALITY ASSURANCE  \nREQUIREMENTS  \nThis document establishes quality assurance (QA) controls applicable to BMPC (Buyer) purchase orders (POs) . The Supplier is responsible for complying with the clauses of this document which are specifically invoked by the PO. These requirements may be in addition to other QA controls included in drawings, technical ordering requirements, etc. , identified elsewhere in the PO. In the event thereis a conflict between the QA clauses invoked in the order, and the other QA controls which may be included in the PO, the “Order of Precedence” article of the General Provisions shall apply.  \nQA Clause 1- Independent Inspection Function  \nFinal acceptance inspections or tests to verify product acceptability shall be performed by personnel other than those who produced the characteristics under review. The Supplier shall perform or have performed all of the inspections and tests necessary to substantiate product conformance with the applicable drawings, specifications, and PO requirements for all items supplied as part of this order, and for all characteristics of those items. Characteristics include any dimensional, visual, functional, mechanical, electrical, chemical, physical, or material feature or property of the products. The results of inspections shall be submitted for Buyer information.  \nQA Clause 2- Inspection Point Plan  \nAn Inspection Point Plan (which may be included as part of a process outline, manufacturing, or fabrication procedure) which the Supplier and their lower-tier suppliers will follow to ensure the PO requirements will be met, shall be submitted to the Buyer for approval prior to start of manufacture or fabrication. The Inspection Point Plan shall reference drawings and other documents (including applicable revisions) used to prepare the plan and shall cover all operations from starting material through final preparation for shipment or release, including applicable lower-tier Suppliers’inspections.  \nPartial Inspection Point Plan submittals are authorized provided continuity of the total Inspection Point Plan is preserved through explicit identification (tie-in) on subsequent submittals. Each inspection operation identified in the Inspection Point Plan shall indicate the stage of manufacture or fabrication where the inspection operation is to be performed. All inspections which are final acceptance inspections in preparation for shipment shall be indicated by a symbol or other appropriate method.  \nAfter receipt of the Inspection Point Plan and within 10 business days, the Buyer will provide the Supplier with written communication regarding the additional inspections and tests that the Buyer plans to perform during the manufacturing/fabrication process; or the inspections and tests performed by the Supplier (or the Supplier’s lower-tier supplier[s]) that the Buyer intends to witness. These hold points may not be bypassed by the Supplier without written Buyer authorization. When requested by the Buyer, the Supplier shall arrange for and accompany the Buyer’s representative(s) to the Supplier's involved lower-tier suppliers’ facilities.  \nLaboratory Procurement Quality Assurance Requirements Form LPQAR  \nMay 2017  \nPage 3  \nQA Clause 3-Special Processes Quality Plan  \nA Special Process Quality Plan shall be established by the Supplier to define the specific actions that will be taken to meet the quality requirements related to special processes (e.g. , welding, brazing, plating, cleanliness, detrimental material controls, heat treating, hard facing, nondestructive testing [NDT], electric discharge machining, electric chemical machining) invoked by the PO. The plan shall be submitted to the Buyer for approval prior to the start of manufacturing or fabrication and shall include, as a minimum, t","cbCaieWU0jzl6Fkq","https://ap.wps.com/l/cbCaieWU0jzl6Fkq","pdf",206566,19,"English","# Laboratory Procurement Quality Assurance Requirements\n## QA Clause 1- Independent Inspection Function\n## QA Clause 2- Inspection Point Plan\n## QA Clause 3 - Special Processes Quality Plan\n## QA Clause 4 - Lower-Tier Suppliers\n## QA Clause 5 - Certified Material Test Reports","[{\"question\":\"What is required for final acceptance inspections under QA Clause 1?\",\"answer\":\"Final acceptance inspections or tests must be performed by personnel other than those who produced the characteristics under review. Inspection and test results must be submitted for Buyer information.\"},{\"question\":\"What does the Inspection Point Plan require and when must it be submitted?\",\"answer\":\"The supplier must submit an Inspection Point Plan for Buyer approval before start of manufacture or fabrication. It must reference applicable drawings and revisions and cover operations from starting material through preparation for shipment, including lower-tier inspections.\"},{\"question\":\"How does the supplier manage lower-tier suppliers under QA Clause 4?\",\"answer\":\"The supplier must maintain a system ensuring lower-tier materials, equipment, and services conform to Buyer PO requirements. This includes selection of qualified suppliers, passing down PO requirements, quality surveillance and verification, review of test and qualification documentation, and feedback/correction of non-conformances.\"}]","Laboratory Procurement Quality Assurance Requirements Form LPQAR - May 2017 | PDF",1789609710,7]