[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-246871-105":53,"doc-detail-246871-en":119},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":112,"head_meta":114,"extra_data":116,"updated_unix":118},105,"en","key-project-information-project-design-document-guide-to-completing-the-form-version-v14","Key Project Information & Project Design Document - Guide to Completing the Form - Version v1.4","","Key Project Information & Project Design Document (PDD) provides structured guidance for completing a Gold Standard project form, including formatting rules, language requirements for the form and attachments, table handling, and instructions for figures, decimals, dates, and maps. It covers compliance expectations for reporting, validation timelines, selection of Gold Standard approved VVBs and methodologies, conservative assumptions, and product issuance requirements (VERs/CERs/RELs). It also defines public disclosure versus confidentiality handling, including submission in two versions for proprietary sections.",{"@graph":63,"@context":111},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/key-project-information-project-design-document-guide-to-completing-the-form-version-v14/246871/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/key-project-information-project-design-document-guide-to-completing-the-form-version-v14/246871.png","ImageObject",442,249,{"name":88,"@type":89},"Liam","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-21","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",9,{"@type":103,"mainEntity":104},"FAQPage",[105],{"name":106,"@type":107,"acceptedAnswer":108},"How does the document handle confidential or proprietary information?","Question",{"text":109,"@type":110},"Submit documentation in two versions: one with confidential/proprietary parts made illegible for public availability, and another containing full confidential/proprietary information for authorized parties. Non-confidential material is made publicly available via the Impact Registry.","Answer","https://schema.org",{"og:url":78,"og:type":113,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":115,"canonical":78},"index,follow",{"doc_id":117,"site_id":56},246871,1791721552,{"code":4,"msg":5,"data":120},{"doc_id":117,"user_id":121,"nickname":88,"user_avatar":122,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":123,"file_id":124,"file_url":125,"file_type":126,"file_size":127,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":27,"language":128,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":129,"faqs":130,"seo_title":131,"seo_description":61,"update_tm":132,"read_time":45},8796095461564,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","KEY PROJECT INFORMATION & PROJECT DESIGN DOCUMENT (PDD)  \nPUBLICATION DATE 21.06.2023 VERSION v.1 .4  \nRELATED TEMPLATE  \n– Key Project Information & Project Design Document  \nGUIDE TO COMPLETING THE FORM  \nGeneral guidance  \n1. Complete this form in English. Prepare all attached documents in English, OR a language that has been agreed upon by the project developer, the Gold Standard and the VVB.  \n2. Complete this form using the same format without modifying its font, headings or logo, and without any other alteration to the form.  \n3. Do not modify or delete tables and their columns in this form. Add rows of the tables as needed. Add additional appendices as needed.  \n4. If a section of this form is not applicable, explicitly state that the section is left blank intentionally.  \n5. Figures above one thousand shall be formatted with a comma (for example 1,000,000), and decimals will be separated by a point (for example 1.35)  \n6. Pictures, graphs, tables and supporting documents within Project Documentation shall be clearly marked with a unique ID  \n7. All Dates must be in the following format: DD/MM/YYYY  \n8. Maps, where required shall include:  \na. Name of the project  \nb. ID of the project  \nc. Legend  \nd. Printing date  \ne. Scale  \nf. Direction of North  \ng. GPS coordinate system (e.g. WGS 84)  \nh. GPS grid  \ni. Infrastructure (roads, houses, etc.) and rivers  \nj. Information on the satellite or aerial picture (date, resolutions, data source)  \nIf you have any suggestions for improvement, please email templates@sustain[cert.com](cert.com).  \nRequirements for reporting compliance  \n1. For GS4GG, a project must complete Validation (defined as the date of submission of the Validation Report) within two years of successful listing of the project.  \n2. Small scale and large-scale projects must select a Gold Standard Approved VVB approved for the chosen scope and Certification Pathway  \n3. When completing this form and designing your projects, you should initially read and comply with the 3 Mandatory GS4GG Standard Documents ( Principles and Requirements, Safeguard Principles and Requirements, Stakeholder Consultation and Engagement Requirements ) . As a general rule, these mandatory documents form a base level and reference other documents which provide more detailed, project specific requirements that must be complied with. In case of conflict, project specific requirements supersede more general ones.  \n4. You should determine which GS4GG standard documents apply to your project technology and project framework type and then comply with them – these supersede requirements in mandatory documents above. These principally include (but are not limited to) the following; Community Service Activity, Renewable Energy, Land-Use and Forests Activity Requirements (technology  \ntypes) and, possibly, Programme of Activity Requirements, Microscale  \nrequirements (framework types) .  \n5. If you want to issue Products (VERs/CERs/RELs), then you must also comply with GS4GG Product Requirements. The most popular document is GHGEmission Reductions and Sequestration which is applicable to all  \nVER/CER/Carbon credit project types.  \n6. You must also comply with all requirements in any selected GS Standard Approved methodologies (SDG Impact Quantification) .  \n7. All Gold Standard Projects must use conservative assumptions, values and procedures to ensure that claims are not overestimated.  \n8. Guidance provided in this document is based on GS4GG versions 1.2 – in the event that a rule is updated and this template doesn’t match, it is the responsibility of the developer to provide the correct information. Please use the email provided below to highlight any discrepancies.  \n9. For GS CER Label projects, please refer to relevant sections in CDM Templates where information is already supplied.  \nPublic disclosure and confidentiality  \n1. Where a PDD contains information that the project developers wish to be treated as confidential/proprietary, s","cbCaisRQecr5fttr","https://ap.wps.com/l/cbCaisRQecr5fttr","pdf",866956,"English","# Guide to Completing the Form\n## General guidance\n## Requirements for reporting compliance\n## Public disclosure and confidentiality\n## Document Sections and Appendices","[{\"question\":\"How does the document handle confidential or proprietary information?\",\"answer\":\"Submit documentation in two versions: one with confidential/proprietary parts made illegible for public availability, and another containing full confidential/proprietary information for authorized parties. Non-confidential material is made publicly available via the Impact Registry.\"}]","Key Project Information & Project Design Document - Guide to Completing the Form - Version v1.4 | PDF",1789238720]