[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-356266-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-356266-en":127},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","kennedy-space-center-lift-plan-for-construction-contractors-form-ksc-50-101v2-construction-contractor-lift-planning","Kennedy Space Center Lift Plan for Construction Contractors - Form KSC 50-101V2 - Construction Contractor Lift Planning","","Kennedy Space Center lift plan form for construction contractors outlining mandatory crane lift planning and required conditions. The form specifies when a lift plan is required (e.g., personnel hoisting, load exceeding 75% of crane capacity, multiple cranes, demolition uncertainty, power line proximity, lifts over active work areas or public roadways, submerged/partially submerged objects). It collects project, load, crane, rigging details, calculations, setup constraints, hazard considerations, and certification-based required attachments, culminating in official review and acceptance sections.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/kennedy-space-center-lift-plan-for-construction-contractors-form-ksc-50-101v2-construction-contractor-lift-planning/356266/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/kennedy-space-center-lift-plan-for-construction-contractors-form-ksc-50-101v2-construction-contractor-lift-planning/356266.png","ImageObject",442,249,{"name":42,"@type":43},"Aurelia","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-17","2026-09-23",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",6,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"When is a lift plan mandatory for Kennedy Space Center construction contractor crane work?","Question",{"text":63,"@type":64},"A lift plan is mandatory when lifting personnel with a crane, when the load exceeds 75% of the crane’s capacity in a given configuration, when more than one crane is required, during demolition if load weight or structural integrity is in doubt, near power lines within a boom length, when lifting over active work areas, occupied buildings, or public roadways, and when lifting submerged or partially submerged objects.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What key information must be provided to complete the lift plan?",{"text":68,"@type":64},"The form collects preparer name and signature, company, date, project name and location, load description and weight breakdown, crane description (type/manufacturer/model), crane setup parameters (boom configuration/length/angles, radius, capacity), and rigging details including sling/hitch configuration and total rigging weights.",{"name":70,"@type":61,"acceptedAnswer":71},"What documents and attachments are required with the lift plan submission?",{"text":72,"@type":64},"Required attachments include load placement diagrams, rigging diagrams showing sling angles and expected loads and load CG, photocopies of actual load charts used to calculate crane capacity, rigging certifications and rigging load limit charts (SWL), crane certification (annual/daily checklist), operator certification, rigger qualification documents, narrative of lift procedures, and the source of load weight.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},356266,1791213122,{"code":4,"msg":82,"data":83},"success",[84,89,94,99,104,109,113,118,123],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":86,"show_sort_weight":87,"slug":88},11,"Presentations",90,"presentations",{"id":90,"doc_module":22,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},12,"Resumes",80,"resumes",{"id":95,"doc_module":22,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},14,"Invoices",70,"invoices",{"id":100,"doc_module":22,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},15,"Posters",60,"posters",{"id":105,"doc_module":22,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},16,"Social Media",50,"social-media",{"id":110,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":111,"slug":112},17,40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},21,"Paper Templates",5,"papers-templates",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":125,"show_sort_weight":4,"slug":126},158,"General","general-158",{"code":4,"msg":82,"data":128},{"doc_id":79,"user_id":129,"nickname":42,"user_avatar":130,"doc_module":22,"category_id":110,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":33,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":26},1099514068365,"https://ap-avatar.wpscdn.com/avatar/10000253d8d9f28188e?_k=1776742907772140068","| Kennedy Space Center Lift Plan for Construction Contractors   |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n| This document is for use by construction contractors performing work for Kennedy Space Center.It is recommended for all lifts and will satisfy the  \u003Cbr>lift planning requirements in accordance with OSHA and NASA regulations and contract requirements.A lift plan is mandatory when:1)lifting  \u003Cbr>personnel with a crane,2)the load exceeds 75%of the crane's capacity in a given configuration,3)the lift requires more than one crane,4)during  \u003Cbr>demolition when the actual weight or structural integrity of the load are in doubt,5)when the operation is within a boom length of power lines,6)  \u003Cbr>when lifting over active work areas,occupied buildings,or public roadways,or 7)lifts of submerged or partially submerged objects.For further  \u003Cbr>assistance,please contact the KSC Institutional Safety Office at 867-SAFE.   |  |  |  |  |  |\n| Name and Signature of Person Preparing this Lift Plan  \u003Cbr>1.Company Name   |  |  |  | 2.Date   |  |\n| 3.Project Name and Job Locaton   |  |  |  |  |  |\n| 4.Load Description   |  |  |  |  |  |\n| 5.Crane Description-Type,Manufacturer,Model\\#(multiple crane ifts require separate plan for each crane)   |  |  |  |  |  |\n| 6.Lift Description (attach diagram of lit and load placement)   |  |  |  |  |  |\n| LOAD   |  |  | CRANE(continued)   |  |  |\n| 7.Load Condition (describe)   |  |  | 27.Radius at Set-down   |  | ft   |\n| 8.Known Center of Gravity?(Attach diagram)   |  |  | 28.Capacity at minimum boom angle /maximum  \u003Cbr>radius(Attach copy of actual load chart used)   |  | Ibs   |\n| 9.Source of Load Weight(attach a copy of drawings,cakculations,bl of lading,etc.)   |  |  | 29.Maximum load on crane for this lift  \u003Cbr>(Gross Load from Block 20)   |  | Ibs   |\n| 10.Load Weight Empty   |  | Ibs   | 30.Percentage of the crane's rated capacity in this  \u003Cbr>configuration   |  | %   |\n| 11.Weight of Load Contents/Fluids   |  | Ibs   | JIB/FLY   |  |  |\n| 12.Weight of Auxillary Block   |  | Ibs   | 31.  \u003Cbr>__Stored____  \u003Cbr>Stowed_____  \u003Cbr>Erected   |  |  |\n| 13.Weight of Main Block   |  | Ibs   | 32.  \u003Cbr>If jib/fly is used:Length =__             Angle =   |  |  |\n| 14.Weight of Lifting Beam (See Block 50)   |  | Ibs   | 33.Rated capacity of jib /fly from chart =   |  |  |\n|  |  |  |  |  |  |\n| 15.Weight of Slings/Shackles/Other Rigging  \u003Cbr>(See Blocks 42 thru 52)   |  | Ibs   | 34.Weight of Jib if installed but not in use   | Ibs   |  |\n| 16.Deduction for Jib/Fly(if applicable)  \u003Cbr>(See Block 34)   |  | Ibs   | CRANE SETUP/OTHER CONSIDERATIONS   |  |  |\n| 17.Weight of Hoist Rope (if applicable)   |  | Ibs   | 35.Soilconditions/level/underground hazards/Crane mat required?   |  |  |\n| 18.Weight of Auxillary Head/Rope(if applicable)   |  | Ibs   | 36.Outriggers(full /partial)/pads/matting/on rubber?  \u003Cbr>□No  \u003Cbr>Yes   |  |  |\n| 19.Additional Deductions(list if applicable)   |  | Ibs   | 37.Buildings,equpment,or structure to lift/swing over?   |  |  |\n| 20.Gross Load (Add Block 10 thru 19)   |  | Ibs   | 38.Travel required?  \u003Cbr>No  \u003Cbr>Yes   |  |  |\n| CRANE   |  |  | 39.Working quadrants/swing restrictions?   |  |  |\n| 21.Boom Configuration   |  |  | 40.High voltage /electrical hazards/other hazards?   |  |  |\n| 22.Boom Length   |  | ft   | 41.Other Considerations?(Head room,winds,taglines,trffic,etc.)Add to Block 6   |  |  |\n| 23.Counterweight   |  | Ibs   | RIGGING   |  |  |\n| 24.Boom angle at Pick-up   |  | o   | 42.Slings(number,size,type)   |  |  |\n| 25.Radius at Pick-up   |  | ft   | 43.Slings rated capacity per configuration(See Block 45)   |  |  |\n| 26.Boom angle at Set-down   |  | o   | 44.Total Weight of slings   |  | Ibs   |\n\nKSC FORM 50-101V2 NS(REV.03/11)PREVIOUS EDITIONS ARE OBSOLETE  \nPage 1 of 4  \n\n| RIGGING (continued)   |  |  | REQUIRED ATTACHMENTS   |\n| --- | --- | --- | --- |\n| 45.Hitch (vertical,basket,choker)  \u003Cbr>deg  \u003Cbr>Sling Configuration Angle   |  |  | 53.Load placement","cbCaiuYmHGWA148a","https://ap.wps.com/l/cbCaiuYmHGWA148a","pdf",494024,"English","# Mandatory Lift Plan Triggers\n## Personnel, capacity, multi-crane, demolition, and proximity rules\n# Lift Plan Preparation Information\n## Contractor, project, load, and crane details\n# Load, Crane Setup, and Rigging Calculations\n## Weight breakdowns and capacity/radius fields\n# Required Attachments and Certifications\n## Diagrams, load charts, and qualification documents\n# Submitting and NASA Review/Acceptance","[{\"question\":\"When is a lift plan mandatory for Kennedy Space Center construction contractor crane work?\",\"answer\":\"A lift plan is mandatory when lifting personnel with a crane, when the load exceeds 75% of the crane’s capacity in a given configuration, when more than one crane is required, during demolition if load weight or structural integrity is in doubt, near power lines within a boom length, when lifting over active work areas, occupied buildings, or public roadways, and when lifting submerged or partially submerged objects.\"},{\"question\":\"What key information must be provided to complete the lift plan?\",\"answer\":\"The form collects preparer name and signature, company, date, project name and location, load description and weight breakdown, crane description (type/manufacturer/model), crane setup parameters (boom configuration/length/angles, radius, capacity), and rigging details including sling/hitch configuration and total rigging weights.\"},{\"question\":\"What documents and attachments are required with the lift plan submission?\",\"answer\":\"Required attachments include load placement diagrams, rigging diagrams showing sling angles and expected loads and load CG, photocopies of actual load charts used to calculate crane capacity, rigging certifications and rigging load limit charts (SWL), crane certification (annual/daily checklist), operator certification, rigger qualification documents, narrative of lift procedures, and the source of load weight.\"}]","Kennedy Space Center Lift Plan for Construction Contractors - Form KSC 50-101V2 - Construction Contractor Lift Planning | PDF",1790124337]