[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-253656-105":3,"detail-sidebar-cat-1-en-105":80,"doc-detail-253656-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","kd-engineering-co-mechanical-engineers-and-technologists-testing-and-balancing-analysis-report","KD ENGINEERING CO. MECHANICAL ENGINEERS AND TECHNOLOGISTS TESTING AND BALANCING ANALYSIS REPORT","","This document presents a Testing and Balancing Analysis Report from KD Engineering Co., detailing the mechanical engineers and technologists' findings. The report, dated August 15, 2012, with a revision on September 26, 2012, outlines the results of tests conducted on various HVAC units, including AHUs and pumps. It specifies the configurations under which the tests were performed, such as VFDs running at 100% or 20%, and records the observed air and water temperatures, as well as static pressure set points. Additionally, it includes notes on specific equipment like RP-1, RHC-3-5, and non-staff related washrooms, documenting observations on flows and water temperatures. The report serves to certify that the fluid distribution systems referenced have been tested and balanced in compliance with project specifications, with all results and adjustments tabulated.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/general/","General",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/kd-engineering-co-mechanical-engineers-and-technologists-testing-and-balancing-analysis-report/253656/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/kd-engineering-co-mechanical-engineers-and-technologists-testing-and-balancing-analysis-report/253656.png","ImageObject",442,249,{"name":42,"@type":43},"Patrick","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-09-20","2026-09-13",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the purpose of this report?","Question",{"text":62,"@type":63},"This report presents the results of testing and balancing conducted on fluid distribution systems to ensure they meet project specifications.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What types of units were tested?",{"text":67,"@type":63},"The report covers the testing of Air Handling Units (AHUs) and various pumps (P-EH A & B, RP - 1, RHC-3-5) as part of air and water balancing procedures.",{"name":69,"@type":60,"acceptedAnswer":70},"When was this report generated and last revised?",{"text":71,"@type":63},"The original report date is August 15, 2012, and it was most recently revised on September 26, 2012.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},253656,1789268421,{"code":4,"msg":81,"data":82},"success",[83,88,93,98,103,108,113,118,123],{"id":84,"doc_module":22,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},11,"Presentations",90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":110,"show_sort_weight":111,"slug":112},17,"Forms",40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},21,"Paper Templates",5,"papers-templates",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":4,"slug":125},158,"general-158",{"code":4,"msg":81,"data":127},{"doc_id":78,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":124,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":11,"file_id":130,"file_url":131,"file_type":132,"file_size":133,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":116,"language":134,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":135,"faqs":136,"seo_title":137,"seo_description":12,"update_tm":79,"read_time":84},549758146520,"https://ap-avatar.wpscdn.com/avatar/80002397d8c0411e94?_k=1775819394049821470","cbCaip3AECHsDSCw","https://ap.wps.com/l/cbCaip3AECHsDSCw","pdf",5238470,"English","# TESTING AND BALANCING ANALYSIS REPORT\n## Certification\n## KD PROJECT #:\n## BY:\n## DATE:\n## REVISION:\n# Field Notes\n## 1. Air Balancing\n### 1.1. AHU-1\n### 1.2. AHU-2\n### 1.3. AHU-3\n### 1.4. AHU-4\n## 2. Water Balancing\n### 2.1. P-EH A & B\n### 2.2. P-EH A & B\n### 2.3. P-EH A\n### 2.4. RP - 1\n### 2.5. RHC-3-5\n### 2.6. Non-Staff Related Washrooms","[{\"question\":\"What is the purpose of this report?\",\"answer\":\"This report presents the results of testing and balancing conducted on fluid distribution systems to ensure they meet project specifications.\"},{\"question\":\"What types of units were tested?\",\"answer\":\"The report covers the testing of Air Handling Units (AHUs) and various pumps (P-EH A \\u0026 B, RP - 1, RHC-3-5) as part of air and water balancing procedures.\"},{\"question\":\"When was this report generated and last revised?\",\"answer\":\"The original report date is August 15, 2012, and it was most recently revised on September 26, 2012.\"}]","KD ENGINEERING CO. MECHANICAL ENGINEERS AND TECHNOLOGISTS TESTING AND BALANCING ANALYSIS REPORT | PDF"]