[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-377302-105":53,"doc-detail-377302-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","jd-edwards-enterpriseone-resource-assignments-asset-management-challenges-capabilities-and-value","JD Edwards EnterpriseOne Resource Assignments - Asset Management Challenges - Capabilities and Value","","JD Edwards EnterpriseOne resource assignments within capital asset management address maintenance challenges such as emergency work orders, increased asset cost pressures, and the evolution of software users. It outlines core capabilities including holistic maintenance strategy across reactive, preventive, and predictive approaches, equipment cost analysis, condition-based maintenance, and role-based workspace. The solution emphasizes reduced operating costs, optimized equipment performance, regulatory compliance, and profit-center outcomes, with end-to-end integration spanning alerts, crew scheduling, and work order management.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/jd-edwards-enterpriseone-resource-assignments-asset-management-challenges-capabilities-and-value/377302/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/jd-edwards-enterpriseone-resource-assignments-asset-management-challenges-capabilities-and-value/377302.png","ImageObject",442,249,{"name":88,"@type":89},"McQueen","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-28","2026-09-24",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",6,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What challenges does the resource assignment and asset management approach target?","Question",{"text":109,"@type":110},"It targets emergency work orders causing unanticipated downtime, increased financial pressure on asset cost of ownership, software users evolving, and issues driven by aging assets, tighter regulations, and emerging standards.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What maintenance strategies are covered in the capabilities section?",{"text":114,"@type":110},"The approach balances reactive (run to failure), preventive (time-based regular maintenance), and predictive (condition-based monitoring out of tolerance).",{"name":116,"@type":107,"acceptedAnswer":117},"How does the solution support scheduling and resource allocation?",{"text":118,"@type":110},"It provides capabilities such as equipment cost analysis, resource assignments, crew scheduling, graphical calendar views, drag-and-drop rescheduling, and verification of resource availability to support planned work execution.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},377302,1791787884,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":15,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":79},5909890329169,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","JD Edwards EnterpriseOne Resource Assignments  \nCapital Asset Maintenance Challenges  \nCHALLENGES  \n􀂾 “80% of failures are random” -resulting in emergency work orders which cause unanticipated downtime  \n􀂾 Increased financial pressureson Asset Cost of Ownership  \n􀂾 Software user is evolving  \n􀂾 Aging assets, tighter regulations and emerging standards  \nCAPABILITIES  \n􀂾Holistic Maintenance Strategy, balance of:  \n• Reactive  \n• Preventive  \n• Predictive  \n􀂾Equipment Cost Analysis, Resource Assignments and Crew Scheduling  \n􀂾Role-based workspace and portals  \n􀂾Condition-Based Maintenance  \n VALUE  \n􀂾 Reduced Operating Cost  \n􀂾 Optimized Asset / Equipment Performance  \n􀂾 Regulatory and Standards Compliance  \n􀂾 Profit-Center rather than Cost-Center  \n2  \nCopyright © 2022, Oracle and/or its affiliates. All rights reserved.  \nJD Edwards EnterpriseOne Capital Asset Management  \nSingle System, Seamless Integration  \nFINANCIAL  \nHUMAN CAPITAL  \nCRM  \nASSET MGM  \nPOJECT  \nSUPPLY CHAIN  \nTOOLS  \nASSET MGMT  \nCapital Asset MGM  \nEquipment Cost Analysis  \nCondition Based Maintenance  \nResource Assignments  \nEquipment Information Management & Billing  \nCost Rollup  \nInbound Alerts  \nCrew Scheduling  \nInstall  \nRequest  \nService  \nWork Order Mgmt and Failure Analysis  \nParent/Child Hierarchy  \n(25 levels)  \nInvestigate, Notify & Schedule Work Order  \nResource Assignments  \n3 Copyright © 2022, Oracle and/or its affiliates. All rights reserved.  \nCost/Bill  \nMaintenance Planning & Preventive Maint.  \nAnalyze by Equipment Coding  \nAlert Action Rules  \nSchedule People, Crews & Equipment  \nCAM Supports Multiple Asset Types  \nFixed Plant  \nLinear/Network Mobile/Fleet  \n4 Copyright © 2022, Oracle and/or its affiliates. All rights reserved.  \n4  \nAsset Management At-a-Glance  \n\n| Asset Strategy Planning & Execution Breakdown & Response Tracking & Compliance |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| | | | | | |  | |  |\n| • Perform total cost analysis\u003Cbr>• Develop asset & spares strategies\u003Cbr>• Establish 3 rd party relationships |  | • Create schedule\u003Cbr>• Allocate / procure materials & services\u003Cbr>• Maintain, repair, build, or dispose |  | • Identify unplanned maintenance / repair\u003Cbr>• Approve / schedule work request |  | • Track and report projects & costs\u003Cbr>• Verify compliance\u003Cbr>• Manage performance |  |  |\n\n􀂾Reactive Maintenance – Run to Failure-based – when it breaks, fix it  \n􀂾Preventive Maintenance –Time-based – prevent failures with regular maintenance  \n􀂾Predictive Maintenance – Condition-based – monitor for out of tolerance  \n􀂃 Today, maintenance is expected to contribute to the strategic goals.  \n􀂃 Equipment downtime costs companies lost revenue!  \n􀂃 A world class maintenance organization needs all three strategies.  \n5 Copyright © 2022, Oracle and/or its affiliates. All rights reserved.  \nStaff Utilization  \n\n|  |  |  |\n| --- | --- | --- |\n|  | 􀂾 Graphical calendar view of scheduled res\u003Cbr>􀂾 Drag and drop rescheduling\u003Cbr>􀂾 Visual indicators for over or underutilizat\u003Cbr>􀂾 Contextual navigation to key applications | ource assignmention |\n\n6  \nCopyright © 2022, Oracle and/or its affiliates. All rights reserved.  \nDaily Resource Assignments  \n7  \nCopyright © 2022, Oracle and/or its affiliates. All rights reserved.  \n| \u003Cbr>\u003Cbr>\u003Cbr>􀀹\u003Cbr>􀀹 |  |\n| --- | --- |\n|  | 􀀹 Assign work to the schedule |\n|  |  |\n|  | Assign resources to the work |\n|  |  |\n|  | Verify availability of resource |\n|  |  |\n\nCrew Scheduling  \n\n| \u003Cbr>\u003Cbr>􀀹Assign\u003Cbr>􀀹Assign\u003Cbr>􀀹Verif |  |\n| --- | --- |\n|  | work to the schedule |\n|  |  |\n|  | crews to the work |\n|  |  |\n|  | y availability of the crew |\n|  |  |\n\n8  \nCopyright © 2022, Oracle and/or its affiliates. All rights reserved.  \nThe Benefits of Condition-Based Maintenance  \nRight Resource for the Right Job  \n􀁷Need for additional training decreases  \n􀁷Reduces work-related injuries  \n􀁷Employee performance levels increase  \n􀁷Assigned equipment not pushed beyond limits  \nSimplify Sche","cbCaibp1iBIs5rbs","https://ap.wps.com/l/cbCaibp1iBIs5rbs","pdf",823823,"English","# Asset Management Challenges\n## Challenges\n## Capabilities\n## Value\n# Capital Asset Management System Overview\n## Financial, Human Capital, CRM, and Asset Mgmt\n## Tools and Core Functions\n# Asset Management At-a-Glance\n## Strategy Planning, Execution, Tracking, Compliance\n## Maintenance Types\n# Staff Utilization and Daily Resource Assignments\n## Staff Utilization\n## Daily Resource Assignments\n# Crew Scheduling\n## Crew Scheduling Workflow\n# Benefits of Condition-Based Maintenance\n## Right Resource for the Right Job\n## Simplify Scheduling\n## Optimize Capacity\n# Product Areas for Maintenance Management","[{\"question\":\"What challenges does the resource assignment and asset management approach target?\",\"answer\":\"It targets emergency work orders causing unanticipated downtime, increased financial pressure on asset cost of ownership, software users evolving, and issues driven by aging assets, tighter regulations, and emerging standards.\"},{\"question\":\"What maintenance strategies are covered in the capabilities section?\",\"answer\":\"The approach balances reactive (run to failure), preventive (time-based regular maintenance), and predictive (condition-based monitoring out of tolerance).\"},{\"question\":\"How does the solution support scheduling and resource allocation?\",\"answer\":\"It provides capabilities such as equipment cost analysis, resource assignments, crew scheduling, graphical calendar views, drag-and-drop rescheduling, and verification of resource availability to support planned work execution.\"}]","JD Edwards EnterpriseOne Resource Assignments - Asset Management Challenges - Capabilities and Value | PDF",1790224171]