[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-250499-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-250499-en":127},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","interior-remodeling-proposal-sample","Interior Remodeling Proposal - Sample","","Interior remodeling proposal detailing general and administrative services and room-by-room scope for renovation. It specifies dust protection, site preparation, trash removal, insurance coverage, final cleaning, and neighbor courtesy letters, along with work hours and approval rules. The plan covers kitchen and butler’s pantry updates, nook lighting and wiring changes, wet bar backsplash and fixture replacements, hall/powder bath demo and shower/vanity installation, master bath mirror and lighting upgrades, and wall finish preparation for faux finishes, supported by an itemized budget and estimated 5–6 week duration.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/letters/","Letters",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/interior-remodeling-proposal-sample/250499/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/interior-remodeling-proposal-sample/250499.png","ImageObject",442,249,{"name":42,"@type":43},"McGucket","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-20","2026-09-12",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",7,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What general responsibilities are included in the proposal?","Question",{"text":63,"@type":64},"The proposal includes project supervision, dust protection and site preparation, trash removal and progress clean-up, general liability insurance coverage, and final cleaning of work areas. It also includes sending “pardon or dust” courtesy letters to surrounding neighbors before start.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What are the kitchen and butler’s pantry scope items?",{"text":68,"@type":64},"Work includes removing existing tile backsplashes, vent hood, and sink faucet, then installing new subway tile backsplashes with a herringbone accent behind the cooktop. It also adds or replaces lighting with LED strips, installs under-counter LED lighting at the butler pantry, and updates drawer guides and related components.",{"name":70,"@type":61,"acceptedAnswer":71},"How long is the remodel expected to take and how are start dates determined?",{"text":72,"@type":64},"The anticipated duration is 5–6 weeks. Product selections must be made before confirming a start date, and the start date depends on product availability and lead times.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},250499,1790193084,{"code":4,"msg":82,"data":83},"success",[84,89,94,99,104,109,114,118,123],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":86,"show_sort_weight":87,"slug":88},11,"Presentations",90,"presentations",{"id":90,"doc_module":22,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},12,"Resumes",80,"resumes",{"id":95,"doc_module":22,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},14,"Invoices",70,"invoices",{"id":100,"doc_module":22,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},15,"Posters",60,"posters",{"id":105,"doc_module":22,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},16,"Social Media",50,"social-media",{"id":110,"doc_module":22,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},17,"Forms",40,"forms",{"id":115,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":116,"slug":117},18,30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},21,"Paper Templates",5,"papers-templates",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":125,"show_sort_weight":4,"slug":126},158,"General","general-158",{"code":4,"msg":82,"data":128},{"doc_id":79,"user_id":129,"nickname":42,"user_avatar":130,"doc_module":22,"category_id":115,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":121,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":26},1236954412713,"https://us-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Date  \nProspect Name  \nAddress  \nInterior Remodeling Proposal  \nGeneral & Administrative  \n􀁸 Project supervision  \n􀁸 Dust protection & site preparation (add Build Clean filtration system during remodeling to control dust)  \n􀁸 Trash removal & progress clean-up (small dumpster in driveway)  \n􀁸 General liability insurance coverage  \n􀁸 Final cleaning of work areas  \n􀁸 Send “pardon or dust” courtesy letters to surrounding neighbors prior to start  \n􀁸 Agreed working hours are 8am to 5pm M-F. (after-hours and weekend work must be approved in advance by owner)  \nKitchen & Butler’s Pantry  \n􀁸 Remove existing tile backsplashes  \n􀁸 Remove vent hood  \n􀁸 Remove sink faucet  \n􀁸 Furnish & install new subway tile backsplashes with herringbone accent behind cooktop  \n􀁸 Furnish & install new stainless steel vent hood ( Price allowance provided)  \n􀁸 Furnish & install new sink faucet with pull-out sprayer ( Price allowance provided)  \n􀁸 Replace kitchen under-counter cabinet lighting with LED strips  \n􀁸 Add under-counter LED cabinet lighting at butler pantry  \n􀁸 Add garbage disposal air switch  \n􀁸 Replace drawer guides with new full-extension guides  \n􀁸 Replace crown molding at north elevation as required for new hood  \n12740 Hillcrest Road, Suite 267 Dallas, Texas 75230 Phone: 214-495-7200 Fax 214-495-7201  \n[capitalrenovationsgroup.com](capitalrenovationsgroup.com)  \nNook  \n􀁸 Remove existing chandelier  \n􀁸 Move electrical box to center over table  \n􀁸 Repair drywall & paint ceiling  \n􀁸 Install new “owner provided” chandelier  \nWet Bar  \n􀁸 Remove existing tile backsplashes  \n􀁸 Remove bar sink faucet  \n􀁸 Furnish & install new glass tile backsplash ( Price tile material allowance provided)  \n􀁸 Furnish & install new bar sink & faucet ( Price allowance provided)  \n􀁸 Replace under-counter ice maker with refrigerator (wine chiller remains)  \n􀁸 Add cabinet interior lighting at glass shelving with LED strips  \nHall/Powder Bath  \n􀁸 Demo bathtub & tile wall surround  \n􀁸 Demo floor tile  \n􀁸 Demo vanity cabinet and countertop  \n􀁸 Remove plumbing fixtures  \n􀁸 Remove decorative lighting fixtures, mirrors & bath hardware  \n􀁸 Remove bead-board wainscot paneling  \n􀁸 Repair & re-finish drywall to smooth finish (for wallpaper)  \n~~􀁸 ~~ Build tile walk-in shower  \n􀁸 Furnish & install tile wainscot  \n􀁸 Furnish & install tile floor  \n􀁸 Furnish & install furniture style vanity cabinet with stone countertop ( Price allowance provided)  \n􀁸 New vanity sink & faucet installed ( Price fixture allowance provided)  \n􀁸 New European style ½” frameless glass shower panel (no door)  \n􀁸 New shower plumbing fixtures installed ( Price fixture allowance provided)  \n􀁸 New bath accessory hardware installed ( Price hardware allowance provided)  \n􀁸 New framed vanity mirror installed ( Price mirror allowance provided)  \n􀁸 New decorative lighting fixture installed ( Price fixture allowance provided)  \n􀁸 Wallcovering installed above tile wainscot (furnished and installed by designer)  \nMaster Bath  \n􀁸 New shower heads installed (Price fixture allowance provided)  \n􀁸 New framed vanity mirrors installed ( Price mirror allowance provided)  \n􀁸 New decorative vanity & ceiling light fixtures ( Price fixture allowance provided)  \n􀁸 Float walls smooth for faux finishes  \n􀁸 Provide base coat of paint for faux finishes & repaint ceiling  \n1247 Hillcrest Road, Suite 267 Dallas, TX 75230 Phone: 214-495-7200 Fax 214-495-7201  \n[capitalrenovationsgroup.com](capitalrenovationsgroup.com)  \nBudget Estimate  \nProject Superintendent General Liability Insurance Fuel, tolls & phones  \nTrash Disposal Service Progressive Clean-Up Protection Materials & Installation Build Clean dust control system Jobsite Toilet  \nFinal Cleaning Service  \nPrice  \nPrice  \nPrice  \nPrice  \nPrice  \nPrice  \nPrice  \nPrice  \nPrice  \nGeneral & Administrative Price  \nDemo Interior Price  \n\n| Demo | Price |\n| --- | --- |\n| Trim Carpentry Labor | Price |\n| Trim Materials | Price |\n| Vanity & Top at hall/powder bath (Ann Sacks) | Price |\n| Mil","cbCaiuyyMRbvlH7f","https://ap.wps.com/l/cbCaiuyyMRbvlH7f","pdf",140814,"English","# General & Administrative\n## Kitchen & Butler’s Pantry\n## Nook\n## Wet Bar\n## Hall/Powder Bath\n## Master Bath\n# Budget Estimate","[{\"question\":\"What general responsibilities are included in the proposal?\",\"answer\":\"The proposal includes project supervision, dust protection and site preparation, trash removal and progress clean-up, general liability insurance coverage, and final cleaning of work areas. It also includes sending “pardon or dust” courtesy letters to surrounding neighbors before start.\"},{\"question\":\"What are the kitchen and butler’s pantry scope items?\",\"answer\":\"Work includes removing existing tile backsplashes, vent hood, and sink faucet, then installing new subway tile backsplashes with a herringbone accent behind the cooktop. It also adds or replaces lighting with LED strips, installs under-counter LED lighting at the butler pantry, and updates drawer guides and related components.\"},{\"question\":\"How long is the remodel expected to take and how are start dates determined?\",\"answer\":\"The anticipated duration is 5–6 weeks. Product selections must be made before confirming a start date, and the start date depends on product availability and lead times.\"}]","Interior Remodeling Proposal - Sample | PDF",1789255140]