[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-163557-105":53,"doc-detail-163557-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","information-technology-disaster-recovery-plan-template","Information Technology Disaster Recovery Plan - Template","","Information Technology Disaster Recovery Plan (ITDRP) template defines procedures to recover an IT system quickly and effectively after a service disruption. The plan focuses on contingency operations through three phases: Activation and Notification, Recovery, and Reconstitution, including testing to validate systems before resuming normal operations. It identifies activities, resources, and responsibilities for prolonged interruptions, and emphasizes coordination across organizational personnel, external points of contact, and vendors.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/information-technology-disaster-recovery-plan-template/163557/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/information-technology-disaster-recovery-plan-template/163557.png","ImageObject",442,249,{"name":88,"@type":89},"Logic","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-29","2026-08-31",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",7,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"ITDRP 的主要目的是什么？","Question",{"text":109,"@type":110},"ITDRP用于在服务中断后，建立一套可快速、有效恢复[System/System Name]的综合流程与程序，确保关键服务减少过度中断。","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"ITDRP 的三大恢复阶段包含哪些内容？",{"text":114,"@type":110},"Activation and Notification阶段用于启动计划并评估损害范围；Recovery阶段用于恢复系统运行；Reconstitution阶段通过测试验证系统并恢复正常运营。",{"name":116,"@type":107,"acceptedAnswer":117},"本计划的范围（Scope）如何界定？",{"text":118,"@type":110},"范围覆盖[System/System Name]，并按FIPS 199将其归类为“高/中/低”影响系统，且程序设计目标是在RTO期望（XX小时）内实现恢复。","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},163557,1788145414,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":126,"read_time":101},1099513958762,"https://ap-avatar.wpscdn.com/avatar/1000023916a998db790?x-image-process=image/resize,m_fixed,w_180,h_180&k=1784791008015729253","Name of Organization\nInformation Technology Disaster Recovery Plan\nTemplate\nDecember 2021\nRevision History\nInstructions\nThe (Name of Organization) Information Technology Disaster Recovery Plan is designated For Official Use Only (FOUO) and is the property of (Name of Organization). Only (Name of Organization) representatives may distribute this document to individuals on a need-to-know basis. Distribution by other individuals without prior authorization is prohibited. This document is unclassified but contains sensitive information.\n\u0003Table of Contents\n\u0013 TOC \\o \\h \\z \\u \u0014\u0013 HYPERLINK \\l \"_Toc87942630\" \u0014I.\tIntroduction and Purpose\t\u0013 PAGEREF _Toc87942630 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942631\" \u0014II.\tScope\t\u0013 PAGEREF _Toc87942631 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942632\" \u0014III.\tAssumptions\t\u0013 PAGEREF _Toc87942632 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942633\" \u0014IV.\tConcept of Operations\t\u0013 PAGEREF _Toc87942633 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942634\" \u0014System Description\t\u0013 PAGEREF _Toc87942634 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942635\" \u0014Overview of ITDRP Phases\t\u0013 PAGEREF _Toc87942635 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942636\" \u0014Roles and Responsibilities\t\u0013 PAGEREF _Toc87942636 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942637\" \u0014V.\tActivation and Notification\t\u0013 PAGEREF _Toc87942637 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942638\" \u0014Activation Criteria and Procedure\t\u0013 PAGEREF _Toc87942638 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942639\" \u0014Notification\t\u0013 PAGEREF _Toc87942639 \\h \u001410\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942640\" \u0014Outage Assessment\t\u0013 PAGEREF _Toc87942640 \\h \u001410\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942641\" \u0014VI.\tRecovery\t\u0013 PAGEREF _Toc87942641 \\h \u001410\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942642\" \u0014Sequence of Recovery Activities\t\u0013 PAGEREF _Toc87942642 \\h \u001410\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942643\" \u0014Recovery Procedures\t\u0013 PAGEREF _Toc87942643 \\h \u001411\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942644\" \u0014Recovery Escalation Notices/Awareness\t\u0013 PAGEREF _Toc87942644 \\h \u001411\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942645\" \u0014VII.\tReconstitution\t\u0013 PAGEREF _Toc87942645 \\h \u001411\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942646\" \u0014Concurrent Processing\t\u0013 PAGEREF _Toc87942646 \\h \u001411\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942647\" \u0014Validation Data Testing\t\u0013 PAGEREF _Toc87942647 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942648\" \u0014Validation Functionality Testing\t\u0013 PAGEREF _Toc87942648 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942649\" \u0014Recovery Declaration\t\u0013 PAGEREF _Toc87942649 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942650\" \u0014Notifications (Users)\t\u0013 PAGEREF _Toc87942650 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942651\" \u0014Cleanup\t\u0013 PAGEREF _Toc87942651 \\h \u001413\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942652\" \u0014Offsite Data Storage\t\u0013 PAGEREF _Toc87942652 \\h \u001413\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942653\" \u0014Data Backup\t\u0013 PAGEREF _Toc87942653 \\h \u001413\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942654\" \u0014Event Documentation\t\u0013 PAGEREF _Toc87942654 \\h \u001413\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942655\" \u0014Deactivation\t\u0013 PAGEREF _Toc87942655 \\h \u001414\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942656\" \u0014VIII.\tPersonnel Contact List\t\u0013 PAGEREF _Toc87942656 \\h \u001414\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942657\" \u0014IX.\tVendor Contact List\t\u0013 PAGEREF _Toc87942657 \\h \u001415\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942658\" \u0014X.\tDetailed Recovery Procedures\t\u0013 PAGEREF _Toc87942658 \\h \u001415\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942659\" \u0014XI.\tAlternate Processing Procedures\t\u0013 PAGEREF _Toc87942659 \\h \u001416\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942660\" \u0014XII.\tSystem Validation Test Plan\t\u0013 PAGEREF _Toc87942660 \\h \u001416\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942661\" \u0014XIII.\tAlternate Storage, Site, and Telecommunications\t\u0013 PAGEREF _Toc87942661 \\h \u001416\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942662\" \u0014XIV.\tDiagrams (System and Input/Output)\t\u0013 PAGEREF _Toc87942662 \\h \u001418\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942663\" \u0014XV.\tHardware and Software Inventory\t\u0013 PAGEREF _Toc87942663 \\h \u001418\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942664\" \u0014XVI.\tInterconnections Table\t\u0013 PAGEREF _Toc87942664 \\h \u001418\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942665\" \u0014XVII.\tTest and Maintenance Schedule\t\u0013 PAGEREF _Toc87942665 \\h \u001419\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942666\" \u0014XVIII.\tAssociated Plans and Procedures\t\u0013 PAGEREF _Toc87942666 \\h \u001419\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc87942667\" \u0014XIX.\tBusiness Impact Analysis\t\u0013 PAGEREF _Toc87942667 \\h \u001420\u0015\u0015\n\u0015\u0004\nIntroduction and Purpose\nInformation systems are vi","cbCaidjpIvIeDd7E","https://ap.wps.com/l/cbCaidjpIvIeDd7E","docx",68807,20,"English","# Introduction and Purpose\n# Scope\n# Assumptions\n# Concept of Operations\n## System Description\n## Overview of ITDRP Phases\n## Roles and Responsibilities\n# Activation and Notification\n## Activation Criteria and Procedure\n## Notification\n## Outage Assessment\n# Recovery\n## Sequence of Recovery Activities\n## Recovery Procedures\n## Recovery Escalation Notices/Awareness\n# Reconstitution\n## Concurrent Processing\n## Validation Data Testing\n## Validation Functionality Testing\n## Recovery Declaration\n## Notifications (Users)\n## Cleanup\n## Offsite Data Storage\n## Data Backup\n## Event Documentation\n## Deactivation\n# Personnel Contact List\n# Vendor Contact List\n# Detailed Recovery Procedures\n# Alternate Processing Procedures\n# System Validation Test Plan\n# Alternate Storage, Site, and Telecommunications\n# Diagrams (System and Input/Output)\n# Hardware and Software Inventory\n# Interconnections Table\n# Test and Maintenance Schedule\n# Associated Plans and Procedures\n# Business Impact Analysis","[{\"question\":\"ITDRP 的主要目的是什么？\",\"answer\":\"ITDRP用于在服务中断后，建立一套可快速、有效恢复[System/System Name]的综合流程与程序，确保关键服务减少过度中断。\"},{\"question\":\"ITDRP 的三大恢复阶段包含哪些内容？\",\"answer\":\"Activation and Notification阶段用于启动计划并评估损害范围；Recovery阶段用于恢复系统运行；Reconstitution阶段通过测试验证系统并恢复正常运营。\"},{\"question\":\"本计划的范围（Scope）如何界定？\",\"answer\":\"范围覆盖[System/System Name]，并按FIPS 199将其归类为“高/中/低”影响系统，且程序设计目标是在RTO期望（XX小时）内实现恢复。\"}]","Information Technology Disaster Recovery Plan - Template | DOCX"]