[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-240604-105":53,"doc-detail-240604-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","iaq-construction-management-checklist-template-iaq-checklist-template","IAQ Construction Management Checklist Template  | PDF","","IAQ Construction Management Checklist Template provides a structured checklist for managing indoor air quality during building construction. It includes project identification fields (project name, date, address, and completed by) and tabular tracking for each action item, responsible party, location, and comments. The template covers HVAC protection during construction, source control with low VOC and pollutant prevention measures, pathway interruption and dust containment, construction housekeeping, interior surface cleaning, and scheduling controls, with issue dates shown for sample pages.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/iaq-construction-management-checklist-template-iaq-checklist-template/240604/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/iaq-construction-management-checklist-template-iaq-checklist-template/240604.png","ImageObject",442,249,{"name":88,"@type":89},"Aditya","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-23","2026-09-11",true,{"@type":98,"interactionType":99,"userInteractionCount":15},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What information does the IAQ Construction Management Checklist Template collect about the project?","Question",{"text":108,"@type":109},"It collects fields such as project name, date, address, and who completed the checklist, along with item tracking columns for dates begun or completed, responsible party, location, and comments.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"Which areas are covered for HVAC protection during construction?",{"text":113,"@type":109},"The template lists items such as MERV filters for air supply intake and return air opening systems, filter replacement timing, and sealing supply diffusers and return air system openings during dust-producing work.",{"name":115,"@type":106,"acceptedAnswer":116},"What does the checklist include under source control and housekeeping?",{"text":117,"@type":109},"Source control includes using low VOC products, preventing motor vehicle idling, cycling equipment off when not in use, and containing pollutant sources and wet or waste containers. Housekeeping focuses on keeping HVAC equipment clean, cleaning coils/filters/fans/ductwork prior to occupancy, minimizing dust with effective collection, and preventing water accumulation.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},240604,1789286361,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":130,"doc_description":131,"doc_content":132,"file_id":133,"file_url":134,"file_type":135,"file_size":136,"view_count":15,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":79,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":59,"seo_description":61,"update_tm":125,"read_time":73},962085564549,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","IAQ Construction Management Checklist Template","\u003Cp>IAQ Construction Management Checklist Template provides a structured checklist for managing indoor air quality during building construction. It includes project identification fields (project name, date, address, and completed by) and tabular tracking for each action item, responsible party, location, and comments. The template covers HVAC protection during construction, source control with low VOC and pollutant prevention measures, pathway interruption and dust containment, construction housekeeping, interior surface cleaning, and scheduling controls, with issue dates shown for sample pages.\u003C/p>","\u003Cp>Sample Template &nbsp;\u003C/p>\u003Cp>IAQ Construction Management Checklist Template &nbsp;\u003C/p>\u003Cp>Project Name &nbsp; Date &nbsp; Address &nbsp; &nbsp;\u003C/p>\u003Cp>Completed by &nbsp; &nbsp;\u003C/p>\u003Cp>\u003Cbr>\u003C/p>\u003Cp>| Item | Date Begun or Completed | Responsible\u003Cbr>Party | Location (NA if not applicable) | Comment |\u003C/p>\u003Cp>| --- | --- | --- | --- | --- |\u003C/p>\u003Cp>| List of responsible staff and/or contractors, evidence of training, and job descriptions posted | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| &nbsp;| &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| HVAC Protection\u003Cbr>During Construction (As applicable to project) | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| MERV Filter for air supply intake when in use | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| MERV filter at return air opening system when inuse | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Filters replaced when loaded during construction | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Filters replaced prior to IAQ testing, flushout, and prior to occupancy | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Supply diffusers sealed off during dust producing work | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Supply diffusersand return air system opening sealed off when HVAC system isnot in use to prevent accumulation of dust and debris | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>\u003Cbr>\u003C/p>\u003Cp>Issue Date: 10/29/13 &nbsp;\u003C/p>\u003Cp>IAQ Checklist Sample Template Page 1 &nbsp;\u003C/p>\u003Cp>Sample Template &nbsp;\u003C/p>\u003Cp>\u003Cbr>\u003C/p>\u003Cp>| Item | Date Begun or Completed | Responsible\u003Cbr>Party | Location (NA if not applicable) | Comment |\u003C/p>\u003Cp>| --- | --- | --- | --- | --- |\u003C/p>\u003Cp>| Mechanical room not used for storage of construction or waste materials | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Periodic dust inspection conducted during construction activities | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Ducts professionally cleaned | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| &nbsp;| &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Source Control | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Low VOC products used in accordance with specifications | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| No idling of motor vehicles where emissions may be drawn into building | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Equipment cycled off when not in use | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Pollutant sources exhaust to outside of building and prevented from recirculating back into building | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Containers\u003Cbr>containing wet products are kept covered to the extent practical | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Containers of waste material that release dust or odors are kept covered | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| On site stored materials protected from elements to prevent absorption of moisture | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| &nbsp;| &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>\u003Cbr>\u003C/p>\u003Cp>Issue Date: 10/29/13 &nbsp;\u003C/p>\u003Cp>IAQ Checklist Sample Template Page 2 &nbsp;\u003C/p>\u003Cp>Sample Template &nbsp;\u003C/p>\u003Cp>\u003Cbr>\u003C/p>\u003Cp>| Item | Date Begun or Completed | Responsible\u003Cbr>Party | Location (NA if not applicable) | Comment |\u003C/p>\u003Cp>| --- | --- | --- | --- | --- |\u003C/p>\u003Cp>| Pathway Interruption | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Dust curtains or temporary enclosures provided to prevent dust from migrating to other areas | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Pollutant sources located as far as possible from occupied areas where feasible | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Work areas isolated to prevent contaminate of clean or occupied areas | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Outside air used to exhaust contaminated air directly to outside during installation of VOC emitting materials | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| &nbsp;| &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Construction Housekeeping | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| HVAC equipment cleaned regularly to remove contaminants prior to occupancy | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Coils, filters, fans, ductwork kept clean during installation; cleaned prior to occupancy | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Dust suppressed and minimized; effective dust collection methods used | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Water not allowed to accumulate; porous materials protected | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>\u003Cbr>\u003C/p>\u003Cp>Issue Date: 10/29/13 &nbsp;\u003C/p>\u003Cp>IAQ Checklist Sample Template Page 3 &nbsp;\u003C/p>\u003Cp>Sample Template &nbsp;\u003C/p>\u003Cp>\u003Cbr>\u003C/p>\u003Cp>| Item | Date Begun or Completed | Responsible\u003Cbr>Party | Location (NA if not applicable) | Comment |\u003C/p>\u003Cp>| --- | --- | --- | --- | --- |\u003C/p>\u003Cp>| Interior surfaces | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| thoroughly cleaned prior to replacing HVAC filters and balancing and testing HVAC system | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| &nbsp;| &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Scheduling | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| High pollutant | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| activities | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| scheduled prior to installation of absorbent materials | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| &nbsp;| &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| &nbsp;| &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| End of Sample | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>| Checklist | &nbsp;| &nbsp;| &nbsp;| &nbsp;|\u003C/p>\u003Cp>\u003Cbr>\u003C/p>\u003Cp>Issue Date: 10/29/13 &nbsp;\u003C/p>\u003Cp>IAQ Checklist Sample Template Page 4\u003C/p>","cbCaigJMYtBhHrEP","https://ap.wps.com/l/cbCaigJMYtBhHrEP","pdf",77682,"English","# IAQ Construction Management Checklist Template\n## Project Information\n## HVAC Protection During Construction\n## Source Control\n## Pathway Interruption\n## Construction Housekeeping\n## Interior Surfaces\n## Scheduling\n## End of Sample Checklist","[{\"question\":\"What information does the IAQ Construction Management Checklist Template collect about the project?\",\"answer\":\"It collects fields such as project name, date, address, and who completed the checklist, along with item tracking columns for dates begun or completed, responsible party, location, and comments.\"},{\"question\":\"Which areas are covered for HVAC protection during construction?\",\"answer\":\"The template lists items such as MERV filters for air supply intake and return air opening systems, filter replacement timing, and sealing supply diffusers and return air system openings during dust-producing work.\"},{\"question\":\"What does the checklist include under source control and housekeeping?\",\"answer\":\"Source control includes using low VOC products, preventing motor vehicle idling, cycling equipment off when not in use, and containing pollutant sources and wet or waste containers. Housekeeping focuses on keeping HVAC equipment clean, cleaning coils/filters/fans/ductwork prior to occupancy, minimizing dust with effective collection, and preventing water accumulation.\"}]"]