[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243064-105":53,"doc-detail-243064-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","i84-the-dalles-fifteenmile-creek-construction-timeline","I84: The Dalles – Fifteenmile Creek Construction Timeline","","This document outlines the construction timeline for the I84: The Dalles – Fifteenmile Creek project, with updates provided as of January 28, 2015. The timeline details traffic control measures and related construction activities throughout Spring 2015, Summer 2015, Fall 2015, Winter 2015/16, and Spring 2016. Specific traffic management plans include maintaining two lanes open in the eastbound direction while one lane remains open westbound during certain periods. Notably, Thanksgiving Weekend 2015 is highlighted with the freeway expected to be open to two lanes in each direction. However, other periods, such as Thanksgiving Weekend 2015, will involve traffic placed in one lane each direction, with various configurations occurring. Construction activities are segmented by direction and location, including Eastbound Concrete Pavement Construction, Eastbound Threemile Bridge Foundation Construction, Westbound Concrete Pavement Construction, Westbound Threemile Bridge Foundation Construction, Roadwork adjacent to Threemile Bridge & Ramp Work, and Eastbound Threemile Bridge Construction. This comprehensive timeline aims to inform the public about upcoming roadwork and its impact on traffic flow.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":51,"@type":70,"position":76},"https://docshare.wps.com/template/general/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/i84-the-dalles-fifteenmile-creek-construction-timeline/243064/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/i84-the-dalles-fifteenmile-creek-construction-timeline/243064.png","ImageObject",442,249,{"name":88,"@type":89},"Asher","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-09-21","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":73},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the primary focus of this document?","Question",{"text":108,"@type":109},"This document details the construction timeline for the I84: The Dalles – Fifteenmile Creek project, including traffic control and related construction activities.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What were the traffic conditions during Thanksgiving Weekend 2015?",{"text":113,"@type":109},"During Thanksgiving Weekend 2015, the freeway was open to two lanes in each direction.",{"name":115,"@type":106,"acceptedAnswer":116},"What are the major construction activities planned?",{"text":117,"@type":109},"Planned activities include Eastbound and Westbound Concrete Pavement Construction, Eastbound and Westbound Threemile Bridge Foundation Construction, and Roadwork adjacent to Threemile Bridge & Ramp Work.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},243064,1790012837,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":50,"category_name":51,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":73,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":60,"faqs":136,"seo_title":137,"seo_description":61,"update_tm":138,"read_time":4},687197207639,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","| I84: The Dalles – Fifteenmile Creek Construction Timeline\u003Cbr>Last Updated: January 28, 2015 |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| |  | 2 Lanes Open in Eastbound Direction, 1 Lane Open in Westbound Direction\u003Cbr>\u003Cbr>|  |  | \u003Cbr>THANKSGIVING WEEKEND 2015\u003Cbr>Freeway Open to 2 Lanes Each Direction |  | \u003Cbr>Traffic placed in 1 Lane Each Direction Various 1 Lane Configurations will occur during this timeframe. |  |  |  |  |\n| \u003Cbr>\u003Cbr>Spring 2015  Summer 2015  Fall 2015  Winter 2015/16  Spring 2016 |  |  |  |  |  |  |  |  |  |  |  |\n| | \u003Cbr>Eastbound Concrete Pavement Construction\u003Cbr>Eastbound Threemile Bridge Foundation Construction |  | | \u003Cbr>Westbound Concrete Pavement Construction\u003Cbr>Westbound Threemile Bridge Foundation Construction |  | \u003Cbr>Roadwork adjacent to Threemile Bridge & Ramp Work\u003Cbr>Eastbound Threemile Bridge Construction |  | | | |  |\n| TRAFFIC CONTROL RELATED\u003Cbr>CONSTRUCTION ACTIVITY RELATED |  |  |  |  |  |  |  |  |  |  |  |","cbCaiaiK0ltNKG9P","https://ap.wps.com/l/cbCaiaiK0ltNKG9P","pdf",19364,"English","[{\"question\":\"What is the primary focus of this document?\",\"answer\":\"This document details the construction timeline for the I84: The Dalles – Fifteenmile Creek project, including traffic control and related construction activities.\"},{\"question\":\"What were the traffic conditions during Thanksgiving Weekend 2015?\",\"answer\":\"During Thanksgiving Weekend 2015, the freeway was open to two lanes in each direction.\"},{\"question\":\"What are the major construction activities planned?\",\"answer\":\"Planned activities include Eastbound and Westbound Concrete Pavement Construction, Eastbound and Westbound Threemile Bridge Foundation Construction, and Roadwork adjacent to Threemile Bridge \\u0026 Ramp Work.\"}]","I84: The Dalles – Fifteenmile Creek Construction Timeline | PDF",1789199202]