[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243061-105":53,"doc-detail-243061-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","husky-stadium-renovation-key-construction-milestones","Husky Stadium Renovation - Key Construction Milestones","","This document outlines the key construction milestones for the Husky Stadium Renovation project. It provides a timeline with specific dates for major events, including the Board of Regents approval, groundbreaking, demolition of existing structures, excavation, steel erection, exterior and interior construction of new facilities, scoreboard installation, landscaping, and the grand opening. The projected completion date for the grand opening is marked as November 7, 2011, with the UW vs. Boise State game. Key dates and phases are visually represented through a timeline format, detailing the sequence of construction activities from November 2010 through November 2011. The document also specifies the removal and offsite reuse of the field and the demolition of the north lower bowl and west structure. Excavation for the FB operations building and all structures is detailed, along with the steel erection for the FB operations building and south stands. The construction of exterior and interior elements for both the FB operations building and the south stands are also itemized, leading up to the installation of a new scoreboard and completion of landscaping.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":51,"@type":70,"position":76},"https://docshare.wps.com/template/general/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/husky-stadium-renovation-key-construction-milestones/243061/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/husky-stadium-renovation-key-construction-milestones/243061.png","ImageObject",442,249,{"name":88,"@type":89},"Noah","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-09-23","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":76},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What are the key milestones for the Husky Stadium Renovation?","Question",{"text":108,"@type":109},"The key milestones include Board of Regents approval, groundbreaking, demolition of existing structures, excavation, steel erection, construction of exterior and interior elements, new scoreboard installation, landscaping, and the grand opening.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"When is the grand opening of the renovated Husky Stadium?",{"text":113,"@type":109},"The grand opening of the renovated Husky Stadium is scheduled for November 7, 2011, coinciding with the UW vs. Boise State game.",{"name":115,"@type":106,"acceptedAnswer":116},"What demolition work was performed as part of the renovation?",{"text":117,"@type":109},"Demolition included the north lower bowl, west structure, and the south stands structure. The field was also removed for offsite reuse.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},243061,1789199198,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":50,"category_name":51,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":76,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":125,"read_time":4},8796095462418,"https://ap-avatar.wpscdn.com/avatar/80000253c1241d02b47?x-image-process=image/resize,m_fixed,w_180,h_180&k=1778826106357471780","HUSKY STADIUM RENOVATION • KEY CONSTRUCTION MILESTONES  \n\n| DEC |  |\n| --- | --- |\n|  |  |\n| \u003Cbr>JAN\u003Cbr>FEB\u003Cbr>MAR\u003Cbr>APRIL\u003Cbr>MAY\u003Cbr>JUN\u003Cbr>JUL\u003Cbr>AUG\u003Cbr>SEP\u003Cbr>OCT\u003Cbr>NOV\u003Cbr>DEC\u003Cbr>|  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n| \u003Cbr>JAN\u003Cbr>FEB\u003Cbr>MAR\u003Cbr>APRIL\u003Cbr>MAY\u003Cbr>JUN\u003Cbr>JUL\u003Cbr>AUG |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n|  |  |\n\nOF REGENTS APPROVE  \nBOARD  \nPROJECT  \nGROUNDBREAKING  \nSEPT. 7, 2013  GRAND OPENING: UW vs BOISE STATE  \nNOV. 7, 2011  \n18, 2010  \nNOV.  \nﬁeld removed and reused off site  \ndemolition of north lower bowl and west structure  \nbegin excavation for fb operations building  \ncompletion of  \nexcavation  \nfor all structures  \nsteel erection for fb operation building on west side of stadium  \nsteel erection for south  \nstands  \nconstruction of exterior skin on fb operations building  \nconstruction of south stands exterior skin  \nconstruction of interior of fb operations building  \nof south  \nstands interior  \nconstruction  \nstructure  \ndemolition of  \nsouth stands  \nbegin new scoreboard installation  \nlandscaping  \ninstall new ﬁeld","cbCaio3OjH087ExZ","https://ap.wps.com/l/cbCaio3OjH087ExZ","pdf",728234,"English","# Husky Stadium Renovation\n## Key Construction Milestones\n\n*   **November 18, 2010**: Board of Regents approve project\n*   **November 7, 2011**: Groundbreaking\n*   **Grand Opening**: UW vs Boise State (Date not specified for groundbreaking, but likely precedes grand opening)\n\n### Timeline of Events:\n\n*   Demolition of north lower bowl and west structure\n*   Begin excavation for FB operations building\n*   Completion of excavation for all structures\n*   Steel erection for FB operations building on west side of stadium\n*   Steel erection for south stands\n*   Construction of exterior skin on FB operations building\n*   Construction of south stands exterior skin\n*   Construction of interior of FB operations building\n*   Construction of south stands interior\n*   Demolition of south stands structure\n*   Begin new scoreboard installation\n*   Landscaping\n*   Install new field\n\n**Note**: The provided text and image contain a timeline that spans from NOV 2010 through NOV 2011, with a specific event of 'Grand Opening: UW vs Boise State' on NOV 7, 2011. The 'Board of Regents Approve Project' milestone is listed as NOV 18, 2010. The image also shows a calendar grid for 2011, suggesting the project primarily occurred within that year. The phrase 'Field removed and reused off site' indicates an environmental consideration.","[{\"question\":\"What are the key milestones for the Husky Stadium Renovation?\",\"answer\":\"The key milestones include Board of Regents approval, groundbreaking, demolition of existing structures, excavation, steel erection, construction of exterior and interior elements, new scoreboard installation, landscaping, and the grand opening.\"},{\"question\":\"When is the grand opening of the renovated Husky Stadium?\",\"answer\":\"The grand opening of the renovated Husky Stadium is scheduled for November 7, 2011, coinciding with the UW vs. Boise State game.\"},{\"question\":\"What demolition work was performed as part of the renovation?\",\"answer\":\"Demolition included the north lower bowl, west structure, and the south stands structure. The field was also removed for offsite reuse.\"}]","Husky Stadium Renovation - Key Construction Milestones | PDF"]