[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-253655-105":53,"doc-detail-253655-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","hrverv-balancing-report-r-1219","HRV/ERV Balancing Report - r 12/19","","HRV/ERV Balancing Report template used to document commissioning, start-up inspection, and on-site testing of heat recovery ventilation and energy recovery ventilation systems. It covers equipment installation checks (duct sealing, insulation, hoods/grilles, dampers access, filters, condensate drain, clearances, and labeled fresh air intake), site readiness items, HRV/ERV design capacity inputs, actual measured airflow and speed settings, and the certification statement confirming balancing meets the referenced building code requirements in Section 5.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/hrverv-balancing-report-r-1219/253655/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/hrverv-balancing-report-r-1219/253655.png","ImageObject",442,249,{"name":88,"@type":89},"Lucas Martin","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-29","2026-09-13",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",19,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What items are checked during the start-up inspection for HRV/ERV systems?","Question",{"text":109,"@type":110},"The form verifies fans operation, correct flows, duct sealing and insulation where needed, hood/grille installation, damper access, clean filters, proper condensate drain, grease filter for kitchen exhaust, required clearances, correct exhaust outlet and fresh air inlet placement and labeling, and air distribution to all habitable rooms.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How is HRV/ERV capacity determined when a design is available versus not available?",{"text":114,"@type":110},"If design is available, a copy is attached. If not, the report requires bedroom and habitable room counts, then uses the appropriate code or standard tables to determine PVC and/or TVC capacity.",{"name":116,"@type":107,"acceptedAnswer":117},"What does the certification section require?",{"text":118,"@type":110},"The certifying person confirms the HRV/ERV has been balanced to meet the building code requirements referenced in Section 5, and provides a signature, date, and HRAI number.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},253655,1789268421,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":73,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":126,"read_time":9},8796095360427,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","RESET  \n\n| HRV/ERV Balancing Report |  |  |\n| --- | --- | --- |\n| 1. BUILDING | 6. START-UP INSPECTION |  |\n| Municipality:   Address:   | Fans are operating and clean Flows are correct\u003Cbr>Ducts are sealed\u003Cbr>Ducts are insulated with vapour barrier, where needed Hoods/grilles are installed\u003Cbr>Hoods are installed Dampers are accessible Filters are clean\u003Cbr>Condensate drain is properly installed\u003Cbr>Grease filter is installed for kitchen exhaust Kitchen exhaust has 40\" clearance from the range Controls are functioning\u003Cbr>Exhaust outlet is installed 4\" above grade Fresh air inlet is installed 18\" above grade Fresh air inlet is labelled\u003Cbr>Inlet is located to avoid contamination from exhausts Inlet is 3' away from oil fill pipes, gas regulators, etc. Air distribution to all habitable rooms (non-forced air) Interlocked to a forced air system (if required) |  |\n| 2. TECHNICIAN |  |  |\n| Name:   Company:   Address:   Phone:   E-mail: |  |  |\n|  |  |  |\n| 3. TEST EQUIPMENT |  |  |\n| Flow Station:  Manometer: |  |  |\n| 4. SITE INSPECTION |  |  |\n| Power Available\u003Cbr>House Substantially Complete Air/vapour Barrier\u003Cbr>Other HVAC Equipment Operational Doors, Windows, Attic Hatches Closed Fireplace Doors and Dampers Closed All Other Exhaust Equipment Off |  |  |\n| 5. HRV/ERV DESIGN | 7. HRV/ERV FLOW MEASUREMENTS |  |\n| Design Available:\u003Cbr>Yes If yes, attach a copy\u003Cbr>No\u003Cbr>If no, complete the information below and then use the tableson the reverse page to determine the PVC and/or TVC based on the appropriate code or standard.\u003Cbr>NBC OBC BCBC CSA F326\u003Cbr>\\# of Bedrooms:   \\# of Habitable Rooms:  \u003Cbr>Capacity:   PVC or 40-60% TVC H L\u003Cbr>Capacity:   2.5 x PVC or TVC H L | Equipment same as design\u003Cbr>Or record\u003Cbr>Make:   Model:   |  |\n|  | Actual Measured Airflow Exhaust\u003Cbr>Manometer Reading Airflow\u003Cbr>Speed Setting\u003Cbr>Supply\u003Cbr>Manometer Reading Airflow\u003Cbr>Speed Setting | High Speed Low Speed\u003Cbr>|\n| 8. CERTIFICATION |  |  |\n| I,   certify that the HRV/ERV at this location has been balanced to meet the requirements of the building code referenced in Section 5.\u003Cbr>Signature:   Date:   HRAI \\#: |  |  |\n\n© Copyright HRAI  \nHRV/ERV Balancing Report  \nr 12/19  \n\n| National Building Code\u003Cbr>Capacity\u003Cbr>Use Table [9.32.3.3](9.32.3.3) for PVC. Balance on high speed.\u003Cbr>If the range hood is NOT vented outside record 2.5 x PVC as well.\u003Cbr>Balancing Speed\u003Cbr>If the range hood is NOT vented outside balance the PVC on low speed and also verify that high speed meets 2.5 x PVC.\u003Cbr>Otherwise balance the PVC on high speed. | |  |\n| --- | --- | --- |\n| Ontario Building Code\u003Cbr>Capacity\u003Cbr>Use Table [9.32.3.4](9.32.3.4).A for the PVC.\u003Cbr>Use CSA F326 Table 1 for the TVC\u003Cbr>Balancing Speed\u003Cbr>If the HRV services at least one bathroom or kitchen then balance the PVC on low speed and the TVC on high speed.\u003Cbr>Otherwise balance the PVC on high speed. |  | |\n| British Columbia Building Code\u003Cbr>Capacity\u003Cbr>Use Table [9.32.3.5](9.32.3.5) for the PVC.\u003Cbr>Balancing Speed\u003Cbr>Balance the PVC on high speed. | |  |\n| CSA F326\u003Cbr>Capacity\u003Cbr>Use Table 1 for the TVC.\u003Cbr>Record 40-60% of TVC as well (e.g. half capacity) .\u003Cbr>Balancing Speed\u003Cbr>Balance the TVC on high speed and the half capacity on low speed. |  | |\n\n© Copyright HRAI  \nHRV/ERV Balancing Report  \nr 12/19","cbCaipvJHpCkJFgu","https://ap.wps.com/l/cbCaipvJHpCkJFgu","pdf",1001254,"English","# HRV/ERV Balancing Report\n## 1. Building\n## 2. Technician\n## 3. Test Equipment\n## 4. Site Inspection\n## 5. HRV/ERV Design\n## 6. Start-up Inspection\n## 7. HRV/ERV Flow Measurements\n## 8. Certification","[{\"question\":\"What items are checked during the start-up inspection for HRV/ERV systems?\",\"answer\":\"The form verifies fans operation, correct flows, duct sealing and insulation where needed, hood/grille installation, damper access, clean filters, proper condensate drain, grease filter for kitchen exhaust, required clearances, correct exhaust outlet and fresh air inlet placement and labeling, and air distribution to all habitable rooms.\"},{\"question\":\"How is HRV/ERV capacity determined when a design is available versus not available?\",\"answer\":\"If design is available, a copy is attached. If not, the report requires bedroom and habitable room counts, then uses the appropriate code or standard tables to determine PVC and/or TVC capacity.\"},{\"question\":\"What does the certification section require?\",\"answer\":\"The certifying person confirms the HRV/ERV has been balanced to meet the building code requirements referenced in Section 5, and provides a signature, date, and HRAI number.\"}]","HRV/ERV Balancing Report - r 12/19 | PDF"]